Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Repairing Of Lathe Machine With Providing Supply And Fitting New 2nd And 3rd Motion Gear Pinion At Millennium Of Shankarpur Colliery.
|
| Description |
Repairing Of Lathe Machine With Providing Supply And Fitting New 2nd And 3rd Motion Gear Pinion At Millennium Of Shankarpur Colliery.
|
| Organisation | Eastern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2024_ECL_320221_1 |
|
Reference Number |
ECL/GM/BA/E TENDER/24-25/EnM/233 Dt 29.10.2024 |
| Tender Fee | 0 |
| EMD | 4100 |
| Tender Value | - |
| Place | Shankarpur Colliery |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=331940 |
| Start Date | October 29, 2024 23:30 |
| End Date |
Expired
08/11/2024
Expired 705 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Input pinion shaft part no. 3332233332a23,intrmdt pinion shft w/1 rst rdcton gear part no. 3332253332a25,output shaft w/2nd reduction gear part no. 3332283332a28
Input pinion shaft part no. 3332233332a23,intrmdt pinion shft w/1 rst rdcton gear part no. 3332253332a25,output shaft w/2nd reduction gear part no. 3332283332a28
Read moreInternal gear 80 t,1st. driven gear - 72 t,sun gear 24 t,planetary pinion 26 t,2nd. driven gear,isolator 300 amps, on-off,brush, crbn, 38 x 32 x 25 mm, grmise of acpl,brush holder for 50 kw-550v lt ac sliprin,insulator bshng, 11 kv, prcln
Internal gear 80 t,1st. driven gear - 72 t,sun gear 24 t,planetary pinion 26 t,2nd. driven gear,isolator 300 amps, on-off,brush, crbn, 38 x 32 x 25 mm, grmise of acpl,brush holder for 50 kw-550v lt ac sliprin,insulator bshng, 11 kv, prcln
Read moreLv1 r90 184.04.020sb 3rd lh strap,lv1 r90 172.40.346 bushing,lv1 r90 188.61.006sb lever,lv1 r90 187.94.001 pinion shaft,lv1 r90 172.40.326 thrust disk,lv1 r90 176.23.135 rod,lv1 r90 447a.11.088 lock handle,lv1 r90 172.40.305 sun gear of gear set ii,lv1 r90 172.23.021sb hand wheel,lv1 r90 188.02.028 lh support,lv1 r90 177.93.011sb rh rack,lv1 r90 188.83.018sb shaft,lv1 r90 188.91.053sb rack,lv1 r90 172.86.185a pipe union,lv1 r90 188.15.086sb guard,lv1 r90 188.83.013-01 bushing
Lv1 r90 184.04.020sb 3rd lh strap,lv1 r90 172.40.346 bushing,lv1 r90 188.61.006sb lever,lv1 r90 187.94.001 pinion shaft,lv1 r90 172.40.326 thrust disk,lv1 r90 176.23.135 rod,lv1 r90 447a.11.088 lock handle,lv1 r90 172.40.305 sun gear of gear set ii,lv1 r90 172.23.021sb hand wheel,lv1 r90 188.02.028 lh support,lv1 r90 177.93.011sb rh rack,lv1 r90 188.83.018sb shaft,lv1 r90 188.91.053sb rack,lv1 r90 172.86.185a pipe union,lv1 r90 188.15.086sb guard,lv1 r90 188.83.013-01 bushing
Read moreSupply, installation, integration, commissioning, testing, training and documentation for rtdct with electrical winches for existing tower testing facility -plcs and related accessories,servo drives, servo motors, servo valve drivers and associated hardware and software, mounting cabinets for servo drives,electrical winch assembly including planetary gear box, drum, sheave pullies,drum wire ropes and related accessories,computer systems, monitors, printer and ups systems,mounting fixtures for electrical winches, sheave pulleys, load di fixtures.,communication and interconnecting cables between master control room and vrs, trs, lrs stations and associated hardware and software,load cell cables, junction box for load cell, strain gauge, lvdt and interconnecting cables,cameras, anemometers, thermometers, associated cables and accessories,integration and commissioning,training,amc for 1st year after warranty,amc for 2nd year after warranty,amc for 3rd year after warranty
Supply, installation, integration, commissioning, testing, training and documentation for rtdct with electrical winches for existing tower testing facility -plcs and related accessories,servo drives, servo motors, servo valve drivers and associated hardware and software, mounting cabinets for servo drives,electrical winch assembly including planetary gear box, drum, sheave pullies,drum wire ropes and related accessories,computer systems, monitors, printer and ups systems,mounting fixtures for electrical winches, sheave pulleys, load di fixtures.,communication and interconnecting cables between master control room and vrs, trs, lrs stations and associated hardware and software,load cell cables, junction box for load cell, strain gauge, lvdt and interconnecting cables,cameras, anemometers, thermometers, associated cables and accessories,integration and commissioning,training,amc for 1st year after warranty,amc for 2nd year after warranty,amc for 3rd year after warranty
Read moreTransportation of 2nd motion and 3rd motion pinion of mamc haulage at 3 and 4 no pits for repairing and also 1600 meter.haulage rope change of shankarpur colliery under bankola area.
Transportation of 2nd motion and 3rd motion pinion of mamc haulage at 3 and 4 no pits for repairing and also 1600 meter.haulage rope change of shankarpur colliery under bankola area.
Read moreFabrication of 1st motion 26 teeth pinion shaft and 2nd motion 81 teeth pinion for 75kw gear box of kumardihi b colliery under bankola area.
Fabrication of 1st motion 26 teeth pinion shaft and 2nd motion 81 teeth pinion for 75kw gear box of kumardihi b colliery under bankola area.
Read moreFabrication of 1st motion 26 teeth pinion shaft and 2nd motion 81 teeth pinion for 75kw gear box of kumardihi b colliery under bankola area (retender)
Fabrication of 1st motion 26 teeth pinion shaft and 2nd motion 81 teeth pinion for 75kw gear box of kumardihi b colliery under bankola area (retender)
Read moreMiscellaneous jobs at millennium incline and of shankarpur colliery under
Miscellaneous jobs at millennium incline and of shankarpur colliery under
Read moreRepairing of main haulage 1st motion 2nd motion pinion, pinion bore shaft of pit no. 4 of chapuikhas colliery.
Repairing of main haulage 1st motion 2nd motion pinion, pinion bore shaft of pit no. 4 of chapuikhas colliery.
Read moreRepairing of electric winding supply and fitting of 1st motion new double helical gear pinion at nkj unit at khandra colliery.
Repairing of electric winding supply and fitting of 1st motion new double helical gear pinion at nkj unit at khandra colliery.
Read moreof your Industry type