Estimate For The Di Of Thirot Nallah Into Conveyance Channel Of Thirot Hep From Trench By Removal Of Silt Aggregate ,Pebbles Boulder From It And Construction Of Bypass Arrangement By Excavation/Removal Of Silt ,Aggregate ,Boulder ,Pebbles A
Description
Estimate For The Di Of Thirot Nallah Into Conveyance Channel Of Thirot Hep From Trench By Removal Of Silt Aggregate ,Pebbles Boulder From It And Construction Of Bypass Arrangement By Excavation/Removal Of Silt ,Aggregate ,Boulder ,Pebbles A
Organisation HPSEBL | State Govt. and UT
Tender Id 2024_HPSEB_93900_1
Reference
Number
HPSEBL/TCD/DB-16/2024-25
Tender Fee 590
EMD 3300
Tender Value
Place Thirot HEP
Link https://hptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=138265
Start Date October 04, 2024 23:00
End Date

10/10/2024 ( Expired 194 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
On turnkey basis under bina complex irrigation and multipurpose project construction of dehra dam on dehra nallah, semraghat di weir on dhasan river, 4 mw dehra power house and feeder channel for di from dhasan river to dehra dam

On turnkey basis under bina complex irrigation and multipurpose project construction of dehra dam on dehra nallah, semraghat di weir on dhasan river, 4 mw dehra power house and feeder channel for di from dhasan river to dehra dam

Read more
Removal of impediments to the flow in flood spill channel by way of clearance of silt load at nallah confluence points including removal of humps from rd 0 to rd 42 kms on consideration cost basis

Removal of impediments to the flow in flood spill channel by way of clearance of silt load at nallah confluence points including removal of humps from rd 0 to rd 42 kms on consideration cost basis

Read more
Removal of silt from the forebay headrace channel and plugging by way of plugging of side walls and laying off pcc rcc at required spots of bhaderwah hep restoration strengthening of power canal bhaderwah hep phase i

Removal of silt from the forebay headrace channel and plugging by way of plugging of side walls and laying off pcc rcc at required spots of bhaderwah hep restoration strengthening of power canal bhaderwah hep phase i

Read more
Di of thirot nallah into conveyance channel of thirot hep from trench by removal of silt aggregate ,pebbles boulder from it and construction of bypass arrangement by excavation/removal of silt ,aggregate ,boulder ,pebbles and breaking of sto

Di of thirot nallah into conveyance channel of thirot hep from trench by removal of silt aggregate ,pebbles boulder from it and construction of bypass arrangement by excavation/removal of silt ,aggregate ,boulder ,pebbles and breaking of sto

Read more
Estimate for the di of thirot nallah into conveyance channel of thirot hep from trench by removal of silt aggregate ,pebbles boulder from it and construction of bypass arrangement by excavation/removal of silt ,aggregate ,boulder ,pebbles a

Estimate for the di of thirot nallah into conveyance channel of thirot hep from trench by removal of silt aggregate ,pebbles boulder from it and construction of bypass arrangement by excavation/removal of silt ,aggregate ,boulder ,pebbles a

Read more
Silt clearance, jungle clearance and removal of blown sand from ntm rd 50- tail for the year 2024-25.

Silt clearance, jungle clearance and removal of blown sand from ntm rd 50- tail for the year 2024-25.

Read more
Bid for balance work of construction of bypass for providing inter connectivity amongst national highways (nhs) around the pratapgarh city (pratapgarh bypass) on epc mode from km 0.00 to km 2.90 (near junction with nh-931)in the state of up

Bid for balance work of construction of bypass for providing inter connectivity amongst national highways (nhs) around the pratapgarh city (pratapgarh bypass) on epc mode from km 0.00 to km 2.90 (near junction with nh-931)in the state of up

Read more
Consultancy services for authority engineer for supervision of the work of construction of 4-lane with paved shoulder of sri muktsar sahib bypass from existing km 269.960 of nh-354 to existing km 39.280 of nh - 754 in the state of punjab

Consultancy services for authority engineer for supervision of the work of construction of 4-lane with paved shoulder of sri muktsar sahib bypass from existing km 269.960 of nh-354 to existing km 39.280 of nh - 754 in the state of punjab

Read more
Construction of cc drain ward no. 16 from banganga bypass road to viresh shrivastava house shahdol as per nit and estimate.

Construction of cc drain ward no. 16 from banganga bypass road to viresh shrivastava house shahdol as per nit and estimate.

Read more
Package-6, modification of di tunnel into tunnel spillway arrangement - civil and hm works (tunnel spillway, adit to goc, goc gate shaft, inlet bellmouth, outlet concrete dyke and energy dissipation arrangement) for teesta-v power station.

Package-6, modification of di tunnel into tunnel spillway arrangement - civil and hm works (tunnel spillway, adit to goc, goc gate shaft, inlet bellmouth, outlet concrete dyke and energy dissipation arrangement) for teesta-v power station.

Read more