Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Installtion Solar Pump On Existing Borewells Work At Newargaon 2
|
| Description |
Installtion Solar Pump On
Existing Borewells Work
At Newargaon 2
|
| Organisation | Government of Maharashtra |
| Tender Id | 2023_AURAN_957785_1 |
|
Reference Number |
GP/SOLAR/PUMP/15/TENDER/2 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | |
| Place | NA |
| Link |
View Original Tender Notice
https://mahatenders.gov.in |
| Start Date | October 27, 2023 22:30 |
| End Date |
Expired
10/11/2023
Expired 952 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Procurement, installation and commissioning of two nos. vacuum pump with replacement of existing steam jet ejectors at gtps
Procurement, installation and commissioning of two nos. vacuum pump with replacement of existing steam jet ejectors at gtps&#x0d
Read more60 hp motor pump set supply and fitting work
60 hp motor pump set supply and fitting work at new duliya talai 60 hp pump house and natho talab pump house (60 hp)
Read moreDevelopment of existing berth no.7 as container terminal at v.o. chidambaranar port on design, build, finance, operate and transfer (dbfot) basis
Development of existing berth no.7 as container terminal at v.o. chidambaranar port on design, build, finance, operate and transfer (dbfot) basis
Read moreBitumen road work
New bitumen road work around the multi purpose building at gmrt and existing bitumen road resurfacing work at narayangaon housing colony, narayangaon and at gmrt khodad.
Read moreRectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor
Rectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor
Read moreTwo yearly comprensive repairing and maintenance work of all solar power plant at different location at ward no. 1 to 6 at various location in mbmc area.
Two yearly comprensive repairing and maintenance work of all solar power plant at different location at ward no. 1 to 6 at various location in mbmc area.
Read moreAr and mo of residential building of dgms at dhanbad during fy2025-26. (sh: replacement of sluice valve, including repair of gi pipe and misc. work at dgms club near hirapur colony, dgms dhanbad.
Read more05/ee(e)(puducherry)/cpwd/2026-27 - recall 2
Construction of 400 bedded boys hostel building at jipmer campus, puducherry. (civil work): building portion including internal water supply lines, sanitary installation, drainage, demolition of existing quarters and other development works. (electrical and mechanical installation): package c1: providing internal ei, c2: providing fire alarm system, c3: providing firefighting system, c4: providing cctv, c5: providing 3 nos. 13 passenger lift, c6: providing 5000 lpd solar water heater, c7: providing network, (agreement no.32/ee(puducherry)/cpwd/2023-24) sub head: risk and cost under clause 14 for providing 2nos. 13 passenger lift.
Read moreReplacement and upgradation of existing sewer line with upvc pipes in basement of pd area at millennium city centre gurugram metro station of line-2 south (six months).
Replacement and upgradation of existing sewer line with upvc pipes in basement of pd area at millennium city centre gurugram metro station of line-2 south (six months).
Read moreConsultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Read moreof your Industry type