Tender Details
Particulars | Details |
---|---|
Title |
Raising Height Of Barvi Dam Rehabilitation Work Repairing And Providing Final Asphalting Treatment To Road Of Manivali I And Ii Gaothan.
|
Description |
Raising Height Of Barvi Dam Rehabilitation Work Repairing And Providing Final Asphalting Treatment To Road Of Manivali I And Ii Gaothan.
|
Organisation | Maharashtra Industrial Development Corporation | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 19380 |
EMD | 1.5 Lakh |
Tender Value | |
Place | Manivali-I and II |
Link |
AAAAAAAAAA Login to view |
Start Date | May 14, 2025 23:30 |
End Date |
20/05/2025 ( 8 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Providing road safety measures at morth/police identified locations based on accident data of 2017-19,2018-20 and 2019-21 from km.34.144 (kothur) to km.80.306 (jadcherla) of hyderabad bangalore section of nh-44 in the state of telangana
Providing road safety measures at morth/police identified locations based on accident data of 2017-19,2018-20 and 2019-21 from km.34.144 (kothur) to km.80.306 (jadcherla) of hyderabad bangalore section of nh-44 in the state of telangana
Read moreRoutine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate
Routine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate
Read moreIt addl. pune infotech park i industrial
Construction of 6 lane road using cement&#x0d concrete treatment with footpath and storm water pipeline&#x0d repairing and providing new curbing at center verge and&#x0d road furnitures from shivaji chowk to smashan bhumi&#x0d
Read moreDesign and const of 590 mtr snow gallery, const of 483 mtr snow avalanche catch dam, 100 m loose rock scaling on d-s road approach road to south portal of proposed shinkun la tunnel under 126 rcc 13 tf of project yojak in the state of hp through epc
Design and const of 590 mtr snow gallery, const of 483 mtr snow avalanche catch dam, 100 m loose rock scaling on d-s road approach road to south portal of proposed shinkun la tunnel under 126 rcc 13 tf of project yojak in the state of hp through epc
Read moreConsultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode
Read moreRehabilitation and up.gradation of guhagar chiplun helwak road from existing km 26.890 to 403.610, design km 26.230 to 403.000 nh 166 e length 13.77 km two lanes with paved shoulders configuration in the state of maharashtra on engineering, procureme
Rehabilitation and up.gradation of guhagar chiplun helwak road from existing km 26.890 to 403.610, design km 26.230 to 403.000 nh 166 e length 13.77 km two lanes with paved shoulders configuration in the state of maharashtra on engineering, procureme
Read moreRehabilitation and improvement of main spillway baigul dam (mechanical works) under drip-ii in udham singh nagar
Rehabilitation and improvement of main spillway baigul dam (mechanical works) under drip-ii in udham singh nagar
Read moreContractor risk and cost basis rehabilitation and up gradation to two lanes with paved shoulder four lane configurations for the work of nh 561 a pandharpur mangalwedha marwade umdai from ch. 40.800 to ch.95.136 package no.ii length 54.336 in the sta
Contractor risk and cost basis rehabilitation and up gradation to two lanes with paved shoulder four lane configurations for the work of nh 561 a pandharpur mangalwedha marwade umdai from ch. 40.800 to ch.95.136 package no.ii length 54.336 in the sta
Read morePackage-i civil and hydro-mechanical works of di tunnels pertaining to tato-ii hydro electric project (700 mw), arunachal pradesh
Package-i civil and hydro-mechanical works of di tunnels pertaining to tato-ii hydro electric project (700 mw), arunachal pradesh
Read more2x600 mw shree singaji tpp, khandwa- work of annual cleaning of drains, roads and other area in plant, sstpp (stage-i and stage-ii), khandwa.
2x600 mw shree singaji tpp, khandwa- work of annual cleaning of drains, roads and other area in plant, sstpp (stage-i and stage-ii), khandwa.
Read moreof your Industry type