Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Maintenance Of Bottom Floor And Side Wall Upto 3mtr. Height Of Rcc Chimney 1 And 2 By Water Washing For The Period From 01.04.2025 To 31.03.2026
|
Description |
Maintenance Of Bottom Floor And Side Wall Upto 3mtr. Height Of&Amp#X0d
Rcc Chimney 1 And 2 By Water Washing For The Period From 01.04.2025 To 31.03.2026
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2025_EB_530846_1 |
Reference Number |
CE SE C TTPS Spec. No 43 25 26 |
Tender Fee | 0 |
EMD | 5800 |
Tender Value | |
Place | TTPS |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=631946 |
Start Date | March 08, 2025 00:25 |
End Date |
14/03/2025 ( Expired 108 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
1.civil works for creating storage facility to stack cable material,other electrical materials in between 132kv switchyard and mtdd lab and floor repairing 2.closing the chambers at corridor area of old building at ipr campus,bhat, gandhinagar382428
1.civil works for creating storage facility to stack cable material,other electrical materials in between 132kv switchyard and mtdd lab and floor repairing 2.closing the chambers at corridor area of old building at ipr campus,bhat, gandhinagar382428
Read moreAppointment of issuing bank for a letter of credit
Invitation to act as issuing bank for an aggregate/portfolio letter of credit (lc) to cover three sub-projects, such lc backstopped by a guarantee from the international bank for reconstruction and development (ibrd) to support the sngrbp
Read moreHiring of 1 no. of 12kl water tanker with water spraying arrangement for use at mngoc with 24 hours availability and 1500 kms per month for a period of 2 years - reg.
Hiring of 1 no. of 12kl water tanker with water spraying arrangement for use at mngoc with 24 hours availability and 1500 kms per month for a period of 2 years - reg.
Read moreS/r of l/r patiala nabha road to ajnouda kalan upto mc limit length 6.40 km group no. 9 under s/r scheme 2022-23, 2023-24 and 2024-25. including maintenance for 5 year (1st year defect liability period and 2nd to 5th year maintenance)
S/r of l/r patiala nabha road to ajnouda kalan upto mc limit length 6.40 km group no. 9 under s/r scheme 2022-23, 2023-24 and 2024-25. including maintenance for 5 year (1st year defect liability period and 2nd to 5th year maintenance)
Read moreAnnual repairs and maintenance of sewer line network (for 2 years) by mechanical means in sector - r3, r4, r5 at r and r pocket no.1, sector - r1, r2 at r and r pocket no.2 and sector - 1 at r and r pocket no.3 of pushpak node, navi mumbai.
Annual repairs and maintenance of sewer line network (for 2 years) by mechanical means in sector - r3, r4, r5 at r,r pocket no.1, sector - r1,r2 at r and r pocket no.2&#x0d and sector - 1 at r and r pocket no.3 of pushpak node, navi&#x0d mumbai.
Read more(nib_07) work of improvement in drinking water supply of 11 villages of pali and 2 villages of rani by connecting them to gundoj off take through sodawas filter plant under mla constituency sumerpur including 5 year o and m after 1 year defect liabil
(nib_07) work of improvement in drinking water supply of 11 villages of pali and 2 villages of rani by connecting them to gundoj off take through sodawas filter plant under mla constituency sumerpur including 5 year o and m after 1 year defect liabil
Read moreIndependent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)
Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)
Read moreUpgradation of bathinda talwandi sabo road to nutt upto pmgsy road rd 0 point 00 to 6 point 80 km bodr 42 including maintenance of road for 5 year in 1 year defect liability period and 4 year maintenance period
Upgradation of bathinda talwandi sabo road to nutt upto pmgsy road rd 0 point 00 to 6 point 80 km bodr 42 including maintenance of road for 5 year in which 1 year defect liability period and 4 year maintenance period
Read moreUpgradation of bathinda dabwali road nh 64 to refinery phullokhari rd 16 point 80 to 17 point 88 km with maintenance of road for 5 years in which 1 year defect liabillity period and 4 years maintenance period
Upgradation of bathinda dabwali road nh 64 to refinery phullokhari rd 16 point 80 to 17 point 88 km with maintenance of road for 5 years in which 1 year defect liabillity period and 4 years maintenance period
Read moreProvn of defi sockets in otm accn bldg no. 37, 39, 40, 91 and 100, addn/ altn boundary wall for offrs mess ogb-26 of 2 sikh at river side road special repair to bldg e-1 per cook house at b block of base hosp barrrackpore under ge barrackpore
Provn of defi sockets in otm accn bldg no. 37, 39, 40, 91 and 100, addn/ altn boundary wall for offrs mess ogb-26 of 2 sikh at river side road special repair to bldg e-1 per cook house at b block of base hosp barrrackpore under ge barrackpore
Read moreof your Industry type