Tender Details
Particulars | Details |
---|---|
Title |
Zone 3 Tajganj Room No. 59, 100 Foota Road, Cng Petrol Pump, Both Sides To Sp Office Road, Rcc Drain Repair Work
|
Description |
Zone 3 Tajganj Room No. 59, 100 Foota Road, Cng Petrol Pump, Both Sides To Sp Office Road, Rcc Drain Repair Work
|
Organisation | Directorate of Local Bos UP | State Govt. and UT |
Tender Id | 2024_DOLBU_959199_1 |
Reference Number |
20-09-2024/NAGAR NIGAM AGRA/30-09-2024/80 |
Tender Fee | 4000 |
EMD | 4.12 Lakh |
Tender Value | |
Place | AGRA |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1667509 |
Start Date | September 27, 2024 19:30 |
End Date |
03/10/2024 ( Expired 201 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction work of cement concrete road and rcc drain from the house of shri ashok patidar to the house of shri sanjay shukla in vighneshwar nagar in ward no. 28.
Construction work of cement concrete road and rcc drain from the house of shri ashok patidar to the house of shri sanjay shukla in vighneshwar nagar in ward no. 28.
Read moreSewer, drain and road repair work in ward no. 99 of adarsh nagar zone
Sewer, drain and road repair work in ward no. 99 of adarsh nagar zone
Read moreSewer, drain and road repair work in ward no. 100 of adarsh nagar zone
Sewer, drain and road repair work in ward no. 100 of adarsh nagar zone
Read moreConstruction work of c.c. road from shyam nagar-iii h.g., balaji temple to 100 feet road in ward no. 91 of sanganer zone
Construction work of c.c. road from shyam nagar-iii h.g., balaji temple to 100 feet road in ward no. 91 of sanganer zone
Read moreConstruction of c.c road and rcc u shape drain under c m urban infrastructure development scheme phase iv state government fund at ward no. 13 alladin house to nagar parishad office and ballu kaurav towards nariya.
Construction of c.c road and rcc u shape drain under c m urban infrastructure development scheme phase iv state government fund at ward no. 13 alladin house to nagar parishad office and ballu kaurav towards nariya.
Read moreConstruction work of covered rcc drain and cc road from the house of umashankar pal to the house of savitri via the house of manikchand aupadhyay and vinay in ward no. 07
Construction work of covered rcc drain and cc road from the house of umashankar pal to the house of savitri via the house of manikchand aupadhyay and vinay in ward no. 07
Read moreWard no. 125 sector-8 bt road work on both sides of mahavir park, from panchsheel to shamshan
Ward no. 125 sector-8 bt road work on both sides of mahavir park, from panchsheel to shamshan
Read moreInterlocking tile work on both sides of carriageway for road safety (black spot id no. up-(04)-49) from ch. 66.000 to ch. 69.000 (urban stretch of attara) of nh-35 (old nh-76) in the state of uttar pradesh.
Interlocking tile work on both sides of carriageway for road safety (black spot id no. up-(04)-49) from ch. 66.000 to ch. 69.000 (urban stretch of attara) of nh-35 (old nh-76) in the state of uttar pradesh.
Read moreIn ward 37 ganga nagar p-point, house no. p-75 to p-85, p-96 to p-56, p-290 to p-295, p-281 to p-238, drain repair and road improvement work by cc.
In ward 37 ganga nagar p-point, house no. p-75 to p-85, p-96 to p-56, p-290 to p-295, p-281 to p-238, drain repair and road improvement work by cc.
Read morePaver block refixing and maintenance work on both side of road at tilak nagar lane no. 01 to 09 krushi vihar sector a, b and kalani bakhtawar ram nagar sector a, b, c, d in ward no. 49 under zone no. 10
Paver block refixing and maintenance work on both side of road at tilak nagar lane no. 01 to 09 krushi vihar sector a, b and kalani bakhtawar ram nagar sector a, b, c, d in ward no. 49 under zone no. 10
Read moreof your Industry type