Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Estimate Of Shifting Of 11 Kv And Lt Line Near Gupta Mall Taigore Ward Betul
|
| Description |
Estimate Of Shifting Of 11 Kv And Lt Line Near Gupta Mall Taigore Ward Betul
|
| Organisation | Government of Madhya Pradesh |
| Tender Id | 2023_UAD_292809_1 |
|
Reference Number |
NPPWD-2998-2023-Betul |
| Tender Fee | 2000 |
| EMD | 7900 |
| Tender Value | - |
| Place | Nagar Palika Parishad Betul |
| Link |
View Original Tender Notice
https://mptenders.gov.in |
| Start Date | July 21, 2023 18:10 |
| End Date |
Expired
28/07/2023
Expired 1172 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Shifting of 11kv, dtrs and lt line road widening near arabindo kohinoor apartment to sanju kiraana shop kondapur in kondapur section of kondapur sub division in kondapur division of cybercity circle
Shifting of 11kv, dtrs and lt line road widening near arabindo kohinoor apartment to sanju kiraana shop kondapur in kondapur section of kondapur sub division in kondapur division of cybercity circle
Read moreShifting of 11kv, dtrs and lt line road widening near sanju kiraana shop to velama sangam gate kondapur in kondapur section of kondapur sub division in kondapur division of cybercity circle
Shifting of 11kv, dtrs and lt line road widening near sanju kiraana shop to velama sangam gate kondapur in kondapur section of kondapur sub division in kondapur division of cybercity circle
Read moreShifting of 33kv/11kv/lt lines and 5x100kva distribution transformers due to obstructing the construction of road widening towards airport from collector camp office to aerodrome ground area in operation section adilabad town-3 of adilabad town sub-division in adilabad division of adilabad circle on partial turnkey basis
Shifting of 33kv/11kv/lt lines and 5x100kva distribution transformers due to obstructing the construction of road widening towards airport from collector camp office to aerodrome ground area in operation section adilabad town-3 of adilabad town sub-division in adilabad division of adilabad circle on partial turnkey basis
Read moreProviding of 132kv seetharambagh supply to 33/11kv nampally ss by laying of 1.8km of 33kv 3x400sq.mm xlpe ug cable (single run) from proposed dp structure at seetharampet operation section office to 33/11kv nampally ss (by utilizing double run 33kv cable sanctioned up to 33/11kv proposed goshamahal ss from 132kv seetharambagh ss in y-2025-12-01-03-01-002 i.e., shifting of 33/11kv goshamahal ss and connected lines) there by providing 132kv seetharambagh ss supply to 33/11kv nampally ss pertaining
Providing of 132kv seetharambagh supply to 33/11kv nampally ss by laying of 1.8km of 33kv 3x400sq.mm xlpe ug cable (single run) from proposed dp structure at seetharampet operation section office to 33/11kv nampally ss (by utilizing double run 33kv cable sanctioned up to 33/11kv proposed goshamahal ss from 132kv seetharambagh ss in y-2025-12-01-03-01-002 i.e., shifting of 33/11kv goshamahal ss and connected lines) there by providing 132kv seetharambagh ss supply to 33/11kv nampally ss pertaining to lines osmania section of lines asifnagar sub division in mehdipatnam operation division and work executed by the master plan sd-vi sub-division of mp-1 division of hyderabad master plan circle under t and d improvements to original works.
Read moreProviding transformer oil filtration, supply of transformer oil, 11kv horn gap fuses, 95sq.mm lt cable, fencing to sub-station, etc., in place of de-functioning equipment at 11kv/433v at electrical sub-station at division office premises, under eam cell of o and m.division-22, kukatpally zone, cyberabad.
Providing transformer oil filtration, supply of transformer oil, 11kv horn gap fuses, 95sq.mm lt cable, fencing to sub-station, etc., in place of de-functioning equipment at 11kv/433v at electrical sub-station at division office premises, under eam cell of o and m.division-22, kukatpally zone, cyberabad.
Read moreShifting/dismantling of lt/ht lines which are creating hurdles during road widening from starting point of cbi phatak rob to 7 no. bus stand, mahal road, zone-9, jda, jaipur.
Shifting/dismantling of lt/ht lines which are creating hurdles during road widening from starting point of cbi phatak rob to 7 no. bus stand, mahal road, zone-9, jda, jaipur.
Read moreProposal for shifting of 11kv lt lines along with dtrs due to road widening work from the existing 4lane road to 6 lane road boundaries 66 feet from the centre line on either side of the road from bellampally chowrasta to srinivasa garden in mancherial town 2 section of mancherial sub division, mancherial division, mancherial circle, on partial turnkey basis
Proposal for shifting of 11kv lt lines along with dtrs due to road widening work from the existing 4lane road to 6 lane road boundaries 66 feet from the centre line on either side of the road from bellampally chowrasta to srinivasa garden in mancherial town 2 section of mancherial sub division, mancherial division, mancherial circle, on partial turnkey basis
Read moreSupply of required led lighting consumables ,insulation tapes and 11kv,1 core x 70 sq.mm ,aluminium xlpe cable,heat shrinkable straight through joint kits for essd and lt and ht lighting section of power house at slbhes
Supply of required led lighting consumables ,insulation tapes and 11kv,1 core x 70 sq.mm ,aluminium xlpe cable,heat shrinkable straight through joint kits for essd and lt and ht lighting section of power house at slbhes
Read moreSitc of transformer (750 kva), ht & lt panel and cable, apfc (capacitor) panel, wiring and shifting of existing 320 kva dg at new s/s beside the cm secretariat, along with operation & maintenance for five years in the campus of 4 no. deshratan marg (4 kga), patna, bihar
Sitc of transformer (750 kva), ht & lt panel and cable, apfc (capacitor) panel, wiring and shifting of existing 320 kva dg at new s/s beside the cm secretariat, along with operation & maintenance for five years in the campus of 4 no. deshratan marg (4 kga), patna, bihar
Read moreSupply and fixing paving blocks from gupta mall to h.p. gas agency in taigore ward betul
Supply and fixing paving blocks from gupta mall to h.p. gas agency in taigore ward betul
Read moreof your Industry type