Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Manual Cleaning, Collection And Removal Of Mill Rejects, Ash, Clinkers, Other Coal Spillage In The Basement Areas, Coal Feeder Areas, Boiler Furnace Areas, Silo Area And Other Areas Of Unit No.7 And 8 Of Dpps For A Period Of 02(two) Years.
|
Description |
Manual Cleaning, Collection And Removal Of Mill Rejects, Ash, Clinkers, Other Coal Spillage In The Basement Areas, Coal Feeder Areas, Boiler Furnace Areas, Silo Area And Other Areas Of Unit No.7 And 8 Of Dpps For A Period Of 02(two) Years.
|
Organisation | THE DURGAPUR PROJECTS LIMITED | State Govt. and UT |
Tender Id | 2025_DPL_814863_1 |
Reference Number |
WBDPL-12017/1/2025-GM-POW (DPL)-DPL/PS/E-302 Dated- 12.02.2025 |
Tender Fee | 0 |
EMD | 2.4 Lakh |
Tender Value | |
Place | DPPS,DPL. |
Link | https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1811832 |
Start Date | February 12, 2025 21:30 |
End Date |
27/02/2025 ( Expired 124 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Hiring of backhoe loader (0.24 cu.m backhoe bucket, 1.0 cu.m loader bucket) for cleaning of spillage and wiping coal at jvroc for a period of 2 years, kgm area.
Hiring of backhoe loader (0.24 cu.m backhoe bucket, 1.0 cu.m loader bucket) for cleaning of spillage and wiping coal at jvroc for a period of 2 years, kgm area.
Read moreBiennial maintenance contract for cleaning and housekeeping of boiler coal mill area and other adjacent area and round the clock operation and titbit maintenance of mrs for unit3 and unit4 and upcoming unit5 at sgtpp, wbpdcl
Biennial maintenance contract for cleaning and housekeeping of boiler coal mill area and other adjacent area and round the clock operation and titbit maintenance of mrs for unit3 and unit4 and upcoming unit5 at sgtpp, wbpdcl
Read moreMaintenance of water supply line including periodical cleaning of water tank, valve chambers, water main-line wash along with other miscellaneous work for a period of two years (2024-2026) in haldia township area under rz and spl. rt section, h.d.c
Maintenance of water supply line including periodical cleaning of water tank, valve chambers, water main-line wash along with other miscellaneous work for a period of two years (2024-2026) in haldia township area under rz and spl. rt section, h.d.c
Read moreSupply, installation and commissioning of floating trash skimmer and waste removal machine with weed cutting arrangement (aquatic weed removal machine) including o and m services for a period of two (02) years in prayagraj city (u.p) for pma
Supply, installation and commissioning of floating trash skimmer and waste removal machine with weed cutting arrangement (aquatic weed removal machine) including o and m services for a period of two (02) years in prayagraj city (u.p) for pma
Read moreShort term contract for upkeep of sgp and gtg hrsg cleaning of heating surfaces of boilers, removal disposal of spillage of ash and coal reject. 2025-26 for three months
Short term contract for upkeep of sgp and gtg hrsg cleaning of heating surfaces of boilers, removal disposal of spillage of ash and coal reject. 2025-26 for three months
Read moreBiennial contract for stage i both units 2x300mw for cleaning and housekeeping of boiler and coal mill and other adjacent area and engagement of helpers to assist in mechanical operation job and disposal of mill reject or ash or debris by tractor
Biennial contract for stage i both units 2x300mw for cleaning and housekeeping of boiler and coal mill and other&#x0d adjacent area and engagement of helpers to assist in mechanical operation job and disposal of mill reject or ash&#x0d or debris by tractor
Read moreMtps i mp unit iv overhauling of gravimetric feeders and clean out conveyor and cleaning clearing the coal dust and ash deposited from bunker platforms feeder floor feeder discharge platforms coal pipes mill floor and mill gearbox of mill 4a to 4f
Mtps i mp unit iv overhauling of gravimetric feeders and clean out conveyor and cleaning clearing the coal dust and ash deposited from bunker platforms feeder floor feeder discharge platforms coal pipes mill floor and mill gearbox of mill 4a to 4f
Read moreA handling of ash spillage equipment up keeping activities related to plant and other misc jobs b internal cleaning up keeping of boilers coal gas fired leading to cib inspection in sgp cpp c up keeping of short shut down d up keeping of gtg and
A handling of ash spillage equipment up keeping activities related to plant and other misc jobs b internal cleaning up keeping of boilers coal gas fired leading to cib inspection in sgp cpp c up keeping of short shut down d up keeping of gtg and
Read moreAnnual maintenance and upkeep of existing gardens, lawns and other areas in and around the premises of a.o. bldg. at headland for a period of two years, 2025-2026 and 2026-2027
Annual maintenance and upkeep of existing gardens, lawns and other areas in and around the premises of a.o. bldg. at headland for a period of two years, 2025-2026 and 2026-2027
Read moreCleaning of spillage coal from belts and chutes and stacking the coal for a period of 02 years under chp cpp, piparwar area.
Cleaning of spillage coal from belts and chutes and stacking the coal for a period of 02 years under chp cpp, piparwar area.
Read moreof your Industry type