Tender Details
Particulars | Details |
---|---|
Title |
Providing And Laying Sewer Line Form H/O Shahu To H/O Sonsarve Near Milind Buddha Vihar At Rambag In P.No. 17
|
Description |
Providing And Laying Sewer Line Form H/O Shahu To H/O Sonsarve Near Milind Buddha Vihar At Rambag In P.No. 17
|
Organisation | Nagpur Municipal Corporation Nagpur | State Govt. and UT |
Tender Id | 2025_NMCN_1166020_1 |
Reference Number |
12-2025/E.Z-4 |
Tender Fee | 1090 |
EMD | 4000 |
Tender Value | |
Place | Dhantoli Zone |
Link | https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2026705 |
Start Date | March 28, 2025 23:30 |
End Date |
04/04/2025 ( Expired 17 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreConst. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreDesign, supply and installation of highway lighting at 17 locations on krishnagiri to walajahpet section of nh-48 (old nh-46) in the state of tamil nadu on an item rate (percentage) basis
Design, supply and installation of highway lighting at 17 locations on krishnagiri to walajahpet section of nh-48 (old nh-46) in the state of tamil nadu on an item rate (percentage) basis
Read moreProviding short term road safety measures at morth identified blackspots locations based on accident data of 2019-21 of hyderabad-vijayawada section of nh-65 (old nh-9) from km.40.000 to 221.500 in the states of telangana and andhra pradesh.
Providing short term road safety measures at morth identified blackspots locations based on accident data of 2019-21 of hyderabad-vijayawada section of nh-65 (old nh-9) from km.40.000 to 221.500 in the states of telangana and andhra pradesh.
Read moreProviding lying and jointing of lateral sewer line with construction of manhole adjoining area of prn south zone 3 of swarn vihar stp under jurisdiction phe-i jda jaipur
Providing lying and jointing of lateral sewer line with construction of manhole adjoining area of prn south zone 3 of swarn vihar stp under jurisdiction phe-i jda jaipur
Read moreTermination of the lilo of 220 kv sherpur jhajra at 120 mw vyasi hep ujvnl for direct at 400 kv substation sherpur pgcil with a line length of apx 2.5 km partially o h approx. 1.5 km with multi-circuit towers and partially with ug apx length 1 km
Termination of the lilo of 220 kv sherpur jhajra at 120 mw vyasi hep ujvnl for direct at 400 kv substation sherpur pgcil with a line length of apx 2.5 km partially o h approx. 1.5 km with multi-circuit towers and partially with ug apx length 1 km
Read more82549/e8 special repair to sewage line in domestic area and roof of age b/r and ops complex of 19 hu at afs sulur
82549/e8 special repair to sewage line in domestic area and roof of age b/r and ops complex of 19 hu at afs sulur
Read moreConst of drainage system from campus to existing canal of state govt bihar near village and beautification of existing nalah at 48th bn katihar and construction of rain water harvesting system in the campus area of 48th bn, itbp, katihar bihar
Const of drainage system from campus to existing canal of state govt bihar , near village and beautification of existing nalah at 48th bn katihar and construction of rain water harvesting system in the campus area of 48th bn, itbp, katihar bihar
Read moreof your Industry type