Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Different Capacity Rcc Ohr Based On Departmental Design Drawing With 20 Mtr Staging
|
| Description |
Construction Of Different Capacity Rcc Ohr Based On Departmental Design Drawing With 20 Mtr Staging 
Height Including Geo Technical Investigation Foundation Pipeline Connection And Cost Of Pipes Specials Etc 
For Augmentation Of Dif
|
| Organisation | National Projects Construction Corporation Limited | Public Sector Undertakings |
| Tender Id | 2024_NPCC_184947_1 |
|
Reference Number |
NPCC/EZ/PHE/23-24/1146 dt. 07.02.24 (5th Call) |
| Tender Fee | 35815 |
| EMD | 30.35 Lakh |
| Tender Value | |
| Place | Canning |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=202466 |
| Start Date | February 09, 2024 15:30 |
| End Date |
Expired
15/02/2024
Expired 862 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Design, engineering, supply, installation and commissioning of 757 kwp / 742 kw or above capacity on-grid rooftop solar power plant on 11 identified buildings
Design, engineering, supply, installation and commissioning of 757 kwp / 742 kw or above capacity on-grid rooftop solar power plant on 11 identified buildings
Read moreAnnual maintenance contract for solar based pumping unit with allied accessories installed by the phe ground water division, srinagar in different districts of kashmir valley.
Annual maintenance contract for solar based pumping unit with allied accessories installed by the phe ground water division, srinagar in different districts of kashmir valley.
Read moreRepairing / rebuilding of buckets, repairing / rebuilding of different types of bucket chains and repairing/rebuilding of bucket accessories. of 20/90 bajrang and matang dragline working at nigahi project on labour basis for a period of 2 years.
Repairing / rebuilding of buckets, repairing / rebuilding of different types of bucket chains and repairing/rebuilding of bucket accessories. of 20/90 bajrang and matang dragline working at nigahi project on labour basis for a period of 2 years.
Read moreConstruction of 145 boundary pillars at julla forest in katra range of demarcation as per approved design at different locations as per tashree burjiat (deion of boundary pillar) of reasi forest division under ut capex 2026-27
Construction of 145 boundary pillars at julla forest in katra range of demarcation as per approved design at different locations as per tashree burjiat (deion of boundary pillar) of reasi forest division under ut capex 2026-27
Read moreRepair and rehabilitation of deopani bridge at km 5.824 construction of rcc covered drains and installation of ms railings on the meka roing section from km 0.00 to km 6.124 of nh-313
Repair and rehabilitation of deopani bridge at km 5.824 construction of rcc covered drains and installation of ms railings on the meka roing section from km 0.00 to km 6.124 of nh-313
Read moreInvestigation survey on gis basis and construction of 300 kld and 900 kld stp with 4 kld co treatment 19 no leach pit each capacity 10 kld i and d structure and drain work in nagar panchayat amethi distt lucknow up india
Investigation survey on gis basis and construction of 300 kld and 900 kld stp with 4 kld co &#x0d treatment 19 no leach pit each capacity 10 kld i and d structure and drain work in nagar &#x0d panchayat amethi distt lucknow up india
Read moreDevelopment of prakram chowk comprising construction of adequate rcc foundation, landscaping and beautification works, and installation of ornamental light fittings with all required electrical and civil components, complete as directed
Development of prakram chowk comprising construction of adequate rcc foundation, landscaping and beautification works, and installation of ornamental light fittings with all required electrical and civil components, complete as directed
Read moreTender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Tender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreRectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor
Rectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor
Read moreof your Industry type