Remaining Balance Work Left By Spcl Kipl Jv As Per Scope Of Work For Commissioning Of 5 Mld Capacity Stp At Dhuri Based On Sbr Technology Including Operation And Maintenance For A Period Of 60 Months After Stabilization Period Of 3 Months Or More.
|
| Description |
Remaining Balance Work Left By Spcl Kipl Jv As Per Scope Of Work For Commissioning Of 5 Mld Capacity Stp At Dhuri Based On Sbr Technology Including Operation And Maintenance For A Period Of 60 Months After Stabilization Period Of 3 Months Or More.
|
| Organisation | Department of Local Government | State Govt. and UT |
| Tender Id | 2025_DLG_144499_1 |
|
Reference Number |
BID NO.15(1) DATED 04.07.2025 |
| Tender Fee | 3360 |
| EMD | 7.86 Lakh |
| Tender Value | - |
| Place | Dhuri |
| Link |
View Original Tender Notice
https://eproc.punjab.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=292371 |
| Start Date | July 11, 2025 14:30 |
| End Date |
Expired
31/07/2025
Expired 409 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Remaining balance work left by spcl-kipl jv as per scope of work for commissioning of 5 mld capacity stp at dhuri based on sbr technology including operation and maintenance for a period of 60 months after stabilization period of 3 months or more.
Remaining balance work left by spcl-kipl jv as per scope of work for commissioning of 5 mld capacity stp at dhuri based on sbr technology including operation and maintenance for a period of 60 months after stabilization period of 3 months or more.
Read moreDesilting of sewer manholes upto 300 mm dia various streets at dhuri district sangrur on double recovery basis on spcl kipl jv
Desilting of sewer manholes upto 300 mm dia various streets at dhuri district sangrur on double recovery basis on spcl kipl jv
Read moreDesilting of sewer manholes upto 300 mm dia various streets at sangrur district sangrur on double recovery basis on spcl kipl jv
Desilting of sewer manholes upto 300 mm dia various streets at sangrur district sangrur on double recovery basis on spcl kipl jv
Read moreOperation and maintainance of stp 3 mld capacity on sbr technology at moonak distt. sangrur for the period of 9 months 01.07.2024 to 31.03.2025
Operation and maintainance of stp 3 mld capacity on sbr technology at moonak distt. sangrur for the period of 9 months 01.07.2024 to 31.03.2025
Read moreO and m 4 mld stps (sbr technology) at talwandi bhai for 12 months. (01.04.2025 to 31.03.2026)
O and m 4 mld stps (sbr technology) at talwandi bhai for 12 months. (01.04.2025 to 31.03.2026)
Read moreSurvey, soil testing, design,supply and const,install. commissioning of 15.00 mld capacity stp cum 30.00 kld fstp at kharar. operation and maintenance for a period of 60 months after stabilization period of 3 months or more.
Survey, soil testing, design,supply and const,install. commissioning of 15.00 mld capacity stp cum 30.00 kld fstp at kharar. operation and maintenance for a period of 60 months after stabilization period of 3 months or more.&#x0d &#x0d
Read moreOperation and maintenance of stp 4 mld capacity on sbr technology at lehragaga distt. sangrur for the year 2025-26. period 01.04.2025 to 31.03.2026 i.e. 12 months
Operation and maintenance of stp 4 mld capacity on sbr technology at lehragaga distt. sangrur for the year 2025-26. period 01.04.2025 to 31.03.2026 i.e. 12 months
Read moreO and m of 18 mld stp (sbr technology) at ferozepur, distt. ferozepur for 17 months (01.11.2025 to 31.03.2027)
O and m of 18 mld stp (sbr technology) at ferozepur, distt. ferozepur for 17 months (01.11.2025 to 31.03.2027)
Read moreConstruction, installation, commissioning of 1.00 mld stp at bbmb colony, ganguwal, distt. ropar based on conventional extended aeration treatment as per dnit including o and m for a period of 60 months after stabilization period of 3 months
Construction, installation, commissioning of 1.00 mld stp at bbmb colony, ganguwal, distt. ropar based on conventional extended aeration treatment as per dnit including o and m for a period of 60 months after stabilization period of 3 months
Read moreConst., install., commissioning of 15 mld stp at kharar town based on open technology includ. other appurtenant works on turnkey basis dnit, including oandm for a period 60 months after stabilization period of 3 months or including dewatering.
Const., install., commissioning of 15 mld stp at kharar town based on open technology includ. other appurtenant works on turnkey basis dnit, including oandm for a period 60 months after stabilization period of 3 months or including dewatering.
Read moreof your Industry type