Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Feeders 1 & 2 And Bus Coupler Power Con.
|
| Description |
Feeders 1 & 2 And Bus Coupler Power Con.
|
| Organisation | Ministry of Railways |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link | Login to view |
| Start Date | October 10, 2026 17:54 |
| End Date |
Open
20/10/2026
5 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of 245kv bus coupler bay alongwith installation of various equipment
Construction of 245kv bus coupler bay alongwith installation of various equipment at 220 kv s/s sikandra, agra under etd- ii agra
Read moreSupply of control and protection panels for feeder, transformer, capacitor bank, bus-coupler and bus-bar for 230kv, 110kv sub-stations
Supply of control and protection panels for feeder, transformer, capacitor bank, buscoupler and busbar for 230kv, 110kv substations
Read moreProvn of 11 kv vcb, sf6 (rmu) and bus coupler for vairangte station at xxxxx under ge silchar
Provn of 11 kv vcb, sf6 (rmu) and bus coupler for vairangte station at xxxxx under ge silchar
Read more1x2 fiber optic coupler as per attached annexure,1x4 fiber optic coupler as per attached annexure,1x8 fiber optic coupler as per attached annexure
1x2 fiber optic coupler as per attached annexure,1x4 fiber optic coupler as per attached annexure,1x8 fiber optic coupler as per attached annexure
Read moreErection and installation of 63mva t/f alongwith strengthening of 132kv bus bar from single moose to twin moose and twin jumpeirng of all 33kv feeders
Erection and installation of 63mva t/f alongwith strengthening of 132kv bus bar from single moose to twin moose and twin jumpeirng of all 33kv feeders
Read moreTtps operation circle cad unit iv annual maintenance in cooling water pump house ii lt 415v ac switch gear bus a modules, breaker and bus coupler during the forthcoming overhaul period 2026 to 2027
Ttps operation circle cad unit iv annual maintenance in cooling water pump house ii lt 415v ac switch gear bus a modules, breaker and bus coupler during the forthcoming overhaul period 2026 to 2027
Read moreReplacement of existing con...
Replacement of existing conductor 0.4 sq. inch acsr conductor with equivalent ht
Read moreReplacement of existing con...
Replacement of existing conductor 0.5 sq acsr conductor with equivalent htls conductor of current carrying capacity of 1200 amp on turnkey basis.
Read moreof your Industry type