Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Design, Fabrication, Supply, Installation, Testing And Commissioning Of False Key Arrangement For Control Valves Installed On Water Mains In E.S. Under A.E.W.W(m)e.S. I
|
| Description |
Design, Fabrication, Supply, Installation, Testing And Commissioning Of False Key Arrangement For Control Valves Installed On Water Mains In E.S. Under A.E.W.W(m)e.S. I
|
| Organisation | Municipal Corporation of Greater Mumbai | State Govt. and UT |
| Tender Id | 2024_MCGM_1049488_1 |
|
Reference Number |
Dy.H.E/2074/Maint dt.28.06.2024 |
| Tender Fee | 0 |
| EMD | 26000 |
| Tender Value | - |
| Place | Ghatkopar West |
| Link |
View Original Tender Notice
https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1832382 |
| Start Date | July 10, 2024 15:30 |
| End Date |
Expired
23/07/2024
Expired 816 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Mobilization and demobilization of manpower tools and tackles welding machine gas cutting scaffolding materials and other necessary equipment to site,dismantling removal of existing old damaged and rusted trash rack including cutting lifting handling and disposal as directed by eic,preparation of fabrication shop drawings based on departmental design drawings supply of structural steel fabrication,underwater inspection and cleaning of intake area before erection of new trash rack including detailed site inspection prior to preparation of fabrication drawings and furnishing of photographs etc,providing and applying one coat of metal primer and two coats of anti corrosive epoxy paint on fabricated trash rack,testing inspection and commissioning of newly installed trash rack including rectification of defects if any
Mobilization and demobilization of manpower tools and tackles welding machine gas cutting scaffolding materials and other necessary equipment to site,dismantling removal of existing old damaged and rusted trash rack including cutting lifting handling and disposal as directed by eic,preparation of fabrication shop drawings based on departmental design drawings supply of structural steel fabrication,underwater inspection and cleaning of intake area before erection of new trash rack including detailed site inspection prior to preparation of fabrication drawings and furnishing of photographs etc,providing and applying one coat of metal primer and two coats of anti corrosive epoxy paint on fabricated trash rack,testing inspection and commissioning of newly installed trash rack including rectification of defects if any
Read moreLevel transmitter radar type,complete of level gauge with valves and connecting arrangement,air detector sensor with electrolyte,residual clo2 analyzer with flow through assembly and stand alone skid,hand held unit for measurement of residual clo2 calorimetric dpd,diaphragm pressure gauges compatible with ms purita make ptp skid,diaphragm pressure gauges compatible with ms purita make 30 percent idct skid,diaphragm pressure gauges compatible with ms purita make 70 percent idct skid,diaphragm pressure gauges compatible with ms purita make ndct skid,spare dosing pump part no10 for ms purita make ptp skid installed in clo2 plant at rapp 7 8,spare dosing pump part no10 for ms purita make 30 percent idct skid installed in clo2 plant at rapp78,ph analyzer sensor and transmitter,level switch compatible with ms purita make skids ptp skid 30 percent idct skid 70percent idct skid ndct skid,flot type level switch,pipe mounted sight glass compatible with ms purita make ptp skid,pipe mounted sight glass compatible wit
Level transmitter radar type,complete of level gauge with valves and connecting arrangement,air detector sensor with electrolyte,residual clo2 analyzer with flow through assembly and stand alone skid,hand held unit for measurement of residual clo2 calorimetric dpd,diaphragm pressure gauges compatible with ms purita make ptp skid,diaphragm pressure gauges compatible with ms purita make 30 percent idct skid,diaphragm pressure gauges compatible with ms purita make 70 percent idct skid,diaphragm pressure gauges compatible with ms purita make ndct skid,spare dosing pump part no10 for ms purita make ptp skid installed in clo2 plant at rapp 7 8,spare dosing pump part no10 for ms purita make 30 percent idct skid installed in clo2 plant at rapp78,ph analyzer sensor and transmitter,level switch compatible with ms purita make skids ptp skid 30 percent idct skid 70percent idct skid ndct skid,flot type level switch,pipe mounted sight glass compatible with ms purita make ptp skid,pipe mounted sight glass compatible wit
Read moreDesign fabrication supply installation testing and commissioning of false key arrangement for control valves installed on water mains in k wards under ae maint ww ws south division
Design fabrication supply installation testing and commissioning of false key arrangement for control valves installed on water mains in k wards under ae maint ww ws south division
Read moreSupply of various sizes glandless sluice valves for a.e.w.w.(const.)e.s .
Supply of various sizes glandless sluice valves for a.e.w.w.(const.)e.s
Read moreDesign fabrication supply installation testing and commissioning of false key arrangements for control valves installed on water mains in h and k wards under ae maint ww ws south division
Design fabrication supply installation testing and commissioning of false key arrangements for control valves installed on water mains in h and k wards under ae maint ww ws south division
Read moreDesign, fabrication and supply of glandless fixtures for 300mm dia. sluice valve under a.e.w.w.(m)e.s-i division
Design, fabrication and supply of glandless fixtures for 300mm dia. sluice valve under a.e.w.w.(m)e.s-i division
Read moreSupply of material required for maintenance of various sizes water mains for a.e.w.w.(c)e.s. division
Supply of material required for maintenance of various sizes water mains for&#x0d a.e.w.w.(c)e.s. division
Read moreHiring of jcb with all accessories for carrying out repairs and maintenance of water mains and control valves in e.s. for a.e.w.w.(m)e.s-i division for the period of one year
Hiring of jcb with all accessories for carrying out repairs and maintenance of water mains and control valves in e.s. for a.e.w.w.(m)e.s-i division for the period of one year
Read moreSupply of various sizes kinetic air valves for emergency section under a.e.w.w.(maint.)e.s-i
Supply of various sizes kinetic air valves for emergency section under a.e.w.w.(maint.)e.s-i
Read moreSupply of various sizes glandless sluice valves for emergency section under a.e.w.w.(maint.)e.s-i.
Supply of various sizes glandless sluice valves for emergency section under a.e.w.w.(maint.)e.s-i.
Read moreof your Industry type