Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Strengthening The Existing Erode Pugalur 110 Kv Sc Line On Sc Towers With Dog Leopard Conductor Into 110 Kv Dc Line On Dc Towers From Loc. 1 To 17
|
Description |
Strengthening The Existing Erode Pugalur 110 Kv Sc Line On Sc Towers With Dog Leopard Conductor Into 110 Kv Dc Line On Dc Towers From Loc. 1 To 17
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2024_EB_427607_1 |
Reference Number |
CE/TP-II/TRY/C-29/23-24 |
Tender Fee | 0 |
EMD | 2.9 Lakh |
Tender Value | |
Place | ERODE |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=508433 |
Start Date | February 20, 2024 16:00 |
End Date |
05/03/2024 ( Expired 491 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Earthwork excavation stub setting concreting supply transport and erection of towers stringing of conductor and earth wire for introduction of 2 nos kco tower in 110 kv sc line on dc tower in the existing sethiyathope 110 kv ss.
Earthwork excavation stub setting concreting supply transport and erection of towers stringing of conductor and earth wire for introduction of 2 nos kco tower in 110 kv sc line on dc tower in the existing sethiyathope 110 kv ss.
Read moreShifting of 132kv dcds nimrani manawar dhamnod line from loc. no. 17 to 26 passing through the plot no. i-1, 2, 3 at ia jetapur-palasiya, tehsil dhamnod, distt. dhar m.p.
Shifting of 132kv dcds nimrani manawar dhamnod line from loc. no. 17 to 26 passing through the plot no. i-1, 2, 3 at ia jetapur-palasiya, tehsil dhamnod, distt. dhar m.p.
Read moreConstruction of 2 nos of 220 kv bays at 400kv gss alwar (ppp) for termination already approved 220 kv dc line from under construction 220 kv gss sikri to 400 kv gss alwar (ppp) including survey, supply and etc on turnkey basis under bn-9018002512
Construction of 2 nos of 220 kv bays at 400kv gss alwar (ppp) for termination already approved 220 kv dc line from under construction 220 kv gss sikri to 400 kv gss alwar (ppp) including survey, supply and etc on turnkey basis under bn-9018002512
Read moreErection of 1 km 33 kv s/c line with acsr dog conductor t-off from 33 kv kuchari feeder from 132 kv chhatrel alongwith 8 km 11 kv ic work and 33 kv sub station at poonam nagar hubar under aen rural jdvvnl jaisalmer
Erection of 1 km 33 kv s/c line with acsr dog conductor t-off from 33 kv kuchari feeder from 132 kv chhatrel alongwith 8 km 11 kv ic work and 33 kv sub station at poonam nagar hubar under aen rural jdvvnl jaisalmer
Read moreReplacement of old damaged 150/100mmdia ci water supply line with 150mmdia di water supply line from h.no.13-11-115/1 to h.no.13-11-152 and making junction on 350mmdia di water supply line to avoid chronic contaminated water supply at new gaddiannaram under dilsukhnagar section,sd-i,o and m divn-x.(reserved for st category)
Replacement of old damaged 150/100mmdia ci water supply line with 150mmdia di water supply line from h.no.13-11-115/1 to h.no.13-11-152 and making junction on 350mmdia di water supply line to avoid chronic contaminated water supply at new gaddiannaram under dilsukhnagar section,sd-i,o and m divn-x (reserved for st category).
Read moreStrengthening of existing stretch from km 101/880 to 105/300 of nh-167bg inkavali town along with one-time improvement of bypassed stretch of jaladanki town from km 91/770 to 94/300 on epc mode in spsr nellore district in the state of andhra pradesh
Strengthening of existing stretch from km 101/880 to 105/300 of nh-167bg inkavali town along with one-time improvement of bypassed stretch of jaladanki town from km 91/770 to 94/300 on epc mode in spsr nellore district in the state of andhra pradesh
Read moreLabour work contract for erection of 1 no. new 33kv mappedu feeder with 33kv line stringing of 14.2km htoh line and 1.5km htug cable work from 110kv papparambakkam ss to existing 33kv mappedu ss in respect of mannur section of sriperumbudur division
Labour work contract for erection of 1 no. new 33kv mappedu feeder with 33kv line stringing of 14.2km htoh line and 1.5km htug cable work from 110kv paparambakkam ss to existing 33kv mappedu ss in respect of mannur section of sriperumbudur division
Read moreShifting of 11 kv line on 9 mtr lonf st poles from lamso sankdoo and interconnection with existing network and various capcity dtrs in shakar chicktan under sdp 2025-26 within the jurisdiction of electric distribution division kargil.
Shifting of 11 kv line on 9 mtr lonf st poles from lamso sankdoo and &#x0d interconnection with existing network and various capcity dtrs in shakar &#x0d chicktan under sdp 2025-26 within the jurisdiction of electric distribution &#x0d division kargil.
Read moreDnit for laying of tower foundations,erection of towers,stringing and sagging of conductor for 220 kv line from 400 kv nakodar to railway traction sub station nakodar 2 phase railway supply (contributory work)
Dnit for laying of tower foundations,erection of towers,stringing and sagging of conductor for 220 kv line from 400 kv nakodar to railway traction sub station nakodar 2 phase railway supply (contributory work)
Read moreReplacement of existing sewer line with 200mm dia swg main line from h.no.9-107 to 9-104 and h.no.9-108 and 9-76, 9-118/1, venkateswara nagar under 139 ward, chanikyapuri section, sd-iii, om divn.no.xiii.
Replacement of existing sewer line with 200mm dia swg main line from h.no.9-107 to 9-104 and h.no.9-108 and 9-76, 9-118/1, venkateswara nagar under 139 ward, chanikyapuri section, sd-iii, o and m divn.no.xiii.
Read moreof your Industry type