Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🚂 Procurement Opportunity: Upgradation Of Electric Traction System 🔧🚂 The Ministry Of Railways, Central Government, Invites Tenders From Experienced Contractors For The Design, Supply, Erection, Testing, And Commissioning Of An Upgraded 1x25 K V Electric Traction System To A 2x25 K V System On The Bilaspur Anuppur Section Of The Bilaspur Division Over South Eastern Central Railway (Secr), Between 151 Rkm And 353 Tkm. 📅 Bid Submission Deadline: May 15, 2024, 3:00 Pm A Tender Fee Of Inr 5,74,510 Has Been Set. Interested Bidders Must Submit Detailed Proposals, Including Technical Specifications, Pricing, And Project Execution Timelines, Adhering To The Tender Document Guidelines. Keywords: Electric Traction System, Railways, Infrastructure Upgrade, Tender, Ministry Of Railways, South Eastern Central Railway, Secr, Bilaspur Division, Procurement| Particulars | Details |
|---|---|
| Title |
Design, Supply, Erection ,Testing And Commissioning For Upgradation Of Existing 1x25 K V Electric Traction System Into 2x25 K V Electric Traction System In Between Bilaspur Anuppur Section Of Bilaspur Division Over Secr (151 Rkm/ 353 Tkm)
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 74565373 |
|
Reference Number |
CPMELBSP-APR24-25-02 |
| Tender Fee | 0 |
| EMD | 57.45 Lakh |
| Tender Value | - |
| Place | Bilaspur |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/052024/74565373/viewNitPdf_4533958.pdf |
| Start Date | April 10, 2024 19:00 |
| End Date |
Expired
15/05/2024
Expired 883 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Design, supply, erection, testing & commissioning of 132/55 kv traction substation, sectioning post (sps) and sub sectioning post (ssps) in 2x25 kv traction system (scott connected transformer) of madar(md)-bhinwaliya(bwa) section of ajmer division of north western railway
Design, supply, erection, testing & commissioning of 132/55 kv traction substation, sectioning post (sps) and sub sectioning post (ssps) in 2x25 kv traction system (scott connected transformer) of madar(md)-bhinwaliya(bwa) section of ajmer division of north western railway
Read moreDesign, supply, erection, testing & commissioning of 2x25 kv, 50 hz, traction over-head equipment, traction substations, switching stations, scada, general electrical services works along with ohe works in 5 nos of tunnels (total length:7.5 kms), civil engineering works and other associated works between section digras (excl.) - nanded (excl.) 128 rkm /146 tkm of nagpur division in central railway, maharashtra, india
Design, supply, erection, testing & commissioning of 2x25 kv, 50 hz, traction over-head equipment, traction substations, switching stations, scada, general electrical services works along with ohe works in 5 nos of tunnels (total length:7.5 kms), civil engineering works and other associated works between section digras (excl.) - nanded (excl.) 128 rkm /146 tkm of nagpur division in central railway, maharashtra, india
Read moreOhe modification works with 2x25 kv traction in connection with yard remodelling of talodhi, rajori, mul-maroda, kelzar and chanda ford station in connection with gondia-chandafort doubling project in nagpur division of s.e.c. railway.
Ohe modification works with 2x25 kv traction in connection with yard remodelling of talodhi, rajori, mul-maroda, kelzar and chanda ford station in connection with gondia-chandafort doubling project in nagpur division of s.e.c. railway.
