Tender Details
Particulars | Details |
---|---|
Title |
Maintenance And Repairing Of Steel Bridge No 1/3 On Pothaligarh Road Over Darika River Under Ongc Deposit Fund For The Year 2024 25 Of District Sivasagar(demow Lac)
|
Description |
Maintenance And Repairing Of Steel Bridge No 1/3 On Pothaligarh Road Over Darika River Under Ongc Deposit Fund For The Year 2024 25 Of District Sivasagar(demow Lac)
|
Organisation | Public Works Roads Department | State Govt. and UT |
Tender Id | 2025_PWD_42345_1 |
Reference Number |
SDTRD/NIT/01/24-25/Pt-IV/3004 |
Tender Fee | 812 |
EMD | 81160 |
Tender Value | |
Place | Steel Bridge No 1/3 on Pothaligarh Road over Darik |
Link | https://assamtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=68058 |
Start Date | January 27, 2025 16:30 |
End Date |
03/02/2025 ( Expired 104 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Repair and rehabilitation of br no. 316/1, 331/1, 332/1, 338/1, 341/1, 354/2, 361/2 on nh 15 under annual plan for the year 2024-25 under pwd under nagaon nh division, nagaon in the state of assam on epc mode.(job no br/15/as/2024-25/284).
Repair and rehabilitation of br no. 316/1, 331/1, 332/1, 338/1, 341/1, 354/2, 361/2 on nh 15 under annual plan for the year 2024-25 under pwd under nagaon nh division, nagaon in the state of assam on epc mode.( job no br/15/as/2024-25/284).
Read moreMaintenance of road from ch.15.00 to 61.500 of nh 334a in total length of 46.500 km under performance based maintenance contract (pbmc) for the financial year 2024-25 in the state of uttarakhand
Maintenance of road from ch.15.00 to 61.500 of nh 334a in total length of 46.500 km under performance based maintenance contract (pbmc) for the financial year 2024-25 in the state of uttarakhand
Read morePeriodical repair of the road from nh 08 to steel hanging bridge over deo river under deo valley vc l 700 00m during the year 2025 26 sh patch soling patch metalling grouting carpeting etc
Periodical repair of the road from nh 08 to steel hanging bridge over deo river under deo valley vc l 700 00m during the year 2025 26 sh patch soling patch metalling grouting carpeting etc
Read more- (1) consultancy service for preliminary and detailed engineering including preparation of detailed project report for replacement of cable stayed suspension foot bridge by construction of rcc bridge over dhalai river on manikbhander to darang road
- (1) consultancy service for preliminary and detailed engineering including preparation of detailed project report for replacement of cable stayed suspension foot bridge by construction of rcc bridge over dhalai river on manikbhander to darang road
Read moreWbpwd(r)/se/chc/nib-01/25-26/1 / collection of toll on shree gouranga setu over river bhagirathi at nabadwip in the district of nadia under nadia highway division no. i.
Collection of toll on shree gouranga setu over river bhagirathi at nabadwip in the district of nadia under nadia highway division no. i.
Read moreRepair maintenance for attending day to day on line complaints of area b at naval dockyard visakhapatnam under ge(i) dm visakhapatnam
Repair maintenance for attending day to day on line complaints of area b at naval dockyard visakhapatnam under ge(i) dm visakhapatnam
Read moreBalance work on risk and cost of the contractor under construction of major high-level bridge across panvel-mahad-panjim road nh-66 (old-17) at km 91.400 god river, km 94.400 kal river and km 161.400 choradi river on nh-66 in raigad district in the s
Balance work on risk and cost of the contractor under construction of major high-level bridge across panvel-mahad-panjim road nh-66 (old-17) at km 91.400 god river, km 94.400 kal river and km 161.400 choradi river on nh-66 in raigad district in the s
Read moreBalance work on risk and cost of the contractor under construction of major high-level bridge across panvel-mahad-panjim road nh-66 (old-17) at km 91.400 god river, km 94.400 kal river and km 161.400 choradi river on nh-66 in raigad district in the s
Balance work on risk and cost of the contractor under construction of major high-level bridge across panvel-mahad-panjim road nh-66 (old-17) at km 91.400 god river, km 94.400 kal river and km 161.400 choradi river on nh-66 in raigad district in the s
Read moreImprovement of road from palku to sirduk (hrangkhawl para) via 1 no songtang, 2 no songtang and 3 no songtang under ridf xxx of nabard. (job no. tp/com/223/2024-25)
Improvement of road from palku to sirduk (hrangkhawl para) via 1 no songtang, 2 no songtang and 3 no songtang under ridf xxx of nabard. (job no. tp/com/223/2024-25)
Read moreSpecial repair of link roads programme year 2022-23, 2023-24 and 2024-25 (group no. 1) mc barnala including 5 year maintenance (1 year defect liability period plus 4 years maintenance) under nabard loan nida scheme 2024-25
Special repair of link roads programme year 2022-23, 2023-24 and 2024-25 (group no. 1) mc barnala including 5 year maintenance (1 year defect liability period plus 4 years maintenance) under nabard loan nida scheme 2024-25
Read moreof your Industry type