Tender Details
Particulars | Details |
---|---|
Title |
Boundary Wall Painting And Replacement Of Existing Concertina Coil Fencing In Pshpl Under Erpl, Haldia
|
Description |
Boundary Wall Painting And Replacement Of Existing Concertina Coil Fencing In Pshpl Under Erpl, Haldia
|
Organisation | IndianOil | Central Govt. Ministry/Department |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 8020 |
Tender Value | |
Place | REFER TENDER DOCUMENT |
Link |
AAAAAAAAAA Login to view |
Start Date | May 22, 2025 20:30 |
End Date |
29/05/2025 ( 12 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Selection of green hydrogen producers for setting up green hydrogen production facilities anchor unit and experimental anchor units in the state under maharashtra green hydrogen policy 2023
Selection of green hydrogen producers for setting up green hydrogen production facilities anchor unit and experimental anchor units in the state under maharashtra green hydrogen policy 2023
Read moreImprovement strengthening of existing carriageway including widening of 2 lane section to 4 lane between km. 0.00 to km.12.30 in tumakuru town limit and 4 laning from design km 53.80 to design km 56.05 of nh 206 in kibbanahalli village tumakuru distr
Improvement strengthening of existing carriageway including widening of 2 lane section to 4 lane between km. 0.00 to km.12.30 in tumakuru town limit and 4 laning from design km 53.80 to design km 56.05 of nh 206 in kibbanahalli village tumakuru distr
Read moreWork of augmentation of existing 18 no. 33 kv sub-stations along with augmentation of associated 33 kv lines and civil works on turnkey basis within the jurisdiction of uhbvn under rdss.
Work of augmentation of existing 18 no. 33 kv sub-stations along with augmentation of associated 33 kv lines and civil works on turnkey basis within the jurisdiction of uhbvn under rdss.
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Read moreAAAAAAAAAA
Login to viewSupply and installation of submersible pump motor sets at flood affected river bed tubewell with supply of necessary substitutes at different water supply scheme under arsha block under pmd, phe dte. in the district of purulia.
Read moreSurface cleaning and painting work of tower structures of total 02 no 132kv ehv lines (total 617 nos. towers and weight of towers 2105.97mt) under eht-maint. dn satna on labour contract basis at the risk and cost of m/s. shri vardhman trade, jabalpu
Surface cleaning and painting work of tower structures of total 02 no 132kv ehv lines (total 617 nos. towers and weight of towers 2105.97mt) under eht-maint. dn satna on labour contract basis at the risk and cost of m/s. shri vardhman trade, jabalpu
Read moreConstruction improvement of rishi rongli kupup from km 53 design chainage km 55.44 to km 70 design chainage km 74.575 net design length 19.135 km from existing cl 9 to nhdl specifications through epc mode in sikkim under project swastik
Construction improvement of rishi rongli kupup from km 53 design chainage km 55.44 to km 70 design chainage km 74.575 net design length 19.135 km from existing cl 9 to nhdl specifications through epc mode in sikkim under project swastik
Read moreDesign and const of 590 mtr snow gallery, const of 483 mtr snow avalanche catch dam, 100 m loose rock scaling on d-s road approach road to south portal of proposed shinkun la tunnel under 126 rcc 13 tf of project yojak in the state of hp through epc
Design and const of 590 mtr snow gallery, const of 483 mtr snow avalanche catch dam, 100 m loose rock scaling on d-s road approach road to south portal of proposed shinkun la tunnel under 126 rcc 13 tf of project yojak in the state of hp through epc
Read moreof your Industry type