Mtps I Mill Plant Unit Iv Dismantling And Replacement Of Worn Out Damaged Skirt Board Assembly With New One Old Dismantling Re Assembling The Coal Flow Control Plate Measuring The Gap Between The Coal Flow Control Plate
|
| Description |
Mtps I Mill Plant Unit Iv Dismantling And Replacement Of Worn Out Damaged Skirt Board Assembly With New One Old Dismantling Re Assembling The Coal Flow Control Plate Measuring The Gap Between The Coal Flow Control Plate
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2025_EB_589594_1 |
|
Reference Number |
CE / MTPS-I / SE / M-I / MP /OT.240/ 2025-26 |
| Tender Fee | 0 |
| EMD | 1400 |
| Tender Value | - |
| Place | Mettur Thermal Power Station-I / Mettur Dam |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=704288 |
| Start Date | August 06, 2025 18:30 |
| End Date |
Expired
12/08/2025
Expired 431 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Mtps i mill plant unit ii complete dismantling and assembling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub etc in any one mill 2a to 2f
Mtps i mill plant unit ii complete dismantling and assembling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub etc in any one mill 2a to 2f
Read moreMtps i mill plant unit ii dismantling the eroded 90 degree ceralin coal bends from coal pipe lines and reconditioning the released one and assembling the reconditioned bends in an appropriate manner in the coal flow system during aoh 2026 27
Mtps i mill plant unit ii dismantling the eroded 90 degree ceralin coal bends from coal pipe lines and reconditioning the released one and assembling the reconditioned bends in an appropriate manner in the coal flow system during aoh 2026 27
Read moreMtps i mill plant unit iii complete dismantling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub etc in any one mill 3a 3b 3c 3f tilting work
Mtps i mill plant unit iii complete dismantling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub etc in any one mill 3a 3b 3c 3f tilting work
Read moreMtps i mill plant unit ii dismantling and assembling of coal pipe bends and patch welding the eroded portions of coal bends pipelines between mill outlet elbow and fuel inlet elbow during annual overhaul 2026 27
Mtps i mill plant unit ii dismantling and assembling of coal pipe bends and patch welding the eroded portions of coal bends pipelines between mill outlet elbow and fuel inlet elbow during annual overhaul 2026 27
Read moreMtps i mill plant unit ii dismantling and assembling of coal pipe bends and patch welding the eroded portions of coal bends pipelines between mill outlet elbow and fuel inlet elbow during annual overhaul 2026 27
Mtps i mill plant unit ii dismantling and assembling of coal pipe bends and patch welding the eroded portions of coal bends pipelines between mill outlet elbow and fuel inlet elbow during annual overhaul 2026 27
Read moreMtps i tm unit ii cleaning hydraulic testing of lub oil coolers working oil coolers dismantling cleaning and assembling of suction strainers of bfps ceps renewal of bfp leak off line and suction discharge flange gaskets inspection oh of mechanical
Mtps i tm unit ii cleaning hydraulic testing of lub oil coolers working oil coolers dismantling cleaning and assembling of suction strainers of bfps ceps renewal of bfp leak off line and suction discharge flange gaskets inspection oh of mechanical
Read moreMtps i mill plant unit ii dismantling and assembling of coal pipes with bends and renewal of eroded pipes of length at about 15 mtr length along with bends between mill outlet elbow and fuel inlet elbow during aoh 2026 27
Mtps i mill plant unit ii dismantling and assembling of coal pipes with bends and renewal of eroded pipes of length at about 15 mtr length along with bends between mill outlet elbow and fuel inlet elbow during aoh 2026 27
Read moreCylinder liner, dry and wet liner, press fit and slide fit liner,different type of engine bearing model,different type of piston model,engineers stethoscope,fuel injection pump dismantling tool kit, universal vice,injector testing set, hand tester,oil pump for dismantling and assembling.,piston ring groove cleaner.,radiator cut section, cross flow,radiator cut section, down flow,radiator pressure cap,starter motor axial type,starter motor pre engagement type,starter motor co axial type,turbocharger cut sectional view,valve lifter,valve spring compressor universal,water pump for dismantling and assembling
Cylinder liner, dry and wet liner, press fit and slide fit liner,different type of engine bearing model,different type of piston model,engineers stethoscope,fuel injection pump dismantling tool kit, universal vice,injector testing set, hand tester,oil pump for dismantling and assembling.,piston ring groove cleaner.,radiator cut section, cross flow,radiator cut section, down flow,radiator pressure cap,starter motor axial type,starter motor pre engagement type,starter motor co axial type,turbocharger cut sectional view,valve lifter,valve spring compressor universal,water pump for dismantling and assembling
Read moreMtps i mill plant unit ii fabrication of various length of 40 nb cooling water pipe line with flanges and assembling in the cooler cover of mill 2a to 2f and dismantling of seal air fan motor and overhauling reassembling setting the alignment
Mtps i mill plant unit ii fabrication of various length of 40 nb cooling water pipe line with flanges and assembling in the cooler cover of mill 2a to 2f and dismantling of seal air fan motor and overhauling reassembling setting the alignment
Read moreof your Industry type