Tender Details

Particulars Details
Title
Improvement To Kondur To Malegaon Road Km 0/750 To 3/000 Vr 106 Tq. Hadgaon
Description
Improvement To Kondur To Malegaon Road Km 0/750 To 3/000 Vr 106 Tq. Hadgaon.
Organisation Government of Maharashtra
Tender Id 2023_NANDE_908908_16
Reference
Number
ZPN/WD/Bhokar/e.TEN 1/ OPEN/23-24
Tender Fee 1180
EMD 1 Lakh
Tender Value
Place EEZPBHOKAR
Link https://mahatenders.gov.in
Start Date June 23, 2023 17:30
End Date

30/06/2023 ( Expired 710 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Consultancy services for authoritys engineer for supervision of construction of road from lada sarli section of frontier highway nh-913 lada to bameng 0 000 to 43 65 43 65 km

Consultancy services for authoritys engineer for supervision of construction of road from lada sarli section of frontier highway nh-913 lada to bameng 0 000 to 43 65 43 65 km

Read more
Construction and up- gradation to two lane with paved shoulder in km 105.330 to 112.500 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-3) in the state of chhattisgarh.

Construction and up- gradation to two lane with paved shoulder in km 105.330 to 112.500 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-3) in the state of chhattisgarh.

Read more
Consultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode

Consultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode

Read more
Rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to two lane with paved shoulders in the state of madhya pradesh on epc mode.

Rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to two lane with paved shoulders in the state of madhya pradesh on epc mode.

Read more
Independent engineer services for upgradation of existing road to 2l with ps for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh 539) in the state of madhya pradesh on hybrid annuity mode

Independent engineer services for upgradation of existing road to 2l with ps for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh 539) in the state of madhya pradesh on hybrid annuity mode.

Read more
Construction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode

Construction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode

Read more
Maintenance work from km 0/000 to km 49/985 (length 49.985 km) dhar to gujri section section of nh-347c under short term maintenance contract in the state of madhya pradesh

Maintenance work from km 0/000 to km 49/985 (length 49.985 km) dhar to gujri section section of nh-347c under short term maintenance contract in the state of madhya pradesh

Read more
Maintenance work from km 34/560 to km 36/000 (length 1.44 km) anjad thikri road section of nh 347b under short term maintenance contract in the state of madhya pradesh

Maintenance work from km 34/560 to km 36/000 (length 1.44 km) anjad thikri road section of nh 347b under short term maintenance contract in the state of madhya pradesh

Read more
Annual surfacing on link road to village khatnol km. 0/00 to 10/000

Providing and laying 25 mm thick bituminous concrete along with providing and laying of hot applied thermoplastic compound 2.50 mm thick for edge line in between km. 8/00 to 9/00 ) add. kms. under amp 2025-26- village road

Read more
Widening and improvements from ml to dual two lane divided carriageway with paved shoulder at km 90/0-92/900 of thoppur- mettur -bhavani -erode road (sh-20) including construction of storm water drain and construction of additional high level bridge

Widening and improvements from ml to dual two lane divided carriageway with paved shoulder at km 90/0-92/900 of thoppur- mettur -bhavani -erode road (sh-20) including construction of storm water drain and construction of additional high level bridge

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise