Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Design, Supply And Construction Of 500 Seater Hostel G Plus 2 Using Precast Lgsf Technology In Iit Ropar On Epc Turnkey Basis
|
Description |
Design, Supply And Construction Of 500 Seater Hostel G Plus 2 Using Precast Lgsf Technology In Iit Ropar On Epc Turnkey Basis
|
Organisation | Indian Institute of Technology Ropar | Central Govt. Ministry/Department |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 590 |
EMD | 40 Lakh |
Tender Value | |
Place | IIT Ropar |
Link |
AAAAAAAAAA Login to view |
Start Date | June 23, 2025 15:30 |
End Date |
07/07/2025 ( 7 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Consultancy services for authoritys engineer for supervision of construction of 4 lane with ps idar-badoli bypass section from design chainage km 81.300 to 95.500 of nh-168g in the state of gujarat ,total length 14.2 km, on epc mode
Consultancy services for authoritys engineer for supervision of construction of 4 lane with ps idar-badoli bypass section from design chainage km 81.300 to 95.500 of nh-168g in the state of gujarat ,total length 14.2 km, on epc mode
Read moreRehabilitation and upgradation of patur-balapur-shegaon section of nh-161g from design km 0-000 to km 33-200 and design km 36-600 to km 53-090 (total length-49.600 km) to 4lps configuration in the state of maharashtra on epc mode
Rehabilitation and upgradation of patur-balapur-shegaon section of nh-161g from design km 0-000 to km 33-200 and design km 36-600 to km 53-090 (total length-49.600 km) to 4lps configuration in the state of maharashtra on epc mode
Read moreConstruction of two lane with paved shoulder from design km 45.325 (ex km 48.870) near basinda village to design km 90.010 (ex km 97.903) near roshni village section of nh-347b of betul-khandwa package-2 in the state of madhya on ham
Construction of two lane with paved shoulder from design km 45.325 (ex km 48.870) near basinda village to design km 90.010 (ex km 97.903) near roshni village section of nh-347b of betul-khandwa package-2 in the state of madhya on ham
Read moreSupply, installation, testing and commissioning of digital subtraction angiography system (single plane cardio vascular catheterization and digital subtraction angiography laboratory high end 3d) 01 no. on turnkey and buy-back basis for the departme
Supply, installation, testing and commissioning of digital subtraction angiography system (single plane cardio vascular catheterization and digital subtraction angiography laboratory high end 3d) 01 no. on turnkey and buy-back basis for the departme
Read moreUpgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to two lane with paved shoulder configuration in the state of madhya pradesh on epc mode
Upgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to two lane with paved shoulder configuration in the state of madhya pradesh on epc mode
Read moreDesign, construction, supply, installation and commissioning of package type sewerage treatment plant (based on mbr technology) within power plant area of chandrapura thermal power station on epc basis
Design, construction, supply, installation and commissioning of package type sewerage treatment plant (based on mbr technology) within power plant area of chandrapura thermal power station on epc basis
Read moreDesign, supply, install, test and commission innovative and immersive 3d projection mapping at thirumalai nayakkar mahal, madurai (package-2) with operations and maintenance for a period of 10 years on ppp basis
Design, supply, install, test and commission innovative and immersive 3d projection mapping at thirumalai nayakkar mahal, madurai (package-2) with operations and maintenance for a period of 10 years on ppp basis
Read moreDesign, supply, install, test and commission innovative and immersive 3d projection mapping s at ooty lake and yercaud lake (package-1) with operations and maintenance for a period of 10 years on ppp basis
Design, supply, install, test and commission innovative and immersive 3d projection mapping s at ooty lake and yercaud lake (package-1) with operations and maintenance for a period of 10 years on ppp basis
Read more2 and 4 lanning of damoh jabalpur (pkg1) section of nh34 from km. 0.000 to 43.500 under nh (o) in the state of madhya pradesh on epc mode
2 and 4 lanning of damoh jabalpur (pkg1) section of nh34 from km. 0.000 to 43.500 under nh (o) in the state of madhya pradesh on epc mode
Read moreTr-13-2025 construction of various 132kv and 33kv works at 400kv substation ujjain (tajpur) on turnkey basis.
Tr-13-2025 construction of various 132kv and 33kv works at 400kv substation ujjain tajpur on turnkey basis.
Read moreof your Industry type