Title
Remaining Balance Work Left By Spcl Kipl Jv As Per Scope Of Work For Commissioning Of 5 Mld Capacity Stp At Dhuri Based On Sbr Technology Including Operation And Maintenance For A Period Of 60 Months After Stabilization Period Of 3 Months Or More.
Description
Remaining Balance Work Left By Spcl Kipl Jv As Per Scope Of Work For Commissioning Of 5 Mld Capacity Stp At Dhuri Based On Sbr Technology Including Operation And Maintenance For A Period Of 60 Months After Stabilization Period Of 3 Months Or More.
Organisation Department of Local Government | State Govt. and UT
Tender Id 2025_DLG_144499_1
Reference
Number
BID NO.15(1) DATED 04.07.2025
Tender Fee 3360
EMD 7.86 Lakh
Tender Value -
Place Dhuri
Link
View Original Tender Notice

https://eproc.punjab.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=292371

Start Date July 11, 2025 14:30
End Date
Expired 31/07/2025

Expired 441 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Operation and maintenance of 15 mgd or 68.10 mld water treatment plant, and related cwr and 1600 kva substation including related 3 nos boosting stations and reservoir at durgapur municipal area for the period of 60 months includin

Operation and maintenance of 15 mgd or 68.10 mld water treatment plant, and related cwr and 1600 kva substation including related 3 nos boosting stations and reservoir at durgapur municipal area for the period of 60 months includin

Read more
Epc and performance run followed by o and m of stp of 50 mld capacity based on sbr technology at nevta including 3 months trial run and 1 year o and m and after with 10 years o and m for ward 65 66 67 bhankrota and surrounding nearby areas upto nevta

Epc and performance run followed by o and m of stp of 50 mld capacity based on sbr technology at nevta including 3 months trial run and 1 year o and m and after with 10 years o and m for ward 65 66 67 bhankrota and surrounding nearby areas upto nevta

Read more
Remaining balance work left by spcl-kipl jv as per scope of work for commissioning of 5 mld capacity stp at dhuri based on sbr technology including operation and maintenance for a period of 60 months after stabilization period of 3 months or more.

Remaining balance work left by spcl-kipl jv as per scope of work for commissioning of 5 mld capacity stp at dhuri based on sbr technology including operation and maintenance for a period of 60 months after stabilization period of 3 months or more.

Read more
Desilting of sewer manholes upto 300 mm dia various streets at dhuri district sangrur on double recovery basis on spcl kipl jv

Desilting of sewer manholes upto 300 mm dia various streets at dhuri district sangrur on double recovery basis on spcl kipl jv

Read more
Desilting of sewer manholes upto 300 mm dia various streets at sangrur district sangrur on double recovery basis on spcl kipl jv

Desilting of sewer manholes upto 300 mm dia various streets at sangrur district sangrur on double recovery basis on spcl kipl jv

Read more
Operation and maintainance of stp 3 mld capacity on sbr technology at moonak distt. sangrur for the period of 9 months 01.07.2024 to 31.03.2025

Operation and maintainance of stp 3 mld capacity on sbr technology at moonak distt. sangrur for the period of 9 months 01.07.2024 to 31.03.2025

Read more
O and m 4 mld stps (sbr technology) at talwandi bhai for 12 months. (01.04.2025 to 31.03.2026)

O and m 4 mld stps (sbr technology) at talwandi bhai for 12 months. (01.04.2025 to 31.03.2026)

Read more
Survey, soil testing, design,supply and const,install. commissioning of 15.00 mld capacity stp cum 30.00 kld fstp at kharar. operation and maintenance for a period of 60 months after stabilization period of 3 months or more.

Survey, soil testing, design,supply and const,install. commissioning of 15.00 mld capacity stp cum 30.00 kld fstp at kharar. operation and maintenance for a period of 60 months after stabilization period of 3 months or more.&amp#x0d &amp#x0d

Read more
Operation and maintenance of stp 4 mld capacity on sbr technology at lehragaga distt. sangrur for the year 2025-26. period 01.04.2025 to 31.03.2026 i.e. 12 months

Operation and maintenance of stp 4 mld capacity on sbr technology at lehragaga distt. sangrur for the year 2025-26. period 01.04.2025 to 31.03.2026 i.e. 12 months

Read more
O and m of 18 mld stp (sbr technology) at ferozepur, distt. ferozepur for 17 months (01.11.2025 to 31.03.2027)

O and m of 18 mld stp (sbr technology) at ferozepur, distt. ferozepur for 17 months (01.11.2025 to 31.03.2027)

Read more