Tender Details

Particulars Details
Title
Provision Of Centralized Chilled Water Hvac To Additional Floors In Raman, Ramanujan And Saif Blocks At Iit Madras
Description
Provision Of Centralized Chilled Water Hvac To Additional Floors In Raman, Ramanujan And Saif Blocks At Iit Madras
Organisation Indian Institute of Technology Madras | Public Sector Undertakings
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 0
EMD 1.61 Lakh
Tender Value
Place IIT MADRAS CHENNAI
Link

AAAAAAAAAA

Login to view
Start Date June 27, 2025 14:30
End Date

14/07/2025 ( 17 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Read more
Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.

Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.

Read more
Reconstruction of narrow minor bridge 3 nos. to four lane configuration n.h.63 section kuslamb yedshi at ch. 4.113 and 9.748 and 10.203 on epc mode in the state of maharashtra

Reconstruction of narrow minor bridge 3 nos. to four lane configuration n.h.63 section kuslamb yedshi at ch. 4.113 and 9.748 and 10.203 on epc mode in the state of maharashtra

Read more
Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25

Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25

Read more
Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.

Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.

Read more
Construction of it office building, ground floor plus 3 floors plus terrace, including civil construction, hvac, electrical htlt, elevator, ibms, fire protection, plumbing, structural facade, landscaping, stp,wtp at rasipuram in namakkal

Construction of it office building, ground floor plus 3&amp#x0d floors plus terrace, including civil construction, hvac, electrical htlt,&amp#x0d elevator, ibms, fire protection, plumbing, structural facade, landscaping,&amp#x0d stp,wtp at rasipuram in namakkal

Read more
Providing of solar/power caution blinkers and illumination by solar/conventional lighting at median opening locations of morth identified blackspots/accident spots of hyderabad-vijayawada section of nh-65 from km.40 to 221.500 in the state of tg, ap.

Providing of solar/power caution blinkers and illumination by solar/conventional lighting at median opening locations of morth identified blackspots/accident spots of hyderabad-vijayawada section of nh-65 from km.40 to 221.500 in the state of tg, ap.

Read more
Construction of 01 no. (gplus2) 4 unit c type building with provision of extension up to (gplus3) and its allied work at chiranjibpur colony complex under haldia area office

Construction of 01 no. (gplus2) 4 unit c type building with provision of extension up to (gplus3) and its allied work at chiranjibpur colony complex under haldia area office

Read more
Construction of 4 lane bypass to vellore town ing from km 47.400 of nh-75 and ending at km 12.650 of nh-38 (length 20.492 km) in the state of tamil nadu.

Construction of 4 lane bypass to vellore town ing from km 47.400 of nh-75 and ending at km 12.650 of nh-38 (length 20.492 km) in the state of tamil nadu.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise