Tender Details

Particulars Details
Title
Removal Of Mulba Boulders From Time To Time From The Sump Of Spill Channel Chep Ii
Description
Same As Per Enit
Organisation Government of Jammu and Kashmir
Tender Id 2023_SPDC_230897_3
Reference
Number
ENIT 08 of 2023-24
Tender Fee 200
EMD 3400
Tender Value -
Place Office of the Executive Engineer CMD PDC Udhampur
Link
View Original Tender Notice

https://jktenders.gov.in

Start Date September 25, 2023 18:30
End Date
Expired 16/10/2023

Expired 1095 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Removal of hard patch in approach channel at nmp

Removal of hard patch in approach channel at nmp

Read more
Sale of excavated hard rock from excavation of approach channel, spill channel, cot, chute fall, of fatehpur tank construction site as is where is basis.

Sale of excavated hard rock from excavation of approach channel, spill channel, cot, chute fall, of fatehpur tank construction site as is where is basis.

Read more
Custom bid for services - rprc266397-online robotic cleaning of process cooling tower sump & cold water channel at panipat refinery

Custom bid for services - rprc266397-online robotic cleaning of process cooling tower sump & cold water channel at panipat refinery

Read more
General cleaning/debris clearing, washing of dock floors, gutter floor channel mud cleaning and dry dock sump mud cleaning for ship repair complex

General cleaning/debris clearing, washing of dock floors, gutter floor channel mud cleaning and dry dock sump mud cleaning for ship repair complex

Read more
Custom bid for services - hiring a marine multipurpose vessel/ boat for a period of three years for collection of floating garbage from jnpa navigational channel, lagoon, creek area, capable of oil spill containment, recovery and mitigation

Custom bid for services - hiring a marine multipurpose vessel/ boat for a period of three years for collection of floating garbage from jnpa navigational channel, lagoon, creek area, capable of oil spill containment, recovery and mitigation

Read more
Ttps operation circle cad cwph i unit iii annual overhauling of tw screen 3a to 3d complete silt removal from pump suction end to tw screen channel entry gate for the year 2026 to 2027

Ttps operation circle cad cwph i unit iii annual overhauling of tw screen 3a to 3d complete silt removal from pump suction end to tw screen channel entry gate for the year 2026 to 2027

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Read more
Cremoval of mulba boulders from time to time from the sump of spill channel chep-ii.

Removal of mulba boulders from time to time from the sump of spill channel chep-ii.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise