Tender Details
About Tender
🛣️ Road Infrastructure Enhancement Project For Dharmapuri District 🛣️ The Rural Development And Panchayat Raj Department Of The State Government And Ut Is Initiating A Significant Road Infrastructure Enhancement Project For Dharmapuri District. 🚧 📍 Project Scope: Strengthening The Road From Podarankottai Road To Kadukkapattiyankottai Road Km.0/0 0/600, Head Office, Maniyathahalli. Strengthening The Road From Mallichettikuttai To Kurumpattiyankottai Road Km.0/0 0/850, Head Office, Maniyathahalli. 📅 Bid Submission Deadline: July 12, 2024, 3:00 Pm A Tender Fee Of Inr 52,000 Is Applicable As Earnest Money Deposit (Emd). Interested Contractors Must Submit Detailed Bids, Including Technical And Financial Proposals, Adhering To The Project Specifications And Timelines. Keywords: Road Infrastructure, Dharmapuri District, Rural Development And Panchayat Raj Department, Tender, Emd, Civil Construction, Road Strengthening, Government Project, Ut, Tn04 09/2024 25Particulars | Details |
---|---|
Title |
Dharmapuri District Strengthening The Road From Podarankottai Road To Kadukkapattiyankottai Road Km.0/0 0/600 And Strengthening The Road From Mallichettikuttai To Kurumpattiyankottai Road Km.0/0 0/850 In Package No.Tn04 09/2024 25
|
Description |
Strengthening The Road From Podarankottai Road To Kadukkapattiyankottai Road Km.0/0 0/600 H/O.Maniyathahalli And Strengthening The Road From Mallichettikuttai To Kurumpattiyankottai Road Km.0/0 0/850 H/O.Maniyathahalli
|
Organisation | Rural Development and Panchayat Raj Department | State Govt. and UT |
Tender Id | 2024_RDTN_459405_1 |
Reference Number |
Roc.No.1650/2024/R2 MGSMT P09 |
Tender Fee | 0 |
EMD | 52000 |
Tender Value | |
Place | DRDA, Dharmapuri |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=546093 |
Start Date | July 04, 2024 17:30 |
End Date |
19/07/2024 ( Expired 276 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreConsultancy services for ae for supervision of rehabilitation and up-gradation from design ch km 35.300 to km 65.740 of nh-166g (gaganbawada to kale) to 2lps in the state of maharashtra on epc mode
Consultancy services for ae for supervision of rehabilitation and up-gradation from design ch km 35.300 to km 65.740 of nh-166g (gaganbawada to kale) to 2lps in the state of maharashtra on epc mode.
Read moreConsultancy services for ae for supervision of rehabilitation and up-gradation to 2lps of kalyan - murbad - malshej ghat - nirmal road nh-61 from km 37-850 to km 57-900 (murbad to kadampada section) in the state of maharashtra on epc mode.
Consultancy services for ae for supervision of rehabilitation and up-gradation to 2lps of kalyan - murbad - malshej ghat - nirmal road nh-61 from km 37-850 to km 57-900 (murbad to kadampada section) in the state of maharashtra on epc mode.
Read moreServices of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.
Services of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.
Read moreConsultancy services for authoritys engineer for supervision of widening/improvement of existing road to nhdl specifications of road changwinti walong namti from km 0.000 to km 54.450 and hayuliang-changwinti between km 45.050 to km 50.820
Consultancy services for authoritys engineer for supervision of widening/improvement of existing road to nhdl specifications of road changwinti walong namti from km 0.000 to km 54.450 and hayuliang-changwinti between km 45.050 to km 50.820
Read moreConstruction of service road and slip road between km450.170 to km 471.300 zarap to patradevi section of nh.66 in the state of maharashtra on epc mode
Construction of service road and slip road between km450.170 to km 471.300 zarap to patradevi section of nh.66 in the state of maharashtra on epc mode
Read moreRenewal of the wearing surface of the road pavement from km 368.147 to km 421.196 of dindigul - samayanallur section of nh-44 in the state of tamil nadu on item rate basis at the risk and cost of concessionaire
Renewal of the wearing surface of the road pavement from km 368.147 to km 421.196 of dindigul - samayanallur section of nh-44 in the state of tamil nadu on item rate basis at the risk and cost of concessionaire
Read moreRehabilitation and upgradation of ramachandrapuram village limits from km.37.950 to km.38.950 of ibrahimpatnam to ap/telangana border section of nh-30 in the state of andhra pradesh on epc mode.
Rehabilitation and upgradation of ramachandrapuram village limits from km.37.950 to km.38.950 of ibrahimpatnam to ap/telangana border section of nh-30 in the state of andhra pradesh on epc mode.
Read moreConsultancy services of ae for construction of 6-lane patna ring road highway nh-131g from kanhauli to sherpur from km.0.000-km8.480 including junction development with bihta-danapur elevated corridor app.length-1.5 km on epc mode in bihar l-9.98km
Consultancy services of ae for construction of 6-lane patna ring road highway nh-131g from kanhauli to sherpur from km.0.000-km8.480 including junction development with bihta-danapur elevated corridor app.length-1.5 km on epc mode in bihar l-9.98km
Read moreof your Industry type