Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Decorative Lighting Arrangement At Balurghat Gate
|
| Description |
Decorative Lighting Arrangement At Balurghat Gate
|
| Organisation | Government of West Bengal |
| Tender Id | 2023_MAD_591962_1 |
|
Reference Number |
MAD/ULB/BLGT/ELEC/03/23-24 |
| Tender Fee | 0 |
| EMD | 12973 |
| Tender Value | - |
| Place | Balurghat Municipality |
| Link |
View Original Tender Notice
https://wbtenders.gov.in |
| Start Date | October 16, 2023 21:25 |
| End Date |
Expired
04/11/2023
Expired 1064 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supply and commissioning of turbo ventilators for use at mws, kgm of sccl. in division no:corp-mp.
Supply and commissioning of turbo ventilators for use at mws, kgm of sccl. in division no:corp-mp.
Read moreDevelopment, operation and maintenance of ropeway and glass bridge skywalk at bhadrakali lake on dbfot mode for a period of 30 years
Development, operation and maintenance of ropeway and glass bridge skywalk at bhadrakali lake on dbfot mode for a period of 30 years
Read moreHiring of 2 nos. of diesel operated wheel mounted loaders with backhoe bucket (0.26 cu.m) and loading bucket (1.1 cu.m) for 36 months one at each section of pkoc, manuguru for improvement of quality of coal - reg.
Hiring of 2 nos. of diesel operated wheel mounted loaders with backhoe bucket (0.26 cu.m) and loading bucket (1.1 cu.m) for 36 months one at each section of pkoc, manuguru for improvement of quality of coal - reg.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreArrangement for providing decorative lighting during durga/kali puja at
Arrangement for providing decorative lighting during durga,kali puja at pts,tts fhc, ananda mela, flower ,chat puja at pts at ntpc,farakka .
Read moreSitc of decorative pole erection and lighting arrangement work at seeta sarotalab jabalpur
Sitc of decorative pole erection and lighting arrangement work at seeta sarotalab jabalpur
Read moreof your Industry type