Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Design, Development & Deployment Of Hybrid Qa 4.0 Software Solution,Hardware Deployment Setup For H
|
Description |
|
Organisation | Department of Defence Production | Ministry of Defence |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link |
AAAAAAAAAA Login to view |
Start Date | June 30, 2025 22:50 |
End Date |
17/07/2025 ( 16 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Design, supply, installation and commissioning of open standard digital trunking radio system for chandigarh police
Design, supply, installation and commissioning of open standard digital trunking radio system for chandigarh police
Read morePkg-i - undersea power cable package (ca-01) for 220kv undersea export power cable and underground land cable under development of transmission system for offshore wind zone phase-i (500 mw vgf) off the coast of gujarat for subzone b3
Pkg-i - undersea power cable package (ca-01) for 220kv undersea export power cable and underground land cable under development of transmission system for offshore wind zone phase-i (500 mw vgf) off the coast of gujarat for subzone b3
Read moreIndigenous development of restraining gear for aircraft carriers
Design ,development, manufacturing, testing, supply, preservation, installation, alignment, setting to work, commissioning, acceptance and trials of restraining gear and associated system and accessories for aircraft carriers, as per sotrs
Read moreEoi for development of advanced medium combat aircraft (amca)
Eoi for development of advanced medium combat aircraft (amca)
Read moreDevelopment of stp and associated infrastructure at lohta varanasi uttar pradesh including operation and maintenance period of 15 years through hybrid annuity based ppp mode under namami gange programme
Development of stp and associated infrastructure at lohta varanasi uttar pradesh including operation and maintenance period of 15 years through hybrid annuity based ppp mode under namami gange programme
Read moreSelection of bus operator for procurement, supply, operation and maintenance of 10,900 electric buses and development of allied electric and civil infrastructure on gross cost contracting (gcc) under pm e-drive scheme
Selection of bus operator for procurement, supply, operation and maintenance of 10,900 electric buses and development of allied electric and civil infrastructure on gross cost contracting (gcc) under pm e-drive scheme.
Read moreConsultancy services for authoritys engineer for supervision of construction of 4 lane with ps idar-badoli bypass section from design chainage km 81.300 to 95.500 of nh-168g in the state of gujarat ,total length 14.2 km, on epc mode
Consultancy services for authoritys engineer for supervision of construction of 4 lane with ps idar-badoli bypass section from design chainage km 81.300 to 95.500 of nh-168g in the state of gujarat ,total length 14.2 km, on epc mode
Read moreDesign, engineering, manufacture, supply and delivery of new ip rotor (with full blading) for turbine model,c 210-130 (for 210 mw unit of kolaghat tps) through capex 2025-26
Design, engineering, manufacture, supply and delivery of new ip rotor (with full blading) for turbine model,c 210-130 (for 210 mw unit of kolaghat tps) through capex 2025-26
Read moreIe services during onm period for four laning of nh-365a from kodad (design km 0.00/ existing km.185.00 of nh-65) to khammam (design km.31.800/ existing km.29.400) (design length 31.800 km) in the state of telangana under bharatmala pariyojana on ham
Ie services during onm period for four laning of nh-365a from kodad (design km 0.00/ existing km.185.00 of nh-65) to khammam (design km.31.800/ existing km.29.400) (design length 31.800 km) in the state of telangana under bharatmala pariyojana on ham
Read moreCarrying out tests on completion and during mntnance pd using nsv, fwd, mbiu, retro-reflectometer etc for a-p rd section of nh-144a ex ch from km 85.385 to km 102.000 (design chainage km 74.350 to km 90.150) (pkg-iv) d in jk (ut) under 35 tf/(
Carrying out tests on completion and during mntnance pd using nsv, fwd, mbiu, retro-reflectometer etc for a-p rd section of nh-144a ex ch from km 85.385 to km 102.000 (design chainage km 74.350 to km 90.150) (pkg-iv) d in jk (ut) under 35 tf/(
Read moreof your Industry type