Tender Details

Particulars Details
Title
Maintenance Of Rehabiliation And Upgradation Of Narsapur To Barasgaon Section Of Nh 222 Ch 66.700 To Ch 92.565 And Ch 92.565 To Ch 96.750 To 4 L With Paved Shoulder On Epc Mode Under Nhdp Iv In Maharashtra On Risk And Cost Of Contractor
Description
Maintenance Of Rehabiliation And Upgradation Of Narsapur To Barasgaon Section Of Nh 222 Ch 66.700 To Ch 92.565 And Ch 92.565 To Ch 96.750 To 4 L With Paved Shoulder On Epc Mode Under Nhdp Iv In Maharashtra On Risk And Cost Of Contractor
Organisation Ministry of Road Transport and Highways | Central Govt. Ministry/Department
Tender Id 2025_MoRTH_849450_1
Reference
Number
NITNo.18/EENH/NED/371/2024-25
Tender Fee 1800
EMD 27.17 Lakh
Tender Value
Place Nanded
Link
View Original Tender Notice

https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=892942

Start Date February 15, 2025 22:15
End Date
Expired 04/04/2025

Expired 455 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).

Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).

Read more
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode

Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode

Read more
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Read more
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode

Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode

Read more
Rehabitation and upgradation nh-66 earstwhile nh-17form km 241.300 to 281.300 aravali to kante section to four lane with paved shoulder in the state of maharashtra under nhdp-iv on hybrid annuity mode.epc mode. maintenance on risk and cost basis part

Rehabitation and upgradation nh-66 earstwhile nh-17form km 241.300 to 281.300 aravali to kante section to four lane with paved shoulder in the state of maharashtra under nhdp-iv on hybrid annuity mode.epc mode. maintenance on risk and cost basis part

Read more
Engagement of user fee agency through cb at tarpongi fp(ch. 32.013) on 4/6 lanes with paved shoulder of raipur-simga section from ch. 0.00 to 48.58on nh-200 (new nh-30) under nhdp iv through epc mode in chhattisgarh

Engagement of user fee agency through cb at tarpongi fp(ch. 32.013) on 4/6 lanes with paved shoulder of raipur-simga section from ch. 0.00 to 48.58on nh-200 (new nh-30) under nhdp iv through epc mode in chhattisgarh

Read more
Rehabilitation and upgradation of viaragarh (mohadi) from design ch. 73.830 to ch.76.00 (length 2.17km) in chikhli khamgaon section of nh 548cc to two lane with paved shoulder configuration in the state of maharashtra on epc mode.

Rehabilitation and upgradation of viaragarh (mohadi) from design ch. 73.830 to ch.76.00 (length 2.17km) in chikhli khamgaon section of nh 548cc to two lane with paved shoulder configuration in the state of maharashtra on epc mode.

Read more
Rehabilitation and upgradation to two lane with paved shoulder configuration of nh752g from sakri to pimpalner section design ch km 0.000 to ch km 21.411 in the state of maharashtra on epc mode

Rehabilitation and upgradation to two lane with paved shoulder configuration of nh752g from sakri to pimpalner section design ch km 0.000 to ch km 21.411 in the state of maharashtra on epc mode

Read more
Rehabilitation and upgradation of ghoti to trimbak section of nh-160a (km 53.500 to km 101.100) to 4-lane with paved shoulder (47.600 km) in the state of maharashtra on epc mode

Rehabilitation and upgradation of ghoti to trimbak section of nh-160a (km 53.500 to km 101.100) to 4-lane with paved shoulder (47.600 km) in the state of maharashtra on epc mode.

Read more
Rehabilitation and upgradation of pohaner phata to pathari design ch 25 500 to 41 00 section of nh 548b to two lane with paved shoulder on epc mode in the state of maharashtra length 15 5 km

Rehabilitation and upgradation of pohaner phata to pathari design ch 25 500 to 41 00 section of nh 548b to two lane with paved shoulder on epc mode in the state of maharashtra length 15 5 km

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise