Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Const And Maintenance Of Road L023 Link From Naristan To Wantnod Road Km 1st Rd 75m To Mugaduggin, Complete, Pkg No Jk10 4005, Length 3.0 Km, Carriage Way Width 3.75m Under Pmgsy Iv, Batch I, Fy 2025 26, Block Aripal Pmgsy Division Pulwama
|
| Description |
Refer To Boq
|
| Organisation | National Rural Roads Development Agency (NRRDA) | Central Govt. Ministry/Department |
| Tender Id | 2025_KSRRD_143752_1 |
|
Reference Number |
JK104005 |
| Tender Fee | 10000 |
| EMD | 12 Lakh |
| Tender Value | |
| Place | Aripal Pulwama |
| Link |
View Original Tender Notice
https://pmgsytendersjk.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=222970 |
| Start Date | August 15, 2025 14:30 |
| End Date |
Expired
30/08/2025
Expired 307 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Const and maintenance of road l024-link from gulistan pranigam road end point to ropsisaran, new, stage complete, pkg no jk10-4001, length 2.94 km, carriage way width- 3.75m, pmgsy iv, batch i, 2025-26, block aripal piu pulwama
Refer to boq
Read moreConst and maintenance of road l021-link from l077-lorh gam to dodkulan road km 5th rd800m to kulpadan, new, complete, pkg no jk10-4002, length 2.30 km, carriage way width- 3.75m under pmgsy iv, batch i, 2025-26, aripal, piu pulwama
Refer to boq
Read moreConst and maintenance of road l022-link from l073 jawhaipora laam to zazbal road km 1st rd 320m to soiner, new, stage complete, pkg no jk10-4003, length 1.50 km, carriage way width- 3.75m under pmgsy iv, batch i, 2025-26, block aripal piu pulwama
Refer to boq
Read moreConst and maintenance of road l028-link from tral bathnoor karmulla road km6th rd200m to shutlaun, new, stage complete,pkg no jk10-4016, length 2.60 km, carriage way width- 3.75m pmgsy iv, batch i, fy 2025-26,block tral, piu pulwama
Refer to boq
Read moreConst and maintenance of road l022-link from kellar abhama sangerwani road km12thrd700 to bangren abhama, new, stage complete, pkg no jk10-4023, length 1.62 km, carriage way width- 3.75m under pmgsy iv, batch i, 2025-26, ichegoza, piu pulwama
Refer to boq
Read moreConst. and maintenance of road l021-ujroo to manzmoh km 4th rd 200 to seermarg, new, waste plastic , complete, pkg no jk01-4005, length 2.0 km, carriage way width- 3.75m under pmgsy iv, batch i, f.y 2025-26, block - hiller shahabad, piu kulgam
Refer to boq
Read moreConstruction and maintenance of road from l023 link from gatipora kathauhalan road km 1st rd 300 m to sainimarg, jk22-4002, length 3.10 km, stage complete, pmgsy-iv (batch-i, 2025-26), pmgsy division pulwama
Construction and maintenance of road from l023 link from gatipora kathauhalan road km 1st rd 300 m to sainimarg, jk22-4002, length 3.10 km, stage complete, pmgsy-iv (batch-i, 2025-26), pmgsy division pulwama
Read moreConst and maint of road l022-link from l067-kathohalan to nagbal b road end point to gulabjadi, new, stage const. complete, waste plastic, pkg no jk22-4001, length 3.0 km, carriage way width- 3.75m under pmgsy iv batch-i, 2025-26, keller, piu pulwama
Refer to boq
Read moreConstruction and maintenance of road from l025 link from tral naristan road km 5th rd 200 to bangidar dragud gutroo gb, (waste plastic technology), jk10-4004 length 4.00 km, stage complete, pmgsy-iv (batch-i, 2025-26), pmgsy division pulwama
Construction and maintenance of road from l025 link from tral naristan road km 5th rd 200 to bangidar dragud gutroo gb, (waste plastic technology), jk10-4004 length 4.00 km, stage complete, pmgsy-iv (batch-i, 2025-26), pmgsy division pulwama
Read moreConstruction and maintenance of road from l023 link from bathnoor karmulla road end point to bugmud, (waste plastic technology), jk10-4013, length 4.00 km, stage complete, pmgsy-iv (batch-i, 2025-26), pmgsy division pulwama.
Construction and maintenance of road from l023 link from bathnoor karmulla road end point to bugmud, (waste plastic technology), jk10-4013, length 4.00 km, stage complete, pmgsy-iv (batch-i, 2025-26), pmgsy division pulwama.
Read moreof your Industry type