Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Minor Civil And Electric Work (Conservation Of Ancient Monument) Conservation To Upper Fort At Aguada (Removal Of Vegetation)
|
| Description |
Minor Civil And Electric Work (Conservation Of Ancient Monument) Conservation To Upper Fort At Aguada (Removal Of Vegetation)
|
| Organisation | Archaeological Survey of India | Central Govt. Ministry/Department |
| Tender Id | 2024_ASI_811284_1 |
|
Reference Number |
08/2024-25/Goa Circle/Aguada |
| Tender Fee | 0 |
| EMD | 53545 |
| Tender Value | - |
| Place | Aguada |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=852585 |
| Start Date | June 12, 2024 00:20 |
| End Date |
Expired
01/07/2024
Expired 835 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Execution of work under minor civil and electric work (conservation of ancient monument) to structural repair and construction of dwarf wall around at jarai ki mariha.
As per tender document
Read moreRe - tender minor civil and electric works conservation of ancient monuments - complete maintenance and upkeep of archaeological gardens (horticulture) comes under asi, goa circle goa
Re - tender minor civil and electric works conservation of ancient monuments - complete maintenance and upkeep of archaeological gardens (horticulture) comes under asi, goa circle goa
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Read moreMinor civil and electric works (conservation of ancient monuments) conservation of upper fort at aguada (removal of vegetation) (re - call)
Minor civil and electric works (conservation of ancient monuments) conservation of upper fort at aguada (removal of vegetation) (re - call)
Read moreMinor civil and electric works (conservation of ancient monuments) conservation of upper fort at aguada (removal of vegetation) (re call 2)
Minor civil and electric works (conservation of ancient monuments) conservation of upper fort at aguada (removal of vegetation) (re call 2)
Read moreMinor civil and electric work (conservation of ancient monument) conservation and rejuvenation of the ancient water tank at upper fort aguada
Minor civil and electric work (conservation of ancient monument) conservation and rejuvenation of the ancient water tank at upper fort aguada
Read moreMinor civil and electric work (conservation of ancient monument) conservation of upper fort at aguada (restoration of different cells inside the fort)
Minor civil and electric work (conservation of ancient monument) conservation of upper fort at aguada (restoration of different cells inside the fort)
Read moreMinor civil and electric works (conservation of ancient monuments) conservation of upper fort at aguada (structural conservation and restoration of fort wall to the north west side)
Minor civil and electric works (conservation of ancient monuments) conservation of upper fort at aguada (structural conservation and restoration of fort wall to the north west side)
Read moreMinor civil and electric work (conservation of ancient monument) conservation to church of st. augustine at old goa (removal of vegetation)
Minor civil and electric work (conservation of ancient monument) conservation to church of st. augustine at old goa (removal of vegetation)
Read moreof your Industry type