Tender Details
Particulars | Details |
---|---|
Title |
Balance Work For Construction Of Security Barrack At 400 Kv Gis Substation Chandwa Under Jipp A1 Project
|
Description |
Balance Work For Construction Of Security Barrack At 400 Kv Gis Substation Chandwa Under Jipp A1 Project
|
Organisation | Power Grid Corporation of India Limited | Central Govt. Ministry/Department |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 2000 |
EMD | 76000 |
Tender Value | |
Place | CHANDWA, JHARKHAND |
Link |
AAAAAAAAAA Login to view |
Start Date | May 14, 2025 23:24 |
End Date |
13/06/2025 ( 29 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreEngineering, procurement and construction of civil infrastructure and vacuum infrastructure for establishing ligo india observatory at aundha, hingoli district, maharashtra-431705, india, on epc mode-i basis
Engineering, procurement and construction of civil infrastructure and vacuum infrastructure for establishing ligo india observatory at aundha, hingoli district, maharashtra-431705, india, on epc mode-i basis
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Read moreMaintaining the buildings, sweeping of roads and plucking of grass in switch yard area and maintaining the plants and lawns at 400 kv ss suryapet in yadadri-bhongirir district for the period from 01.06.2025 to 31.03.2026 in omc, nalgonda
Maintaining the buildings, sweeping of roads and plucking of grass in switch yard area and maintaining the plants and lawns at 400kv ss suryapet in yadadri-bhongir district for the period from 01.06.2025 to 31.03.2026 in omc, nalgonda
Read moreTerm contract for afw for north zone-ii under jurisdiction of age b/r-ii at yol cantt
Term contract for afw for north zone-ii under jurisdiction of age b/r-ii at yol cantt
Read moreProvn of balance accn relating to baffle ranges alongwith allied works at akhnoor under ge (n) akhnoor
Provn of balance accn relating to baffle ranges alongwith allied works at akhnoor under ge (n) akhnoor
Read moreSurface cleaning and painting work of tower structures of total 02 no 132kv ehv lines (total 617 nos. towers and weight of towers 2105.97mt) under eht-maint. dn satna on labour contract basis at the risk and cost of m/s. shri vardhman trade, jabalpu
Surface cleaning and painting work of tower structures of total 02 no 132kv ehv lines (total 617 nos. towers and weight of towers 2105.97mt) under eht-maint. dn satna on labour contract basis at the risk and cost of m/s. shri vardhman trade, jabalpu
Read moreSupply, installation, testing and commissioning of electrical panels, cables and construction of rcc trenches for functionality of phase-i technical labs at barc near visakhapatnam, a.p.
Supply, installation, testing and commissioning of electrical panels, cables and construction of rcc trenches for functionality of phase-i technical labs at barc near visakhapatnam, a.p.
Read moreProvn of klp accn for stn hq and ci det swc at suratgarh mil stn under ge (army) suratgarh
Provn of klp accn for stn hq and ci det swc at suratgarh mil stn under ge (army) suratgarh
Read moreof your Industry type