Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Temporary Pandal With Flooring Seating Arrangement Carpeting Temporary Electrification Etc In The Lawn Area Of Chief Minister Secretariat And Illumination Of Chief Minister Secretariat At Maijan Dibrugarh On 26.01.2025 And 27.01.2025
|
Description |
Construction Of Temporary Pandal With Flooring Seating Arrangement Carpeting Temporary Electrification Etc In The Lawn Area Of Chief Minister Secretariat And Illumination Of Chief Minister Secretariat At Maijan Dibrugarh On 26.01.2025 And 27.01.2025
|
Organisation | Public Works Building and NH Department | State Govt. and UT |
Tender Id | 2025_PWBNH_42324_1 |
Reference Number |
SEB/DIB/PANDALCMSect/24-25/737 |
Tender Fee | 1200 |
EMD | 1.16 Lakh |
Tender Value | |
Place | MAIJAN DIBRUGARH |
Link | https://assamtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=68025 |
Start Date | January 23, 2025 20:00 |
End Date |
25/01/2025 ( Expired 110 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham
Ie for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham
Read moreConstruction of fob at km 6.420 (amity university), grade separated structures/flyover at km 7.965 and 8.075 (riico kant kalwar), 11.780 (achrol) and 25.300 (kukas) with slip road on nh-248 for rectification of identified blackspots/accident spots in
Construction of fob at km 6.420 (amity university), grade separated structures/flyover at km 7.965 and 8.075 (riico kant kalwar), 11.780 (achrol) and 25.300 (kukas) with slip road on nh-248 for rectification of identified blackspots/accident spots in
Read moreConstruction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Read moreConstruction of offices of chief secretary/ addl. chief secretary, honble ministers and convention centre at cm secretariat campus, dibrugarh, assam
Construction of offices of chief secretary/ addl. chief secretary, honble ministers and convention centre at cm secretariat campus, dibrugarh, assam
Read moreLabour engaged for collection of seed, upkeeping ,maintenance of lawn at bade pathran wala dam , white wash and paint work on stones etc. in upper and lower ghareri beat, ghareri block, nepli range
Labour engaged for collection of seed, upkeeping ,maintenance of lawn at bade pathran wala dam , white wash and paint work on stones etc. in upper and lower ghareri beat, ghareri block, nepli range
Read moreRe-carpeting of roads and construction of paved shoulder with footpath at industrial area prahaladpura, jaipur
Re-carpeting of roads and construction of paved shoulder with footpath at industrial area prahaladpura, jaipur
Read moreDismantling, shifting and laying of pipeline of 6 inch dia ( 800m approx.) as per requirement with priming arrangement and replacement of different types of damaged valves in existing pipelines at amrapali ocp under a-c area
Dismantling, shifting and laying of pipeline of 6 inch dia ( 800m approx.) as per requirement with priming arrangement and replacement of different types of damaged valves in existing pipelines at amrapali ocp under a-c area
Read moreAmc for repairing works on blade hub of 250kw weg and ring seating area in yaw output bracket at wind farm.
Amc for repairing works on blade hub of 250kw weg and ring seating area in yaw output bracket at wind farm.
Read moreConstruction of new boundary wall around proposed solar installation area along with demolition of existing brick masonry shed structure/stone masonry structure/gantry structure and earth filling in water lodged area at kotla.
Construction of new boundary wall around proposed solar installation area along with demolition of existing brick masonry shed structure/stone masonry structure/gantry structure and earth filling in water lodged area at kotla.
Read moreWork of temporary lighting, decoration and mike sound arrangement as per requirement at various places in the development authority area (annual)
Work of temporary lighting, decoration and mike sound arrangement as per requirement at various places in the development authority area (annual)
Read moreof your Industry type