Read moreDesign, supply, erection, testing and commissioning of 2x25 kv auto-transformer (at) feeding system, including 220/55 kv makkajipalli (mkj) traction substations, dharmavaram (dmm) sectioning posts (sps), nagasamudram (ngm) and penukonda (pkd) sub-sectioning posts (ssps), in bangalore-dharmavaram section in bangalore division of south western railway
Design, supply, erection, testing and commissioning of 2x25 kv auto-transformer (at) feeding system, including 220/55 kv makkajipalli (mkj) traction substations, dharmavaram (dmm) sectioning posts (sps), nagasamudram (ngm) and penukonda (pkd) sub-sectioning posts (ssps), in bangalore-dharmavaram section in bangalore division of south western railway
Read moreDesign, supply, erection, testing and commissioning of 2x25 kv auto-transformer (at) feeding system, including 220/55 kv makkajipalli (mkj) traction substations, dharmavaram (dmm) sectioning posts (sps), nagasamudram (ngm) and penukonda (pkd) sub-sectioning posts (ssps), in bangalore-dharmavaram section in bangalore division of south western railway
Design, supply, erection, testing and commissioning of 2x25 kv auto-transformer (at) feeding system, including 220/55 kv makkajipalli (mkj) traction substations, dharmavaram (dmm) sectioning posts (sps), nagasamudram (ngm) and penukonda (pkd) sub-sectioning posts (ssps), in bangalore-dharmavaram section in bangalore division of south western railway
Read moreDesign/modification, supply, erection, testing and commissioning of 132kv/2x25 kv scott connected traction sub station and switching posts with at between et to knw section of bhopal division of w c railway to meet 3000mt loading target.
Design/modification, supply, erection, testing and commissioning of 132kv/2x25 kv scott connected traction sub station and switching posts with at between et to knw section of bhopal division of w c railway to meet 3000mt loading target.
Read moreDesign, supply, erection, testing & commissioning of traction sub stations (scott/v connected) with associated switching posts (sp/ssp) for 2 x 25 kv feeding system along with provision of associated scada system in upgradation of electric traction system from 1x25kv to 2x25kv traction system for kumandih- garhwa section of ecr to meet 3000 mt loading target.
Design, supply, erection, testing & commissioning of traction sub stations (scott/v connected) with associated switching posts (sp/ssp) for 2 x 25 kv feeding system along with provision of associated scada system in upgradation of electric traction system from 1x25kv to 2x25kv traction system for kumandih- garhwa section of ecr to meet 3000 mt loading target.
Read moreRequest for proposal (rfp) for appointment of project supervision services agency (pssa) for providing project supervision services at various construction sites/sections for ohe up-gradation/modification related & other ancillary works in connection with 2x25 kv traction up-gradation works being executed by electrical project unit over north western railway for the construction period of 24 months
Request for proposal (rfp) for appointment of project supervision services agency (pssa) for providing project supervision services at various construction sites/sections for ohe up-gradation/modification related & other ancillary works in connection with 2x25 kv traction up-gradation works being executed by electrical project unit over north western railway for the construction period of 24 months
Read moreDesign, supply, erection, testing & commissioning of 2x25kv, 50hz single phase a.c. traction overhead equipment with 65 sq.mm catenary and 107/150 sq.mm contact wire, lt supply transformer stations including modifications to the existing ohe in view of proposed doubling between alamapur road -dupadu section with associated yard modifications on mahabubnagar-dhone section & modification of 1x25 kv sp at kotla to suit double line in hyderabad division of southcentral railway
Design, supply, erection, testing & commissioning of 2x25kv, 50hz single phase a.c. traction overhead equipment with 65 sq.mm catenary and 107/150 sq.mm contact wire, lt supply transformer stations including modifications to the existing ohe in view of proposed doubling between alamapur road -dupadu section with associated yard modifications on mahabubnagar-dhone section & modification of 1x25 kv sp at kotla to suit double line in hyderabad division of southcentral railway
Read moreConstruction of 4th line track work in between gamharia-chandil (excluding yards) including earthwork, blanketing, major bridges (bridge nos. 329, 334 & 335 for both 3rd & 4th line), road over bridge (6b), road under bridge, minor bridges, lc work and other miscellaneous works for 32.5t indian railway standard loading, execution of indoor & outdoor s&t works, execution of general electrical works, installation and commissioning of 2x25 kv overhead equipment (ohe) for traction
Construction of 4th line track work in between gamharia-chandil (excluding yards) including earthwork, blanketing, major bridges (bridge nos. 329, 334 & 335 for both 3rd & 4th line), road over bridge (6b), road under bridge, minor bridges, lc work and other miscellaneous works for 32.5t indian railway standard loading, execution of indoor & outdoor s&t works, execution of general electrical works, installation and commissioning of 2x25 kv overhead equipment (ohe) for traction
Read moreof your Industry type