Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Replacement Of Existing / Laying 150/100mm Dia Water Supply Pipe Line
|
| Description |
Replacement Of Existing 150/100mm Dia Water Supply Pipe Line From Al Madina Kirana Store To Shaik Dilwar General Store And Another 3 Lanes I.E. Plot. No. 59/60, 59/60/10, 59/60/7, 59/60/40, 19 89 To 59/60, Handicapped Colony, Fatimat Nagar Under Vattepally Section 2) Extension Of Pipe Line By Laying Of 100mm Dia Pipe Line At H.No. 19 4 8/357/A To 19 4 8/367, Al Jubail Nagar Under Vattepally Section 3) Laying Of 100 Mm Dia Water Supply Pipeline And Making Junction With 200/100 Sluice Valves Opp. Lane To A1 Tours And Travels In New Akber Colony Under Vattepally Section, Sub Division Iv Of Operations And Maintenance Division I
|
| Organisation | Information Technology Electronics and Communication Department Telangana | State Govt. and UT |
| Tender Id | 490164 |
|
Reference Number |
382/CGM(E)/OM C.I/D1/2023-24, Dt.09.01.2024 |
| Tender Fee | 169 |
| EMD | 4755 |
| Tender Value | - |
| Place | TS |
| Link |
View Original Tender Notice
http://eprocurement.telangana.gov.in/ |
| Start Date | January 09, 2024 23:30 |
| End Date |
Expired
16/01/2024
Expired 984 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supply, erection, testing, commissioning of (i) 132/11kv ss at buggamadharam (ii) 132kv dc line to proposed 132/11kv ss at buggamadharam from existing 220/132kv sithapuram ss (3.60 km) and (iii) 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under rajiv gandhi lift irrigation scheme on turnkey basis.
Supply, erection, testing, commissioning of (i) 132/11kv ss at buggamadharam (ii) 132kv dc line to proposed 132/11kv ss at buggamadharam from existing 220/132kv sithapuram ss (3.60 km) and (iii) 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under rajiv gandhi lift irrigation scheme on turnkey basis.
Read moreSupply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis
Supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis.
Read moreLaying of 150/100mm dia di water supply pipe line
Laying of 150/100mm dia di water supply pipe line from plot no.75 vikaspuri colony to via lovely beauty parlour to h.no.8-4-548/36/4 to h.no.8-4-548/36/39, oxford school to 8-3-167/a/2 situated at b.shankarlal nagar area for improvement of water supply under erragadda section, sd-ii, o and m division no.vi
Read moreLaying of 100mm dia water supply pipe line
Laying of 100mm dia water supply pipeline from h.no.i kids high school to 19-3-294/264/53 to 19-3-294/264/167 towards part of plot no.19 bismillah wahed masjid road habeeb nagar noor colony under vattepally section 2) laying of 100mm dia water supply pipeline from plot no.59 (door no.19-3-294/35/a/1) to h.no.19-3-294/h/8 to part of plot no.19 bismillah wahed masjid road habeeb nagar guntal under vattepally section, sub division-iv of operations and maintenance division-i
Read moreLaying of 100mm dia water supply pipe line
Laying of 100 mm dia water supply pipeline from h.no plot no 47, near omer shaw masjid shama colony to h.no 8-15-96/168/a, 8-15- 96/186/35/1 towards air cutting shop, adil sha colony, guntal under vattepally section, sub division-iv of operations and maintenance division-i
Read moreLaying of 100mm dia water supply pipe line
Laying of 100 mm dia water supply pipeline from h.no plot no 47, near omer shaw masjid shama colony to h.no 8-15-96/168/a, 8-15- 96/186/35/1 towards air cutting shop, adil sha colony, guntal under vattepally section, sub division-iv of operations and maintenance division-i (reserved for st contractors only as per g.o.ms.no.59, icad (reforms) department dated:21.05.2018) (1st recall)
Read moreExtension of 150/100mm dia water supply pipe line
Extension of 100mm dia water supply pipeline from h.no.8-15-52/2 to 8-15-52/49, 8-15-52/c upto saifullah masjid, saifi colony, guntal under vattepally section, sub division-iv of operations and maintenance division-i
Read moreLaying of 150/100mm dia di pipe line for providing water supply connection
Laying of 150/100mm dia di pipe line for providing water supply connection to moiz housing projects md. mudassar moiz 8-3-678/132/133/1, imamguda, yellareddyguda under yellareddyguda section, sub div-ii of o and m div.vi vide file no.2022-8-2545
Read moreLaying of 100mm dia di water supply pipe line
Laying of 100mm dia di water supply pipe line from h.no.23-5-710 to 23-5-712/3 at nagulachinta under moghalpura section, sub division-iii of operations and maintenance division-i (reserved for sc contractors only as per g.o.ms.no.59, icad (reforms) department dated:21.05.2018)
Read moreLaying of 100mm dia di water supply pipe line
Laying of 100mm dia di water supply pipe line from h.no.23-4-220 to 23-4-576 at sultan shahi under moghalpura section, sub division-iii of operations and maintenance division-i
Read moreof your Industry type