Dismantling Of Unused 28 Span Of 440 V, 3 Phase, 4 Wire O/H Line From Silo/Rls To 20 Mw Solar Power Plant Construction Site With Fabrication And Fixing Of 02 Nos. Tubular Pole Make Lighting Tower And Some Related 440 V O/H Line Work At Bahera Durga M
|
Description |
Dismantling Of Unused 28 Span Of 440 V, 3 Phase, 4 Wire O/H Line From Silo/Rls To 20 Mw Solar Power Plant Construction Site With Fabrication And Fixing Of 02 Nos. Tubular Pole Make Lighting Tower And Some Related 440 V O/H Line Work At Bahera Durga M
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_CCL_333606_1 |
Reference Number |
PE/Elec/CHP/PPR/e-NIT/24-25/44 |
Tender Fee | 0 |
EMD | 4600 |
Tender Value | |
Place | OFFICE OF PO CHP-CPP, Piparwar Area, CCL |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=345819 |
Start Date | March 31, 2025 22:30 |
End Date |
10/04/2025 ( Expired 10 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Dismantling of unused 28 span of 440 v, 3 phase, 4 wire o/h line from silo/rls to 20 mw solar power plant construction site with fabrication and fixing of 02 nos. tubular pole make lighting tower and some related 440 v o/h line work at bahera durga m
Dismantling of unused 28 span of 440 v, 3 phase, 4 wire o/h line from silo/rls to 20 mw solar power plant construction site with fabrication and fixing of 02 nos. tubular pole make lighting tower and some related 440 v o/h line work at bahera durga m
Read more(a)dismantling of 6 nos. pole and 8 mtrs. 220 x 2 wire o/h line and re-erection of 9 no. pole and 8 mtrs 220 x 2 wire o/h conductor(b) erection of 09 pole 450 mtrs x 2 wire o/h conductor of 220 v from new 6 no.incline sub-station at 6 no. attendance
(a)dismantling of 6 nos. pole and 8 mtrs. 220 x 2 wire o/h line and re-erection of 9 no. pole and 8 mtrs 220 x 2 wire o/h conductor(b) erection of 09 pole 450 mtrs x 2 wire o/h conductor of 220 v from new 6 no.incline sub-station at 6 no. attendance
Read moreDismantling /erection of pole with changing of damage stay, pin insulator and conductor of 440 v o/h line from garhi filter pump house to intake well under chp-cpp/ppr.
Dismantling /erection of pole with changing of damage stay, pin insulator and conductor of 440 v o/h line from garhi filter pump house to intake well under chp-cpp/ppr.
Read more(a)erection of 2 nos 1250 amps. a.b.switch of 3.3 kv grade and 4 nos. pipe pole(b) dismantling of 280 mtrs x 4 wire old and damaged overhead conductor of 440 volt(c) dismantling of (i) 10 nos. 440v o/h line from durga mandir sub-station to gokul park
(a)erection of 2 nos 1250 amps. a.b.switch of 3.3 kv grade and 4 nos. pipe pole(b) dismantling of 280 mtrs x 4 wire old and damaged overhead conductor of 440 volt(c) dismantling of (i) 10 nos. 440v o/h line from durga mandir sub-station to gokul park
Read more(a)(i) dismantling of 11 kv o/h line to 600 gpm pumping site from tapping point at 11 kv feeder of lodna-3 and (ii) di of 3.3 kv overhead line of feeder-i and feeder-ii from 6 pit(b) erection of 8 no. pipe pole and 400 mtrs 2 wire of 220 volt
(a)(i) dismantling of 11 kv o/h line to 600 gpm pumping site from tapping point at 11 kv feeder of lodna-3 and (ii) di of 3.3 kv overhead line of feeder-i and feeder-ii from 6 pit(b) erection of 8 no. pipe pole and 400 mtrs 2 wire of 220 volt
Read moreFor dismantling and re-erection of 440v o/h line with o7 nos pole and 07 span conductor providing power to new weigh bridge and high mast tower at godher kwsk siding under ngk colliery
For dismantling and re-erection of 440v o/h line with o7 nos pole and 07 span conductor providing power to new weigh bridge and high mast tower at godher kwsk siding under ngk colliery
Read moreDismantling of tubular pole and tower light installed at coal stock number 43 as well as replacement of damaged flood light of coal stock area of chamatu, shifting of lt o/h line from wb-16 to wb-15 due to construction of transport road at chamatu
Dismantling of tubular pole and tower light installed at coal stock number 43 as well as replacement of damaged flood light of coal stock area of chamatu, shifting of lt o/h line from wb-16 to wb-15 due to construction of transport road at chamatu
Read moreDi of 11 kv o/h line at thena rehabilitation village at kalyanpur and 440 v o/h line in some part of karo village feeder with heightening of 02 nos. of 11 kv pole under chp-cpp, ppr.
Di of 11 kv o/h line at thena rehabilitation village at kalyanpur and 440 v o/h line in some part of karo village feeder with heightening of 02 nos. of 11 kv pole under chp-cpp, ppr.
Read moreA) dismantling and erection of 550v overhead line consisting 12 nos. cement pole and 10 nos tubular pole. (b) shifting of 440v o/h lighting supply of jamdehi and 550v o/h line for pump supply due to mine extension.
A) dismantling and erection of 550v overhead line consisting 12 nos. cement pole and 10 nos tubular pole. (b) shifting of 440v o/h lighting supply of jamdehi and 550v o/h line for pump supply due to mine extension.
Read moreDismantling of 06 nos pipe pole and o/h conductor of 300 mtrs 2 wire 220 v and re-erection at same b-patch for providing lighting line in -order fix lights for proper illumination of pumping site at b-patch of amal. nt-st-jg colliery under lodna are
Dismantling of 06 nos pipe pole and o/h conductor of 300 mtrs 2 wire 220 v and re-erection at same b-patch for providing lighting line in -order fix lights for proper illumination of pumping site at b-patch of amal. nt-st-jg colliery under lodna are
Read moreof your Industry type