| Title |
Selection Of Executing Agencies For Execution Of 5 M Wp Grid Connected Solar Power Plant Along With 5 Five Years Comprehensive Operation And Maintenance At Sumsuih Mizoram As Per Specification Given In Scope Of Work Of Bid Document.
|
| Description |
As Per Eoi
|
| Organisation | ITI Limited | Central Govt. Ministry/Department |
| Tender Id | 2025_ITI_796751_1 |
|
Reference Number |
ITI/NNI/BD/SPP/Mizoram/01 |
| Tender Fee | 0 |
| EMD | 25 Lakh |
| Tender Value | |
| Place | ITI Ltd.Naini Unit Mirzapur Road Allahabad |
| Link |
View Original Tender Notice
https://eprocure.gov.in/epublish/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1101332 |
| Start Date | May 02, 2025 14:30 |
| End Date |
Expired
13/05/2025
Expired 390 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Survey, design, fabrication, supply, installation, testing and commissioning of total 27.32 kwp of on grid connected rooftop solar pv power plant including comprehensive maintenance contract (cmc) for 3 years
Survey, design, fabrication, supply, installation, testing and commissioning of total 27.32 kwp of on grid connected rooftop solar pv power plant including comprehensive maintenance contract (cmc) for 3 years
Read moreSurvey design fabrication supply installation testing and commissioning of total 12.60 kw of on grid connected rooftop solar pv power plant including comprehensive maintenance contract cmc for 05 years
Survey design fabrication supply installation testing and commissioning of total 12.60 kw of on grid connected rooftop solar pv power plant including comprehensive maintenance contract cmc for 05 years at krushibeej farmer producer company ltt
Read moreRfp for selection of agency for setting up 2.0 mw ac with 20 prasetnt extra dc system i.e 2.4 mw dc on-grid ground mounted solar photovoltaic power plant with 10-years of operation comprehensive maintenance and development of alleged infrastructure w
Rfp for selection of agency for setting up 2.0 mw ac with 20 prasetnt extra dc system i.e 2.4 mw dc on-grid ground mounted solar photovoltaic power plant with 10-years of operation comprehensive maintenance and development of alleged infrastructure w
Read moreSolar power plant 200 kw
Design, fabrication, supply, installation, testing, commissioning, operation andmaintenance for 5 years total 200kw distributed capacity grid connected solar pv power plant over elevated solar structural steel shed with ht net metering along with dc.
Read moreComprehensive maintenance contract of 37.5 kwp rooftop grid connected solar power plant for five years at sirsa complex, kolkata.
Comprehensive maintenance contract of 37.5 kwp rooftop grid connected solar power plant for five years at sirsa complex, kolkata.
Read moreSelection of executing agencies for empanelment rate contract for design supply erection testing commissioning including warranty comprehensive operation and maintenance five years of grid- connected rooftop solar power plants of various capa
As per eoi
Read moreSelection of agency for design, engineering, supply, installation, testing, commissioning of 77.1 kw grid connected rooftop solar photovoltaic power plant along with 5-years of operation and maintenance at suramy park, katayeghat on capex model
Selection of agency for design, engineering, supply, installation, testing, commissioning of 77.1 kw grid connected rooftop solar photovoltaic power plant along with 5-years of operation and maintenance at suramy park, katayeghat on capex model
Read moreInstallation of grid connected solar power plant under pm kusum component c in capex mode
Installation of grid connected solar power plant under pm kusum component c in capex mode
Read moreSelection of agency for design, engineering, supply, installation, testing, commissioning of 77.1 kw grid connected rooftop solar photovoltaic power plant along with 5-years of operation and maintenance at suramy park, katayeghat on capex model
Selection of agency for design, engineering, supply, installation, testing, commissioning of 77.1 kw grid connected rooftop solar photovoltaic power plant along with 5-years of operation and maintenance at suramy park, katayeghat on capex model as p
Read moreSelection of agency for design, engineering, supply, erection installation commissioning and testing of shed mounted 400kw grid connected solar photovoltaic power plant for compressed biogas (cbg) plant along with 05 years of operation and comprehens
Selection of agency for design, engineering, supply, erection installation commissioning and testing of shed mounted 400kw grid connected solar photovoltaic power plant for compressed biogas (cbg) plant along with 05 years of operation and comprehens
Read moreof your Industry type