Tender Details
Particulars | Details |
---|---|
Title |
Fdr/ Urgent Construction Of Rcc Box Cell (7.00 X 7.00 Mtr.) At Chainage 2.30 Km On The Road From Nh 08 To Achaichi Mog Para (Mla Para) During The Year 2024 25
|
Description |
Fdr/ Urgent Construction Of Rcc Box Cell (7.00 X 7.00 Mtr.) At Chainage 2.30 Km On The Road From Nh 08 To Achaichi Mog Para (Mla Para) During The Year 2024 25/ Sh Dismantling Of Existing Box Cell, Rcc Work, Approach Work Etc.
|
Organisation | Chief Engineer, PWD (R and B) | State Govt. and UT |
Tender Id | 2024_CEPWD_56341_1 |
Reference Number |
118/NIT/SE-III/R/2024-25 |
Tender Fee | 4000 |
EMD | 2.08 Lakh |
Tender Value | |
Place | Santirbazar, South Tripura |
Link | https://tripuratenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=57256 |
Start Date | December 30, 2024 19:35 |
End Date |
06/01/2025 ( Expired 106 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of hl rcc bridge (5x26.50m) in km 19 (kinjer) of nh 33 (old nh 110, km 71) in the district of arwal in the state of bihar for the year 2024 25 under nh divison gaya on epc mode
Construction of hl rcc bridge (5x26.50m) in km 19 (kinjer) of nh33 (old nh 110, km 71) in the district of arwal in the state of bihar for the year 2024 25 under nh divison gaya on epc mode
Read moreFdr/mtc. of road from dalak gamako road to paschim malbassa a.w.c(l-1.450 km) under pwd(randb) amarpur sub-division -i during the year 2024-25/sh- metalling, re-carpetting, sand seal coating, retaining wall, cd etc.
Fdr/mtc. of road from dalak gamako road to paschim malbassa a.w.c(l-1.450 km) under pwd(randb) amarpur sub-division -i during the year 2024-25/sh- metalling, re-carpetting, sand seal coating, retaining wall, cd etc.
Read moreConstruction a box-cell 7 x 6 x 3 mtr at ch-2-615 km of temporipada to telenpali opgc road in the district of jharsuguda for the year 2024-25
Road work
Read moreFdr to reconstruction of damaged, narrow pipe culverts from km 0/0 to 10/0 (12nos), construction of drain in kulaspur village limits from km 3/8-10 and strengthening of road in mullangi village limits from km 7/4-8 on mogpal to nh-44 (via) kanjar, kulaspur dichpally railway station road and lead road to kanjar from km 0/0 to 15/4 in nizamabad district.
Fdr to reconstruction of damaged, narrow pipe culverts from km 0/0 to 10/0 (12nos), construction of drain in kulaspur village limits from km 3/8-10 and strengthening of road in mullangi village limits from km 7/4-8 on mogpal to nh-44 (via) kanjar, kulaspur dichpally railway station road and lead road to kanjar from km 0/0 to 15/4 in nizamabad district.
Read moreMaintenance of road from damcherra to ballukcherra road at ch. 12.05 km under damcherra sub division, pwd r and b during the year 2025 2026 sh construction of cd,gsb,wbm 3, rcc drain with cover plate, pucca drain etc.
Maintenance of road from damcherra to ballukcherra road at ch. 12.05 km under damcherra sub division, pwd r and b during the year 2025 2026 sh construction of cd,gsb,wbm 3, rcc drain with cover plate, pucca drain etc.
Read moreUrgent fdr of road from kanchanpur-jalabassa road to netajinagar under jampui hill sub-division, pwd(rnb) during the year 2025-26 sh- rcc u-shapped drain at ch 0.980 km , length 60.0 mtr.
Urgent fdr of road from kanchanpur-jalabassa road to netajinagar under jampui hill sub-division, pwd(rnb) during the year 2025-26 sh- rcc u-shapped drain at ch 0.980 km , length 60.0 mtr.
Read moreMtc. of road from rabindranagar to shibnagar at ch 2.25 km under jampui hill sub-division, pwd(rnb) during the year 2025-26 sh- construction of rcc protection wall, plcing of filter media, back fillinh etc. (length 20.10 mtr).
Mtc. of road from rabindranagar to shibnagar at ch 2.25 km under jampui hill sub-division, pwd(rnb) during the year 2025-26 sh- construction of rcc protection wall, plcing of filter media, back fillinh etc. (length 20.10 mtr).
Read moreMtc. of kanchanpur-jalabassa road under jampui hill sub-division, pwd(rnb) during the year 2025-26 sh- construction of rcc protection wall, sal piling, laying of filter bed, back filling etc. at ch 3.90 km near santipur pump house (length 18.30 mtr)
Mtc. of kanchanpur-jalabassa road under jampui hill sub-division, pwd(rnb) during the year 2025-26 sh- construction of rcc protection wall, sal piling, laying of filter bed, back filling etc. at ch 3.90 km near santipur pump house (length 18.30 mtr)
Read moreMtc. of kanchanpur-jalabassa road under jampui hill sub-division, pwd(rnb) during the year 2025-26 sh- construction of rcc protection wall, sal piling, laying of filter bed, back filling etc. at ch 3.90 km near santipur pump house (length 19.20 mtr)
Mtc. of kanchanpur-jalabassa road under jampui hill sub-division, pwd(rnb) during the year 2025-26 sh- construction of rcc protection wall, sal piling, laying of filter bed, back filling etc. at ch 3.90 km near santipur pump house (length 19.20 mtr)
Read moreBalance work for construction of rcc br.no.4/1 on road from nh-39 to old nd road via balipathar shyam gaon over river dhansiri at neparpatty ferry ghat including approaches and protection works under mlcsna under ridf-xxv of nabard for 2019-20
Balance work for construction of rcc br.no.4/1 on road from nh-39 to old nd road via balipathar shyam gaon over river dhansiri at neparpatty ferry ghat including approaches and protection works under mlcsna under ridf-xxv of nabard for the year 2019-
Read moreof your Industry type