Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Foot Over Bridge Between Newly Constructed Court Building And Tis Hazari Court Complex At Boulevard Road Under Sub Division I Of Division Srdp I, Delhi (Sh Aesthetic Work Of Existing Fob At Boulevard Road Under Sub Division 1/Srdp 1
|
Description |
Construction Of Foot Over Bridge Between Newly Constructed Court Building And Tis Hazari Court Complex At Boulevard Road Under Sub Division I Of Division Srdp I, Delhi (Sh Aesthetic Work Of Existing Fob At Boulevard Road Under Sub Division 1/Srdp 1
|
Organisation | Public Works Department | State Govt. and UT |
Tender Id | 2025_PWD_271194_1 |
Reference Number |
09/EE/SRDP-I/PWD/2025-26 |
Tender Fee | 0 |
EMD | 2.61 Lakh |
Tender Value | |
Place | Under Sub Division I |
Link | https://govtprocurement.delhi.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=356347 |
Start Date | April 29, 2025 14:30 |
End Date |
05/05/2025 ( Expired 39 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Long-term rectification of morth identified blackspots by (i) construction of 6 lane vup (1x20mx5.5m) at cmc junction tg-04-11. (ii) construction of service road along with foot over bridge near govt. junior college, sadashivnagar tg-04-18 on nag-hyd
Long-term rectification of morth identified blackspots by (i) construction of 6 lane vup (1x20mx5.5m) at cmc junction tg-04-11. (ii) construction of service road along with foot over bridge near govt. junior college, sadashivnagar tg-04-18 on nag-hyd
Read moreAAAAAAAAAA
Login to viewMoei fans rmo booster p/in the r/o hmps flats/bungalows at pandara park pandara road under sub div-i, ded-201, new delhi, dg 2025-26. (sh: provision of electrical points, wiring, led light supply of cables etc.)
Read moreAAAAAAAAAA
Login to viewMoei fans, rmo booster p/set in the r/o hmps bungalows under ferozshah road sub division-1, ded-201, dg. 2025-26. (sh: replacement of bollard, led fixture ei work at ab-3 purana quila road)
Read moreAAAAAAAAAA
Login to viewA.r. m.o. 196 hmps flats at south avenue under sub-div-i of ded-201, new delhi dg. 2025-26. (sh: comprehensive maintenance of existing r.o. water purifier system.)
Read morePipe railing removal and refixing of existing work submersible bridge, under bridge construction sub division-no 1 bhopal
Pipe railing removal and refixing of existing work submersible bridge, under bridge construction sub division-no 1 bhopal
Read more(i) cont. of h.l. bridge with approach road over chas nala at 5th km of dhanbad-pathardih-sindri road (2 x 14.6m and (ii) cont. of h.l. bridge with approach road over chas nala at 7th km of dps road (1 x 14.6m) under plan head for the year 2025-26.
(i) cont. of h.l. bridge with approach road over chas nala at 5th km of dhanbad-pathardih-sindri road (2 x 14.6m and (ii) cont. of h.l. bridge with approach road over chas nala at 7th km of dps road (1 x 14.6m) under plan head for the year 2025-26.
Read moreConstruction of h.l. steel bridge single span 42m c/c of bearing over narwana branch canal at rd 11862 x-ing chanarthal kalan to gt road sadhugarh via attapur including its approaches, dismantling and 1.5m span slab culvert under pmgsy-iii (batch-1)
Construction of h.l. steel bridge single span 42m c/c of bearing over narwana branch canal at rd 11862 x-ing chanarthal kalan to gt road sadhugarh via attapur including its approaches, dismantling and 1.5m span slab culvert under pmgsy-iii (batch-1)
Read moreConstruction of type-v (g plus 1 foundation) for sdm, bishalgarh sub division, sepahijala district under rd bishramganj division ,sepahijala tripura /sh-providing permanent internal electrification work thereof. (as per sor-(i/e) pwd -2021 ). (g
Construction of type-v (g plus 1 foundation) for sdm, bishalgarh sub division, sepahijala district under rd bishramganj division ,sepahijala tripura /sh-providing permanent internal electrification work thereof. (as per sor-(i/e) pwd -2021 ). (g
Read moreFdr/mtc. of road from i) a-u road to mokraibari road(l-1.00) and ii)debbari bazar to chabimura via kamaria khola(l-3.932) (total length-4.932 km), under the jurisdiction of sub-division no.-i during the year 2025-26./sh-grouting, patch wbm-ii and wb
Fdr/mtc. of road from i) a-u road to mokraibari road(l-1.00) and ii)debbari bazar to chabimura via kamaria khola(l-3.932) (total length-4.932 km), under the jurisdiction of sub-division no.-i during the year 2025-26./sh-grouting, patch wbm-ii and wb
Read moreRmo of ei and fans installed at new block 1 and 2 saket district court complex, new delhi during the year 2025-2026. (sh annual comprehensive maintenance of fuji electric make ups system)
Rmo of ei and fans installed at new block 1 and 2 saket district court complex, new delhi during the year 2025-2026. (sh annual comprehensive maintenance of fuji electric make ups system)
Read moreof your Industry type