Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Ttps Mech Ii Ahp Unit Iv Attending Break Down Maintenance Of Aph Eco Hopper Equipments Sea Water Pipe Line And Valves In Unit Iv For The Period From 01 04 2026 To 31 03 2027
|
| Description |
Ttps Mech Ii Ahp Unit Iv Attending Break Down Maintenance Of Aph Eco Hopper Equipments Sea Water Pipe Line And Valves In Unit Iv For The Period From 01 04 2026 To 31 03 2027
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2025_EB_633859_1 |
|
Reference Number |
CE/TTPS/SE/M-II/No.34/2026-27 |
| Tender Fee | 0 |
| EMD | 11700 |
| Tender Value | - |
| Place | TTPS |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=758427 |
| Start Date | December 18, 2025 19:30 |
| End Date |
Expired
03/01/2026
Expired 288 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Ttps mechii ahp unitiii rubber lining of ms pipes and fittings in sea water booster pump and ash water pumps during the forthcoming annual overhaul
Ttps mechii ahp unitiii rubber lining of ms pipes and fittings in sea water booster pump and ash water pumps during the forthcoming annual overhaul
Read moreTtps mechii ahp unit iii cleaning of ash slurry sluice sump of unit iii during the forthcoming annual overhaul
Ttps mechii ahp unit iii cleaning of ash slurry sluice sump of unit iii during the forthcoming annual overhaul
Read moreTtps mechii ahp dismantling the existing wornout ms structural supports fabrication and erection of newly fabricated m.s. structural platform near jt3 in ash slurry disposal lines in unit iv v
Ttps mechii ahp dismantling the existing wornout ms structural supports fabrication and erection of newly fabricated m.s. structural platform near jt3 in ash slurry disposal lines in unit iv v
Read moreTtps mechii tm ii unit iv overhauling of boiler feed pumps and deaerator system during annual overhaul 2026 27
Ttps mechii tm ii unit iv overhauling of boiler feed pumps and deaerator system during annual overhaul 2026 27
Read moreTtps mechii ahp ash slurry disposal lines of unit iv v scrapping removal of ash slag under the culverts near unit iv v entrance 457 5 e road crossing and cleaning of pipes in all ash slurry disposal lines
Ttps mechii ahp ash slurry disposal lines of unit iv v scrapping removal of ash slag under the culverts near unit iv v entrance 457 5 e road crossing and cleaning of pipes in all ash slurry disposal lines
Read moreTtps operation circle cad d.g.set iv and v attending minor repair works during overhauling of unit iv and v
Ttps operation circle cad d.g.set iv and v attending minor repair works during overhauling of unit iv and v
Read moreTtps mechii ahp uniti ii iii ash slurry pump house removing of worn out internals of seal water pump parts machining and fixing of new internals
Ttps mechii ahp uniti ii iii ash slurry pump house removing of worn out internals of seal water pump parts machining and fixing of new internals
Read moreTtps operation circle mpm ii unit iv attending repair works in journal door assembly and mill body of mills
Ttps operation circle mpm ii unit iv attending repair works in journal door assembly and mill body of mills
Read moreTtps operation circle cad unit iv and v annual overhaul overhauling of nrvs in sea water booster pumps and auxiliary cooling water pumps of a.c.w system iv and v
Ttps operation circle cad unit iv and v annual overhaul overhauling of nrvs in sea water booster pumps and auxiliary cooling water pumps of a.c.w system iv and v
Read moreTtps mechii tm ii unit iv inspection and rectification of epoxy cladding over the condenser water box and tube sheet east and west and rebuild the cladding with special epoxy putties ie average 4 5mm thick to be built up in the peeled off area of
Ttps mechii tm ii unit iv inspection and rectification of epoxy cladding over the condenser water box and tube sheet east and west and rebuild the cladding with special epoxy putties ie average 4 5mm thick to be built up in the peeled off area of
Read moreof your Industry type