Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Reconstruction Of Remaining Part Of Sahpur Bhauriganj Link Road In 2023 24
|
| Description |
Reconstruction Of Remaining Part Of Sahpur Bhauriganj Link Road In 2023 24
|
| Organisation | Government of Uttar Pradesh |
| Tender Id | 2023_CEDPW_843175_1 |
|
Reference Number |
2076/2A Dated 19-09-2023 |
| Tender Fee | 900 |
| EMD | 2.75 Lakh |
| Tender Value | |
| Place | Office of EE CD-2 PWD Gonda |
| Link |
View Original Tender Notice
https://etender.up.nic.in |
| Start Date | September 29, 2023 14:30 |
| End Date |
Expired
10/10/2023
Expired 1014 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Strengthening and reconstruction of nh-6 (spur) from km 0.00 to km 38.80 in the state of mizoram
Strengthening and reconstruction of nh-6 (spur) from km 0.00 to km 38.80 in the state of mizoram
Read moreDevelopment of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreConstruction of road on bagoli thikariya mdr-276 in gram jajod (1.10km) ch50/475 to ch51/575
Construction of road on bagoli thikariya mdr-276 in gram jajod (1.10km) ch50/475 to ch51/575
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreSepcial repair of sahpur dhanawa link road in 2023-24
Sepcial repair of sahpur dhanawa link road in 2023-24
Read moreSepcial repair of sahpur vijaypurwa link road in 2023-24
Sepcial repair of sahpur vijaypurwa link road in 2023-24
Read moreReconstruction of ghamsara link road in 2023-24
Reconstruction of ghamsara link road in 2023-24
Read moreof your Industry type