Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Engaging Technical Consultant For Preparation Of Feasibility Study (Fs) And Detailed Project Report (Dpr) For Construction Of New Road Manul Menshithang To Nhsl Specifications Between Km 0.00 To Km 52.00 Through Green Field Alignment In The Aor Of 10
|
| Description |
Engaging Technical Consultant For Preparation Of Feasibility Study (Fs) And Detailed Project Report (Dpr) For Construction Of New Road Manul Menshithang To Nhsl Specifications Between Km 0.00 To Km 52.00 Through Green Field Alignment In The Aor Of 10
|
| Organisation | Dte General Border Roads Organisation | Central Govt. Ministry/Department |
| Tender Id | 2024_BRO_686511_1 |
|
Reference Number |
80594 |
| Tender Fee | 5000 |
| EMD | 0 |
| Tender Value | - |
| Place | sector of 107 RCC |
| Link |
View Original Tender Notice
https://defproc.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=768447 |
| Start Date | December 16, 2024 17:30 |
| End Date |
Expired
14/02/2025
Expired 606 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Selection engagement of public sector undertaking as executive agency for management of project construction of existing greenfield alignment for manul sanklang phase i sanklang ningla menshithang phase-ii including ning la tunnel to nhsl specif
Selection engagement of public sector undertaking as executive agency for management of project construction of existing greenfield alignment for manul sanklang phase i sanklang ningla menshithang phase-ii including ning la tunnel to nhsl specif
Read moreNit for consultancy firm for feasibility study for bess and dpr for battery bank system for ktps
Nit for consultancy firm for feasibility study for bess and dpr for battery bank system for ktps
Read moreConsultancy services for preparation of dpr / feasibility report for jaigad port chiplun satara (junction with nh-48) greenfield alignment in the state of maharashtra (98 km)
Consultancy services for preparation of dpr / feasibility report for jaigad port chiplun satara (junction with nh-48) greenfield alignment in the state of maharashtra (98 km)
Read moreConsultancy services for preparation of dpr-feasibility report development of port connectivity from dighi port-poladpur-surur (junction with nh-48) greenfield alignment (approx. length-140 km.)
Consultancy services for preparation of dpr-feasibility report development of port connectivity from dighi port-poladpur-surur (junction with nh-48) greenfield alignment (approx. length-140 km.)
Read moreRfp for engagement of consultancy firm for conducting pre-feasibility study and preparation of detailed project report (dpr) of pumped storage projects (psps) in madhya pradesh
Rfp for engagement of consultancy firm for conducting pre-feasibility study and preparation of detailed project report (dpr) of pumped storage projects (psps) in madhya pradesh
Read moreConstruction of kugging tinali road from km 0.00 to km 36.96 net length 36.96 kms greenfield alignment to nhsl specifications under 1448 bcc 761 brtf in aor of project brahmank in arunachal pradesh on epc mode
Construction of kugging tinali road from km 0.00 to km 36.96 net length 36.96 kms greenfield alignment to nhsl specifications under 1448 bcc 761 brtf in aor of project brahmank in arunachal pradesh on epc mode
Read moreCs for survey investigation prep of dpr and providing preconstruction activities for constr of rd bishing to ssp greenfield alignment bet km 0.00 to km 17.50 indicative length 17.50 km to nhsl specification under 1448 bcc 761 tf project bmk
Cs for survey investigation prep of dpr and providing preconstruction activities for constr of rd bishing to ssp greenfield alignment bet km 0.00 to km 17.50 indicative length 17.50 km to nhsl specification under 1448 bcc 761 tf project bmk
Read moreConsultancy services for feasibility study and preparation of detailed project report (dpr) of widening to 4l road of barpalli- balangir -kesinga bhawanipatna -junagarh on nh 26 from 21/000 to 202/000 km excluding bhawanipatna bypass for odisha
Consultancy services for feasibility study and preparation of detailed project report (dpr) of widening to 4l road of barpalli- balangir -kesinga bhawanipatna -junagarh on nh 26 from 21/000 to 202/000 km excluding bhawanipatna bypass for odisha
Read moreConsultancy services for feasibility study and preparation of detailed project report (dpr) for 4 lane road from 0.000 km to 239.900 km (balangir to nayagarh) of nh-57 in the state of odisha for the year 2026-27
Consultancy services for feasibility study and preparation of detailed project report (dpr) for 4 lane road from 0.000 km to 239.900 km (balangir to nayagarh) of nh-57 in the state of odisha for the year 2026-27
Read moreConsultancy services for feasibility study and preparation of (dpr) for widening/upgradation to 2l/4l ps from barabanki to lakhimpur of nh727h (except from dewa to fatehpur (km 19.000 to km 39.000) in the state of uttar pradesh.
Consultancy services for feasibility study and preparation of (dpr) for widening/upgradation to 2l/4l ps from barabanki to lakhimpur of nh727h (except from dewa to fatehpur (km 19.000 to km 39.000) in the state of uttar pradesh.
Read moreof your Industry type