Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Dhundiyakhedi To Akavliya Raghuveer Pawar Ke Khet Se Mohan Patel Ke Khet Tak Length 3.50 Km With Pole Shifting And Electrification Work Under Kisan Sadak Nidhi
|
Description |
Construction Of Dhundiyakhedi To Akavliya Raghuveer Pawar Ke Khet Se Mohan Patel Ke Khet Tak Length 3.50 Km With Pole Shifting And Electrification Work Under Kisan Sadak Nidhi
|
Organisation | Government of Madhya Pradesh |
Tender Id | 2023_PWDRB_291553_1 |
Reference Number |
22/SAC/2023-24/DEWAS/DATE 13.07.2023 |
Tender Fee | 15000 |
EMD | 2.87 Lakh |
Tender Value | |
Place | CHIEF ENGINEER, PWD UJJAIN ZONE UJJAIN |
Link | https://mptenders.gov.in |
Start Date | July 18, 2023 22:30 |
End Date |
28/07/2023 ( Expired 662 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn
Construction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreRoutine maintenance and incident management work of from sitarganj km 0 000 to tanakpur km 52 200 under nhdp iv on epc mode of two lane with paved shoulders of section of old nh 125 new nh 09 in the state of uttarakhand
Routine maintenance and incident management work of from sitarganj km 0 000 to tanakpur km 52 200 under nhdp iv on epc mode of two lane with paved shoulders of section of old nh 125 new nh 09 in the state of uttarakhand
Read moreIe for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham
Ie for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham
Read more(molik nidhi) construction of cc road and drain work from lovely sweets se sikke ke maidan tak at zone 02 ward 09.file no.188/25x3/6.
(molik nidhi) construction of cc road and drain work from lovely sweets se sikke ke maidan tak at zone 02 ward 09.file no.188/25x3/6.
Read moreConstruction of 4 lane with paved shoulder from ap/kn border (des. ch.0.000) to deosugur (des ch.54.566) of ap-kn border raichur-kn-ts border of nh-167 in the state of karnataka on ham under nh(o) (project length-54.566 km)
Construction of 4 lane with paved shoulder from ap/kn border (des. ch.0.000) to deosugur (des ch.54.566) of ap-kn border raichur-kn-ts border of nh-167 in the state of karnataka on ham under nh(o) (project length-54.566 km)
Read moreBalance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Read moreProviding pole shifting in construction of basoda ring road (by pass) from new mandi bereth road to mewli via syawada ganj, rajoda , chourawara pachama mahagour rc length 23.80 km. (phase -2) ganjbasoda dist vidisha
Providing pole shifting in construction of basoda ring road (by pass) from new mandi bereth road to mewli via syawada ganj, rajoda , chourawara pachama mahagour rc length 23.80 km. (phase -2) ganjbasoda dist vidisha
Read moreConstruction of main nala in main road (both sides) (01)neharu tiraha se suresh gupta ke dukan tak.(02)hanuman mandir se ramsumiran gupta house.(03)ramsumiran gupta house to jayprakash verma house drain work.
Construction of main nala in main road (both sides) (01) neharu tiraha se suresh gupta ke dukan tak.(02) hanuman mandir se ramsumiran gupta house.(03) ramsumiran gupta house to jayprakash verma house drain work.&#x0d
Read moreof your Industry type