Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Annual Rate Contract For Supply Of Labour Jen Section Ramgarh
|
Description |
Annual Rate Contract For Supply Of Labour Jen Section Ramgarh
|
Organisation | PHED - C.E. (Project),Jodhpur | State Govt. and UT |
Tender Id | 2024_PHCJO_434564_1 |
Reference Number |
NIB NO10(5)/2024-25 |
Tender Fee | 1000 |
EMD | 15000 |
Tender Value | |
Place | Jaisalmer |
Link | https://eproc.rajasthan.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=781200 |
Start Date | December 03, 2024 23:30 |
End Date |
16/12/2024 ( Expired 197 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supply of hydraulic insulator testing jig for tensile load testing of 25kv porcelain and composite insulator as per rdso spec. no. ti/spc/ohe/instest/0090/(02/2009) rev o or latest.
For complete deion and other details, please refer to tender
Read moreDesign, supply, installation and commissioning of open standard digital trunking radio system for chandigarh police
Design, supply, installation and commissioning of open standard digital trunking radio system for chandigarh police
Read moreConstruction of 6-lane light vehicular underpass (lvup) (1x12x4m) at km.19.737 (annojiguda jn.) along with service roads under morth identified blackspot (ts-05-127) for the period 2019-21 on hyderabad-yadgiri section of nh-163 in the state of telang
Construction of 6-lane light vehicular underpass (lvup) (1x12x4m) at km.19.737 (annojiguda jn.) along with service roads under morth identified blackspot (ts-05-127) for the period 2019-21 on hyderabad-yadgiri section of nh-163 in the state of telang
Read moreSupply installation commissioning maintenance of sensors data acquisition data transmission analysis management reporting for the same for bhms for new cable stayed zuari bridge, old zuari bridge on nh-66 and borim bridge on nh-566 in state of goa
Supply installation commissioning maintenance of sensors data acquisition data transmission analysis management reporting for the same for bhms for new cable stayed zuari bridge, old zuari bridge on nh-66 and borim bridge on nh-566 in state of goa
Read moreSelection of bus operator for procurement, supply, operation and maintenance of 10,900 electric buses and development of allied electric and civil infrastructure on gross cost contracting (gcc) under pm e-drive scheme
Selection of bus operator for procurement, supply, operation and maintenance of 10,900 electric buses and development of allied electric and civil infrastructure on gross cost contracting (gcc) under pm e-drive scheme.
Read moreConsultancy services for authoritys engineer for supervision of construction of 4 lane with ps idar-badoli bypass section from design chainage km 81.300 to 95.500 of nh-168g in the state of gujarat ,total length 14.2 km, on epc mode
Consultancy services for authoritys engineer for supervision of construction of 4 lane with ps idar-badoli bypass section from design chainage km 81.300 to 95.500 of nh-168g in the state of gujarat ,total length 14.2 km, on epc mode
Read moreDesign, engineering, manufacture, supply and delivery of new ip rotor (with full blading) for turbine model,c 210-130 (for 210 mw unit of kolaghat tps) through capex 2025-26
Design, engineering, manufacture, supply and delivery of new ip rotor (with full blading) for turbine model,c 210-130 (for 210 mw unit of kolaghat tps) through capex 2025-26
Read moreConsultancy services for preparation of dpr for widening to 4 lane divided carriageway of chhapra gopalganj section of nh-85 in the state of bihar
Consultancy services for preparation of dpr for widening to 4 lane divided carriageway of chhapra gopalganj section of nh-85 in the state of bihar
Read moreSupply, installation, testing, commissioning and training of electrical, plumbing and fire protection works for 19 underground stations from madhavaram milk colony station to royapettah govt hospital
Station including bored tunnel between stations (ch 76.000 to ch 17250.000) for corridor 3 of chennai metro rail project phase ii.
Read moreCarrying out tests on completion and during mntnance pd using nsv, fwd, mbiu, retro-reflectometer etc for a-p rd section of nh-144a ex ch from km 85.385 to km 102.000 (design chainage km 74.350 to km 90.150) (pkg-iv) d in jk (ut) under 35 tf/(
Carrying out tests on completion and during mntnance pd using nsv, fwd, mbiu, retro-reflectometer etc for a-p rd section of nh-144a ex ch from km 85.385 to km 102.000 (design chainage km 74.350 to km 90.150) (pkg-iv) d in jk (ut) under 35 tf/(
Read moreof your Industry type