Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Air Spring Assembly (160 Kn) For Lhb Coaches.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 106535228 |
|
Reference Number |
30247448 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | |
| Place | Bhubaneswar |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/supply/pdfdocs/122024/106535228/viewNitPdf_4784646.pdf |
| Start Date | November 25, 2024 20:01 |
| End Date |
Expired
16/12/2024
Expired 538 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supplu of 5000 nos 11 kv metal parts for dog and raccoon conductor 36 kn
Supplu of 5000 nos 11 kv metal parts for dog and raccoon conductor 36 kn
Read moreWiper blade assembly for wag-9 locomotives.
For complete deion and other details, please refer to tender
Read moreSupply of beacon housing welded assembly for sonar beacon project
Supply of beacon housing welded assembly for sonar beacon project
Read moreStringing of air buch cable for mine magazine power supply arrangement at chikla mine.
Stringing of air buch cable for mine magazine power supply arrangement at chikla mine.
Read morePrimary suspension spring (inner ) for wag-7 loco,rdso drg.no.- skvl-037 alt.6 with latest alt. rdso specn.no.- mp.0.4900.12 (rev.05) dec 2020 with latest rev.
For complete deion and other details, please refer to tender
Read moreSitc of 33 kv,3 pole,3 phase gang operated air break switch for replacement of worn out/damaged 33 kv air break switch near store subdivision for 33 kv ljhp-peernia transmission line
Sitc of 33 kv,3 pole,3 phase gang operated air break switch for replacement of worn out/damaged 33 kv air break switch near store subdivision for 33 kv ljhp-peernia transmission line
Read moreDharmapuri district - construction of houses for srilankan rehabilitation camp in vanniyar dam of pappireddipatti block - 81 to 160 houses (8 houses (gplus 1) -10 units - centre) including the leveling of site. pkg.no. tn04-02 / srilankan rehabili
Construction of houses for srilankan rehabilitation camp in vanniyar dam of pappireddipatti block - 81 to 160 houses (8 houses (gpl1) -10 units - centre) including the leveling of site. pkg.no. tn04-02 / srilankan rehabilitation 2025-2026 pappired
Read moreInter vehicular coupler (iv coupler) socket assembly (complete set) for wap-7 electric locomotives specification- rdso spec: rdso/pe/spec/ac/0177-2013 rev 1 with latest rev
For complete deion and other details, please refer to tender
Read moreWiper arm complete assembly rh with wiper blade. specn/ drg. no. :- clw spec.no- clw/ms/3/050. alt-6, clw drg. no. 1209-08-032-023. with latest alt.
For complete deion and other details, please refer to tender
Read moreof your Industry type