Tender Details

Particulars Details
Title
Rehabilitation/Overhauling Of Lhb Coaches To Reduce The Cycle Downtime During Major Attention.
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 78669800
Reference
Number
CRW-HRT-M-LHB-RSP-REHAB1
Tender Fee 0
EMD 5.3 Lakh
Tender Value -
Place Hazipur
Link
View Original Tender Notice

https://www.ireps.gov.in/ireps/works/pdfdocs/122024/78669800/viewNitPdf_4785987.pdf

Start Date November 27, 2024 17:57
End Date
Expired 18/12/2024

Expired 669 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Rehabilitation/overhauling of coaches to reduce cycle downtime during major attention for 106 coaches, against sanction bulk rsp work vide pb no-752/2024-25 & 365/2025-26 at carriage complex, kanchrapara within a period of 01 (one) year

Rehabilitation/overhauling of coaches to reduce cycle downtime during major attention for 106 coaches, against sanction bulk rsp work vide pb no-752/2024-25 & 365/2025-26 at carriage complex, kanchrapara within a period of 01 (one) year

Read more
Corrosion (cross members) attention and air brake system attention in lhb coaches at the premises of central workshops, golden rock, southern railway, tiruchirappalli - 620004.

Corrosion (cross members) attention and air brake system attention in lhb coaches at the premises of central workshops, golden rock, southern railway, tiruchirappalli - 620004.

Read more
Mid life rehabilitation (mlr) of 150 lhb coaches as per scope of work.

Mid life rehabilitation (mlr) of 150 lhb coaches as per scope of work.

Read more
Corrosion and air brake activities for mid-life rehabilitation (mlr) of 50 lhb coaches at carriage repair shop, tirupati

Corrosion and air brake activities for mid-life rehabilitation (mlr) of 50 lhb coaches at carriage repair shop, tirupati

Read more
Electrical modification work in lhb non ac & lhb ac coaches during poh schedule at crws bhopal at crws/bpl for period of two years.

Electrical modification work in lhb non ac & lhb ac coaches during poh schedule at crws bhopal at crws/bpl for period of two years.

Read more
Outsourcing the overhauling of trident make air dryers in wag9h locomotives during major schedules (toh/ioh)

Outsourcing the overhauling of trident make air dryers in wag9h locomotives during major schedules (toh/ioh)

Read more
Stripping, supply, installation, testing & commissioning of complete cable harness in lhb ac coaches during mlr at rcnk/snp

Stripping, supply, installation, testing & commissioning of complete cable harness in lhb ac coaches during mlr at rcnk/snp

Read more
Maintenance of pressurized flushing system/electro-pneumatic pressurized flushing system (eppfs) fitted in lhb coaches during ss2/ss3 repairs

Maintenance of pressurized flushing system/electro-pneumatic pressurized flushing system (eppfs) fitted in lhb coaches during ss2/ss3 repairs

Read more
Rehabilitation & overhauling of lru/ valves installed in knorr-bremse make improved ccb air brake system of three phase locomotives during ioh schedule.

Rehabilitation & overhauling of lru/ valves installed in knorr-bremse make improved ccb air brake system of three phase locomotives during ioh schedule.

Read more
Stripping, scraping, cleaning, washing and painting of lhb bogies and their components during ss-i, including fitment of air springs on lhb bogies and pre-stripping of lhb bogies before lifting of coaches as per scope of work at lower parel workshop.

Stripping, scraping, cleaning, washing and painting of lhb bogies and their components during ss-i, including fitment of air springs on lhb bogies and pre-stripping of lhb bogies before lifting of coaches as per scope of work at lower parel workshop.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise