Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Operation And Maintenance Of 10 Mw Ground Mounted Solar Pv Plant Sg Tpp
|
| Description |
Operation And Maintenance Of 10 Mw Ground Mounted Solar Pv Plant Sg Tpp
|
| Organisation | THE WEST BENGAL POWER DEVELOPMENT CORPORATION LTD. | State Govt. and UT |
| Tender Id | 2024_WBPDC_746061_1 |
|
Reference Number |
WBPDCL/SGTPP/NIT/E3106/24-25 |
| Tender Fee | 0 |
| EMD | 2.45 Lakh |
| Tender Value | - |
| Place | Adbuilding SGTPP P.O Manigram Dist Murshidabad |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1648894 |
| Start Date | September 16, 2024 15:30 |
| End Date |
Expired
16/10/2024
Expired 685 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Selection of solar power developers for setting up of 150 mw solar pv power projects with 75 mw/300 mwh energy storage systems (ess) in the state of bihar under tariff-based competitive bidding
Selection of solar power developers for setting up of 150 mw solar pv power projects with 75 mw/300 mwh energy storage systems (ess) in the state of bihar under tariff-based competitive bidding
Read moreDesign, build, construct, install, commissioning of compost plant of 10 tpd for wet waste along with operation and maintenance of plant for 5 years including the tipping fee
Design, build, construct, install, commissioning of compost plant of 10 tpd for wet waste along with operation and maintenance of plant for 5 years including the tipping fee
Read moreDesign, build, construct, install adn commissioning of compost plant of 10 tpd for wet waste along with operation and maintenance of plant for 5 years including the tipping fee.
Design, build, construct, install adn commissioning of compost plant of 10 tpd for wet waste along with operation and maintenance of plant for 5 years including the tipping fee.
Read moreDesign, build, construct, install, and commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years
Design, build, construct, install, and commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years
Read moreDesign, build, construct, install adn commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years.
Design, build, construct, install adn commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years.
Read moreMaintenance of lawn beds, shrubs, ground cover, hedges, flower beds & trees, including sweeping, protection, operation and maintenance of garden equipments and water supply system etc, at rock garden during 2026-27.
Maintenance of lawn beds, shrubs, ground cover, hedges, flower beds & trees, including sweeping, protection, operation and maintenance of garden equipments and water supply system etc, at rock garden during 2026-27.
Read moreMaintenance of lawn beds, shrubs, ground cover, hedges, flower beds & trees in within the terraces and outside the terraces including sweeping, protection, operation and maintenance of garden equipments and water supply system etc, at 77 acre garden during 2026-27.
Maintenance of lawn beds, shrubs, ground cover, hedges, flower beds & trees in within the terraces and outside the terraces including sweeping, protection, operation and maintenance of garden equipments and water supply system etc, at 77 acre garden during 2026-27.
Read moreEstablishment, commissioning of 6.0mld regional combined sewage & effluent treatment facility (rcsetf) civil/common infrastructure installed treatment machinery zero liquid discharge (zld) on turnkey basis including operation & maintenance of entire plant for a period of 5 years at mundargi 4th phase industrial area, ballari district.
Establishment, commissioning of 6.0mld regional combined sewage & effluent treatment facility (rcsetf) civil/common infrastructure installed treatment machinery zero liquid discharge (zld) on turnkey basis including operation & maintenance of entire plant for a period of 5 years at mundargi 4th phase industrial area, ballari district.
Read moreDevelopment, operation and maintenance including civil works, installation of smart technology solutions, and collection of gate entrance fees from goods and goods vehicles at k.r. market in bccc for a period of 10 (ten) years, with a minimum yearly payment of 36.50 lakhs (excluding gst) and other taxes to bccc.
Development, operation and maintenance including civil works, installation of smart technology solutions, and collection of gate entrance fees from goods and goods vehicles at k.r. market in bccc for a period of 10 (ten) years, with a minimum yearly payment of 36.50 lakhs (excluding gst) and other taxes to bccc.
Read moreName of work- comprehensive operation and maintenance and special repair of resind work of 04 no. of ward level piped water supply schemes in quality affected ward-1,2,7, 10 scheme-1b, 2b, 7b & 10b of panchayat-goriyar west block-banamkhi under p.h division, dhamdaha, district-purnea based on item rates; constructed by the public health engineering department including payment to the pump operators, electricity bill for five years.
Name of work- comprehensive operation and maintenance and special repair of resind work of 04 no. of ward level piped water supply schemes in quality affected ward-1,2,7, 10 scheme-1b, 2b, 7b & 10b of panchayat-goriyar west block-banamkhi under p.h division, dhamdaha, district-purnea based on item rates; constructed by the public health engineering department including payment to the pump operators, electricity bill for five years.
Read moreof your Industry type