Tender Details

Particulars Details
Title
Construction Of Rob At Lc Gate No. St 5 At Km 8/2 3 On R.K. Choudhury M.G. Road Under Construction Of Ro Bs On 50 50 Cost Sharing Basis
Description
Construction Of Rob At Lc Gate No. St 5 At Km 8/2 3 On R.K. Choudhury M.G. Road Under Construction Of Ro Bs On 50 50 Cost Sharing Basis
Organisation Public Works Roads Department | State Govt. and UT
Tender Id 2024_PWD_39445_1
Reference
Number
CE/STBR/II/20/2024-25/01 Dated 23/08/2024
Tender Fee 1742
EMD 1.74 Lakh
Tender Value
Place Guwahati
Link https://assamtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=64060
Start Date September 28, 2024 22:30
End Date

08/10/2024 ( Expired 266 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Read more
E tender cum e auction for allotment of land parcel and assets 1.5 ha. (plot no. f-5) on fresh long term lease basis of 30 yrs under pglm 2015 (and clarifications issued by mopsw from time to time till 10.12.2024) for liquid storage facilities at jnp

E tender cum e auction for allotment of land parcel and assets 1.5 ha. (plot no. f-5) on fresh long term lease basis of 30 yrs under pglm 2015 (and clarifications issued by mopsw from time to time till 10.12.2024) for liquid storage facilities at jnp

Read more
Construction of foot over bridge (fob) near holy shrine, bambolim at km 524.330 on nh-66 in the state of goa on epc mode under road safety annual plan 2023-24.

Construction of foot over bridge (fob) near holy shrine, bambolim at km 524.330 on nh-66 in the state of goa on epc mode under road safety annual plan 2023-24.

Read more
Construction of rob with approaches in lieu of railway crossing lc 20 on nh 161h at km 24.913 in the state of maharashtra on epc mode

Construction of rob with approaches in lieu of railway crossing lc 20 on nh 161h at km 24.913 in the state of maharashtra on epc mode

Read more
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode

Read more
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode

Read more
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode

Read more
Construction of 98.0 m 2-span steel truss bridge over abohar branch rd-180265 feet on link road jagraon to hathur to dallah, mallah, chakkar road t-01 from km. 0.000 to km. 24.580 under pmgsy-lll batch-3 in district ludhiana. package no. pb-10-135a

Construction of 98.0 m 2-span steel truss bridge over abohar branch rd-180265 feet on link road jagraon to hathur to dallah, mallah, chakkar road t-01 from km. 0.000 to km. 24.580 under pmgsy-lll batch-3 in district ludhiana. package no. pb-10-135a

Read more
Construction of link between already constructed three-legged elevated rotary on amritsar taran taran road mdr103 to amritsar bhikhiwind khemkaran road nh 354 in district amritsar punjab ic construction of rob near closed lc no c 11 at km 701 betwe

Construction of link between already constructed three-legged elevated rotary on amritsar taran taran road mdr103 to amritsar bhikhiwind khemkaran road nh 354 in district amritsar punjab ic construction of rob near closed lc no c 11 at km 701 betwe

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise