Tender Details
Particulars | Details |
---|---|
Title |
Restoration Of Irrigation System For Effective Water Regulation Including Monitoring And Management To Pipe Culvert On No.1 Vatticherukuru Major At Km. .716 And Bank Raising Of No.1 Vatticherukuru Major At Km 1.50 To 3.50 And Kovelamudi Major At Km 3.50 To 4.50 Of Guntur Channel
|
Description |
Restoration Of Irrigation System For Effective Water Regulation Including Monitoring And Management To Pipe Culvert On No.1 Vatticherukuru Major At Km. .716 And Bank Raising Of No.1 Vatticherukuru Major At Km 1.50 To 3.50 And Kovelamudi Major At Km 3.50 To 4.50 Of Guntur Channel
|
Organisation | Information Technology, Electronics and Communications Andhra Pradesh | State Govt. and UT |
Tender Id | 776741 |
Reference Number |
TN No.27/2024-25 |
Tender Fee | 105 |
EMD | 2955 |
Tender Value | |
Place | AP |
Link | https://tender.apeprocurement.gov.in |
Start Date | December 28, 2024 16:30 |
End Date |
16/01/2025 ( Expired 121 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supply and stacking of various materials for special restoration of monsoon damages (2024-25) at various locations between km 31.450 to km 33.906 and km 91.300 to km 130.008 on sairang-tuipuibari road for permanent work and between km 124.086 to km 1
Supply and stacking of various materials for special restoration of monsoon damages (2024-25) at various locations between km 31.450 to km 33.906 and km 91.300 to km 130.008 on sairang-tuipuibari road for permanent work and between km 124.086 to km 1
Read moreRehabilitation of bodhal bridge (at km 95.380) and chambal major bridge (at km 112.00) with widening of approaches from km 111/00 to km 111/864 on nh-552 ext. in the state of rajasthan (job no. nh-552 extn./rj/2024-25/856)
Rehabilitation of bodhal bridge (at km 95.380) and chambal major bridge (at km 112.00) with widening of approaches from km 111/00 to km 111/864 on nh-552 ext. in the state of rajasthan (job no. nh-552 extn./rj/2024-25/856)
Read moreCreation of avenue plantation and three years maintenance over 5 km in total (total seedlings 2000 nos.) at jora bridge to rajapur d block, adjacent area-1.5 km, nayabad bank plot and house or judge-1 km, nandan kanan-1 km and netaji nagar, purbalok-
Creation of avenue plantation and three years maintenance over 5 km in total (total seedlings 2000 nos.) at jora bridge to rajapur d block, adjacent area-1.5 km, nayabad bank plot and house or judge-1 km, nandan kanan-1 km and netaji nagar, purbalok-
Read moreConstruction and m.t of rama mandir to bane di hatti via andora upperla, jattan-da- beehra from km. 0-0 to 3-225 including 1 no. bridge over amb khad at rd 0-450 on pucca paroh andora road in district una h.p under nabard ridf-xxx
Construction and m.t of rama mandir to bane di hatti via andora upperla, jattan-da- beehra from km. 0-0 to 3-225 including 1 no. bridge over amb khad at rd 0-450 on pucca paroh andora road in district una h.p under nabard ridf-xxx
Read moreRequest for proposal for-apcrda-social development-outsourcing of sanitation services including solid waste management in 19 grama panchayats (four clusters) covered in crda region (excluding 6 villages merged in mangalagiri -tadepalli municipal corporation) and manual/ mechanized sweeping with 1 no of jatayu vehicle for a road length of 10 km (vvip roads) from 5/2025 to 4/2028 (36 months) on buy/hire, own and operate (boo) basis
Request for proposal for-apcrda-social development-outsourcing of sanitation services including solid waste management in 19 grama panchayats (four clusters) covered in crda region (excluding 6 villages merged in mangalagiri -tadepalli municipal corporation) and manual/ mechanized sweeping with 1 no of jatayu vehicle for a road length of 10 km (vvip roads) from 5/2025 to 4/2028 (36 months) on buy/hire, own and operate (boo) basis
Read moreSdmf
Restoration of irrigation system for effective water regulation including monitoring and management to existing pipe inlet at km 29.875 on right bank of gonteru major drain in nadapana vari village.
Read moreUpgradation of rural road from nh connection (near webi junction) to nh connection (near bamboo nalah pahalgaon-1) at mayabunder, north and middle andaman under pmgsy-iii, batch-i,2024-25 package no. an03mb308 (length 3.100 km).
Upgradation of rural road from nh connection (near webi junction) to nh connection (near bamboo nalah pahalgaon-1) at mayabunder, north and middle andaman under pmgsy-iii, batch-i,2024-25 package no. an03mb308 (length 3.100 km).
Read moreSdmf
Restoration of irrigation system for effective water regulation including monitoring and management to escape shutters on common bank of eluru ryves canals at gunadala in vijayawada corporation limits.
Read moreSdmf
Restoration of irrigation system for effective water regulation including monitoring and management to muthyalampadu escape on common bank of eluru canal budameru at gunadala in vijayawada city limits.
Read moreReplacement of 6 nos. existing narrow-poor minor bridge-culvert by suitable waterways structure with provision of temp. di etc. and raising of embankment ... in between km 610.00 to km 626.00 of nh-31 i the dist. of jalpaiguri, job no.566.
Replacement of 6 nos. existing narrow-poor minor bridge-culvert by suitable waterways structure with provision of temp. di etc. and raising of embankment ... in between km 610.00 to km 626.00 of nh-31 i the dist. of jalpaiguri, job no.566.
Read moreof your Industry type