Tender Details

Particulars Details
Title
Maintenance Of Bottom Floor And Side Wall Upto 3mtr. Height Of Rcc Chimney 1 And 2 By Water Washing For The Period From 01.04.2025 To 31.03.2026
Description
Maintenance Of Bottom Floor And Side Wall Upto 3mtr. Height Of&Amp#X0d Rcc Chimney 1 And 2 By Water Washing For The Period From 01.04.2025 To 31.03.2026
Organisation TNEB Limited | State Govt. and UT
Tender Id 2025_EB_530846_1
Reference
Number
CE SE C TTPS Spec. No 43 25 26
Tender Fee 0
EMD 5800
Tender Value
Place TTPS
Link https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=631946
Start Date March 08, 2025 00:25
End Date

14/03/2025 ( Expired 87 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Appointment of issuing bank for a letter of credit

Invitation to act as issuing bank for an aggregate/portfolio letter of credit (lc) to cover three sub-projects, such lc backstopped by a guarantee from the international bank for reconstruction and development (ibrd) to support the sngrbp

Read more
Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)

Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)

Read more
Consultancy services as ie during o and m period for the project two laning with paved shoulders of aligarh-moradabad section of nh-509 from km. 79.000 to km.232.020 in the state of uttar pradesh on performance -based maintenance contract (pbmc)

Consultancy services as ie during o and m period for the project two laning with paved shoulders of aligarh-moradabad section of nh-509 from km. 79.000 to km.232.020 in the state of uttar pradesh on performance -based maintenance contract (pbmc)

Read more
Construction of underground s/s for town planning scheme (t.p.1, 2, 3 and 4) of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years

Construction of underground s/s for town planning scheme (t.p.1, 2, 3 and 4) of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years

Read more
Implementation of 24x7 w/s project for town planning scheme (t.p. 1, 2, 3 and 4) under jurisdiction of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years

Implementation of 24x7 w/s project for town planning scheme (t.p. 1, 2, 3 and 4) under jurisdiction of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years

Read more
Zone no. 01, ward no. 04, at khaira purani basti (1) construction of rcc drain and toplayer cement concrete road form satish rawat ji house to rajkumar yadav ji house, (2) construction of rcc drain and wbm road from sanchi road to rajendra saket ji..

Zone no. 01, ward no. 04, at khaira purani basti (1) construction of rcc drain and toplayer cement concrete road form satish rawat ji house to rajkumar yadav ji house, (2) construction of rcc drain and wbm road from sanchi road to rajendra saket ji..

Read more
Jal jeevan mission kulakkada - phase ii - design, construction, commissioning and maintenance for a period of two years from the date of commissioning 3mld water treatment plant in the compound of existing water treatment plant at kulakkada using pla

Jal jeevan mission kulakkada - phase ii - design, construction, commissioning and maintenance for a period of two years from the date of commissioning 3mld water treatment plant in the compound of existing water treatment plant at kulakkada using pla

Read more
Construction work of rcc drain and culvert in rupapur colony from honda room located on prayagraj road to rajesh vermas house for strengthening the water supply system in pratapgarh district under infrastructure fund.

Construction work of rcc drain and culvert in rupapur colony from honda room located on prayagraj road to rajesh vermas house for strengthening the water supply system in pratapgarh district under infrastructure fund.

Read more
Upgradation of muktsar-abohar road via panniwala (mktodr-32) rd 0.00-19.20, 28.00-37.70 equal to 28.90 km including maintenance of road for 3 year (1 year defect liability period plus 2 year maintenance period)

Upgradation of muktsar-abohar road via panniwala (mktodr-32) rd 0.00-19.20, 28.00-37.70 equal to 28.90 km including maintenance of road for 3 year (1 year defect liability period plus 2 year maintenance period)

Read more
Annual rate contract for undertaking clean and dirty air flow tests for pulverizes of unit 1 to 5, bktpp for a period of 2 years.

Annual rate contract for undertaking clean and dirty air flow tests for pulverizes of unit 1 to 5, bktpp for a period of 2 years.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise