Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
1300036590 Desk Top Caller Id Telephone Instrument
|
| Description |
|
| Organisation | Materials Department | Ministry of Petroleum and Natural Gas |
| Tender Id | GEM/2024/B/5223903 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | July 30, 2024 16:32 |
| End Date |
Expired
20/08/2024
Expired 782 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
OFFICE PLUS LIMITED
480000
Technical Evaluation Results
| S.No. | Seller Name | Offered Item | Participated On | MSE/MII Status | Status |
|---|---|---|---|---|---|
| 1 | A B ENTERPRISES | Make : BEETEL Model : BEETEL G30 Title : TELEPHONE WITH CLI AND SPK | 19-08-2024 16:34:14 | N/A | Disqualified |
| 2 | DHARSHAN SWITCHGEARS | Make : BEETEL/REPUTED Model : M60N Title : DESKTOP CALLER ID TELEPHONE | 20-08-2024 12:54:28 | N/A | Qualified |
| 3 | INDUSTRIAL AND TRADE LINKS | Make : COILED CORD Model : COILED CORD Title : COILED CORD | 17-08-2024 14:53:48 | N/A | Disqualified |
| 4 | KRISHNA MARKETING | Make : HOLA Model : HOLA TF700 Title : HOLA TF700 SPK AND CLI PHONE | 20-08-2024 09:49:13 | N/A | Disqualified |
| 5 | MANOJ ELECTRICALS | Make : NA Model : TELEPHONE Title : TELEPHONE | 20-08-2024 14:48:41 | MSE | Disqualified |
| 6 | MITTAL INDUSTRIES | Make : LEX STAR Model : LX615 Title : PUSH BUTTON TELEPHONE | 19-08-2024 14:11:39 | N/A | Disqualified |
| 7 | OFFICE PLUS LIMITED | Make : Panasonic Model : KX-TS402 Title : PANASONIC LANDLINE CORDED PHONE KX-TS402 | 05-08-2024 13:19:44 | N/A | Qualified |
| 8 | PARTH ENERGY SYSTEMS PRIVATE LIMITED | Make : BEETEL Model : M53N Title : 1300036590 DESK TOP CALLER ID TELEPHONE INSTRUMENT | 19-08-2024 11:26:10 | MSE | Disqualified |
| 9 | UNITY TELECOM | Make : Beetel Model : Beetel M59 Title : BEETEL M59 DESK TOP CALLER ID TELEPHONE INSTRUMENT | 06-08-2024 17:28:29 | N/A | Disqualified |
Financial Evaluation Results
| S.No. | Seller Name | Offered Item | Total Price | Rank |
|---|---|---|---|---|
| 1 | OFFICE PLUS LIMITED | Item Categories : 1300036590 DESK TOP CALLER ID TELEPHONE INSTRUMENT | 483000.00 | L1 |
| 2 | DHARSHAN SWITCHGEARS | Item Categories : 1300036590 DESK TOP CALLER ID TELEPHONE INSTRUMENT | 737500.00 | L2 |
Ordered Items & Contract Pricing
| Product | Brand | Model | Ordered Quantity | Price |
|---|---|---|---|---|
| PANASONIC LANDLINE CORDED PHONE KX-TS402 | Panasonic | KX-TS402 | 500 | ₹ 480000.000 |
Procurement of telephone jelly filled cables, junction boxes, telephone instruments, pri card and laying of cables at gdkcm (no.2, 2a and 5), rg-i area
Procurement of telephone jelly filled cables, junction boxes, telephone instruments, pri card and laying of cables at gdkcm (no.2, 2a and 5), rg-i area
Read moreRoof top rain water harvesting work for type-3 houses in chitrakoot district
Roof top rain water harvesting work for type-3 houses in chitrakoot district
Read moreConstruction of lawyer's hall building in civil court campus, gopalganj (with electrical) tender id -140827
Construction of lawyer's hall building in civil court campus, gopalganj (with electrical) tender id -140827
Read moreProcurement of stainless steel ball valve 20 mm and 25mm id vinylcorrg flex hose for use at chp, rgoc3.
Procurement of stainless steel ball valve 20 mm and 25mm id vinylcorrg flex hose for use at chp, rgoc3.
Read moreProcurement of 100 nb ms pipes to replace damaged bracing pipes in both unit boiler ducts (aph, esp and id fan inlet/outlet ducts) in aoh at stpp, jaipur, mancherial, telangana
Procurement of 100 nb ms pipes to replace damaged bracing pipes in both unit boiler ducts (aph, esp and id fan inlet/outlet ducts) in aoh at stpp, jaipur, mancherial, telangana
Read moreOn-site resin grouting work for slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing
On-site resin grouting work for slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing
Read moreOn-site laser measurement work on slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing
On-site laser measurement work on slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing
Read moreDrilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.
Read moreof your Industry type