Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Maintenance Of Rehabiliation And Upgradation Of Narsapur To Barasgaon Section Of Nh 222 Ch 66.700 To Ch 92.565 And Ch 92.565 To Ch 96.750 To 4 L With Paved Shoulder On Epc Mode Under Nhdp Iv In Maharashtra On Risk And Cost Of Contractor
|
| Description |
Maintenance Of Rehabiliation And Upgradation Of Narsapur To Barasgaon Section Of Nh 222 Ch 66.700 To Ch 92.565 And Ch 92.565 To Ch 96.750 To 4 L With Paved Shoulder On Epc Mode Under Nhdp Iv In Maharashtra On Risk And Cost Of Contractor
|
| Organisation | Ministry of Road Transport and Highways | Central Govt. Ministry/Department |
| Tender Id | 2025_MoRTH_849450_1 |
|
Reference Number |
NITNo.18/EENH/NED/371/2024-25 |
| Tender Fee | 1800 |
| EMD | 27.17 Lakh |
| Tender Value | |
| Place | Nanded |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=892942 |
| Start Date | February 15, 2025 22:15 |
| End Date |
Expired
04/04/2025
Expired 455 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreConsultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Read moreRehabitation and upgradation nh-66 earstwhile nh-17form km 241.300 to 281.300 aravali to kante section to four lane with paved shoulder in the state of maharashtra under nhdp-iv on hybrid annuity mode.epc mode. maintenance on risk and cost basis part
Rehabitation and upgradation nh-66 earstwhile nh-17form km 241.300 to 281.300 aravali to kante section to four lane with paved shoulder in the state of maharashtra under nhdp-iv on hybrid annuity mode.epc mode. maintenance on risk and cost basis part
Read moreEngagement of user fee agency through cb at tarpongi fp(ch. 32.013) on 4/6 lanes with paved shoulder of raipur-simga section from ch. 0.00 to 48.58on nh-200 (new nh-30) under nhdp iv through epc mode in chhattisgarh
Engagement of user fee agency through cb at tarpongi fp(ch. 32.013) on 4/6 lanes with paved shoulder of raipur-simga section from ch. 0.00 to 48.58on nh-200 (new nh-30) under nhdp iv through epc mode in chhattisgarh
Read moreRehabilitation and upgradation of viaragarh (mohadi) from design ch. 73.830 to ch.76.00 (length 2.17km) in chikhli khamgaon section of nh 548cc to two lane with paved shoulder configuration in the state of maharashtra on epc mode.
Rehabilitation and upgradation of viaragarh (mohadi) from design ch. 73.830 to ch.76.00 (length 2.17km) in chikhli khamgaon section of nh 548cc to two lane with paved shoulder configuration in the state of maharashtra on epc mode.
Read moreRehabilitation and upgradation to two lane with paved shoulder configuration of nh752g from sakri to pimpalner section design ch km 0.000 to ch km 21.411 in the state of maharashtra on epc mode
Rehabilitation and upgradation to two lane with paved shoulder configuration of nh752g from sakri to pimpalner section design ch km 0.000 to ch km 21.411 in the state of maharashtra on epc mode
Read moreRehabilitation and upgradation of ghoti to trimbak section of nh-160a (km 53.500 to km 101.100) to 4-lane with paved shoulder (47.600 km) in the state of maharashtra on epc mode
Rehabilitation and upgradation of ghoti to trimbak section of nh-160a (km 53.500 to km 101.100) to 4-lane with paved shoulder (47.600 km) in the state of maharashtra on epc mode.
Read moreRehabilitation and upgradation of pohaner phata to pathari design ch 25 500 to 41 00 section of nh 548b to two lane with paved shoulder on epc mode in the state of maharashtra length 15 5 km
Rehabilitation and upgradation of pohaner phata to pathari design ch 25 500 to 41 00 section of nh 548b to two lane with paved shoulder on epc mode in the state of maharashtra length 15 5 km
Read moreof your Industry type