Construction Of Indoor Control Room Building With Steel Structure And Puffed Panels Including 2 Nos. Transformer Plinth, Approach Road And Protection Wall For Establishment Of 33/11 Kv Ss At Mangadu Atlis.
|
Description |
Construction Of Indoor Control Room Building With Steel &Amp#X0d
Structure And Puffed Panels Including 2 Nos. Transformer Plinth, &Amp#X0d
Approach Road And Protection Wall For Establishment Of 33/11 &Amp#X0d
Kv Ss At Mangadu Atlis.
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2025_EB_518454_1 |
Reference Number |
CE/D/KPMR/C.918/2024 - 2025 |
Tender Fee | 0 |
EMD | 1.68 Lakh |
Tender Value | |
Place | Kanchipuram Region |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=616977 |
Start Date | January 14, 2025 18:30 |
End Date |
23/01/2025 ( Expired 111 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Extension of control room building and renovation of switchyard with allied civil works at boro 33/11 kv sub-station under raghunathpur division, dist.- purulia.
Extension of control room building and renovation of switchyard with allied civil works at boro 33/11 kv sub-station under raghunathpur division, dist.- purulia.
Read moreConstruction of high security jail complex at narela, delhi (sh- construction of ward block, control room and dispensary, langar with mess staff, administration block, 3 nos. r.c.c. boundary wall, 8 nos watch towers, 8 nos rcc and steel entry gate
Construction of high security jail complex at narela, delhi (sh- construction of ward block, control room and dispensary, langar with mess staff, administration block, 3 nos. r.c.c. boundary wall, 8 nos watch towers, 8 nos rcc and steel entry gate
Read moreProviding and laying of cement concrete approach road and cement concrete paver blocks in front of control room building at 400 kv substation, rishikesh
Providing and laying of cement concrete approach road and cement concrete paver blocks in front of control room building at 400 kv substation, rishikesh
Read moreConstruction of compound wall on west side and south side at existing anna salai 33 / 11 kv indoor ss
Construction of compound wall on west side and south side at existing anna salai 33 / 11 kv indoor ss
Read moreShifting of 4nos 33kv ptr control panels and 2 nos 33kv feeder control panels at gopalpur 33 by 11 kv substation
Shifting of 4 nos 33kv ptr control panels and 2 nos 33kv feeder control panels at gopalpur 33 by 11 kv substation
Read more11 kv composite structure, 11 kv power cable work, 33 kv power cable work of new control room building of raninagar 33/11 kv sub-stn under jalpaiguri division.
11 kv composite structure, 11 kv power cable work, 33 kv power cable work of new control room building of raninagar 33/11 kv sub-stn under jalpaiguri division.
Read moreExtension of control room building and plinth heightening of existing foundation of station service transformer at rabindrabhavan 33/11kv substation under south malda division in the district of malda(2nd call)
Extension of control room building and plinth heightening of existing foundation of station service transformer at rabindrabhavan 33/11kv substation under south malda division in the district of malda(2nd call)
Read moreReconstruction of control room building and b/wall along with earth filling at 33/11 kv s/s mirzewali mer
Reconstruction of control room building and b/wall along with earth filling at 33/11 kv s/s mirzewali mer
Read moreProviding barbed wire to the existing angular post of transformer near gate no.2 to hostel block, pump room to overhead tank in staff qrts and providing 90 cm high and 2.5m long welded mesh panels with barbed wire fencing from over head tank to security wall of studio at ddk, hyderabad.
Providing barbed wire to the existing angular post of transformer near gate no.2 to hostel block, pump room to overhead tank in staff qrts and providing 90 cm high and 2.5m long welded mesh panels with barbed wire fencing from over head tank to security wall of studio at ddk, hyderabad.
Read moreSupply erection testing and commissioning of 6.3 mva,33/6.6 kv transformer with buy back of faulty 6.3 mva transformer of spare bay at stage 2 ofvarangaon talwel lift irrigation scheme tal bhusawal dist jalgaon
Supply erection testing and commissioning of 6.3 mva,33/6.6 kv transformer with buy back of faulty 6.3 mva transformer of spare bay at stage 2 ofvarangaon talwel lift irrigation scheme tal bhusawal dist jalgaon
Read moreof your Industry type