Tender Details
Particulars | Details |
---|---|
Title |
Repair Of Smp Iv Weighbridge Loadcell Foundation Rcc Pillar
|
Description |
Repair Of Smp Iv Weighbridge Loadcell Foundation Rcc Pillar
|
Organisation | Indian Rare Earths Limited | Central Govt. Ministry/Department |
Tender Id | 2024_IRELD_760527_1 |
Reference Number |
GEM/2024/B/5050642 Dated-17/06/2024 |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | IREL(India)Limited, OSCOM, Matikhalo |
Link | https://eprocure.gov.in/epublish/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1064051 |
Start Date | June 17, 2024 20:30 |
End Date |
08/07/2024 ( Expired 317 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Dc of twin tunnel by shield tbm, cut and cover tb, underground ramp and four underground and balance work of nk station with entry/exits including retrieval/ls, af, ws..si and dw..of inderlok-indraprastha corridor of delhi mrts project of phase-iv.
Dc of twin tunnel by shield tbm, cut and cover tb, underground ramp and four underground and balance work of nk station with entry/exits including retrieval/ls, af, ws..si and dw..of inderlok-indraprastha corridor of delhi mrts project of phase-iv.
Read moreDesign, supply, installation, testing and commissioning of 25 kv overhead equipment (ohe) for elevated corridor of line-10 (saket g block to sangam vihar) and line-5 ext. (inderlok and ashok park main station) of delhi metro mrts phase-iv.
Design, supply, installation, testing and commissioning of 25 kv overhead equipment (ohe) for elevated corridor of line-10 (saket g block to sangam vihar) and line-5 ext. (inderlok and ashok park main station) of delhi metro mrts phase-iv.
Read moreConstruction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn
Construction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn
Read moreConstruction of an it office building under quad project in technopark phase iv (technocity) campus, trivandrum
Construction of an it office building
Read moreSupply, installation, testing and commissioning of electrical panels, cables and construction of rcc trenches for functionality of phase-i technical labs at barc near visakhapatnam, a.p.
Supply, installation, testing and commissioning of electrical panels, cables and construction of rcc trenches for functionality of phase-i technical labs at barc near visakhapatnam, a.p.
Read moreAllotment of smp, kolkata land measuring about 161875 sq. mtrs alongside bundh road of river in the industrial zone of hdc, on long term lease of 30 years on as is where is basis, upon payment of upfront rent through tender cum auction
Allotment of smp, kolkata land measuring about 161875 sq. mtrs alongside bundh road of river in the industrial zone of hdc, on long term lease of 30 years on as is where is basis, upon payment of upfront rent through tender cum auction
Read moreDesign and const of 590 mtr snow gallery, const of 483 mtr snow avalanche catch dam, 100 m loose rock scaling on d-s road approach road to south portal of proposed shinkun la tunnel under 126 rcc 13 tf of project yojak in the state of hp through epc
Design and const of 590 mtr snow gallery, const of 483 mtr snow avalanche catch dam, 100 m loose rock scaling on d-s road approach road to south portal of proposed shinkun la tunnel under 126 rcc 13 tf of project yojak in the state of hp through epc
Read moreRepair and maintenance of induction
Repair and maintenance of induction&#x0d motors and pumps, dg and other&#x0d miscellaneous work at ptcul hq
Read moreRoutine maintenance and incident management work of from sitarganj km 0 000 to tanakpur km 52 200 under nhdp iv on epc mode of two lane with paved shoulders of section of old nh 125 new nh 09 in the state of uttarakhand
Routine maintenance and incident management work of from sitarganj km 0 000 to tanakpur km 52 200 under nhdp iv on epc mode of two lane with paved shoulders of section of old nh 125 new nh 09 in the state of uttarakhand
Read moreof your Industry type