Tender Details
Particulars | Details |
---|---|
Title |
Approach Road Filling Including Bank Of Cheera And Construction Of Retaining Wall And Cc Block To Protect Of Bank Of Cheera (Length 16 Mtr) Over The Rcc Foot Bridge Of Nilmani Para Over Champacheera At Paschim Champacheera Vc Under Tulashikhar Rd Blo
|
Description |
Approach Road Filling Including Bank Of Cheera And Construction Of Retaining Wall And Cc Block To Protect Of Bank Of Cheera (Length 16 Mtr) Over The Rcc Foot Bridge Of Nilmani Para Over Champacheera At Paschim Champacheera Vc Under Tulashikhar Rd Blo
|
Organisation | Chief Engineer, Rural Development Department | State Govt. and UT |
Tender Id | 2025_CERDD_56671_1 |
Reference Number |
21/RW-CCB/NIL/EE/RD/KHW-4-1-25 |
Tender Fee | 1000 |
EMD | 11341 |
Tender Value | |
Place | As per DNIT |
Link | https://tripuratenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=57629 |
Start Date | January 08, 2025 17:40 |
End Date |
17/01/2025 ( Expired 147 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of retaining wall and innovative plant compound along with other allied works at satiram para of siddha vc under ganganagar rd block within the jurisdiction of dws division ambassa
Construction of retaining wall and innovative plant compound along with other allied works at satiram para of siddha vc under ganganagar rd block within the jurisdiction of dws division ambassa
Read moreConst of hl bridge single span steel truss 36.00 each eff over sirhind canal xing bhucho kalan to nathana via seema poohli at rd 8.70 km inc appr road diversion dismantling 2.5 m high rcc retaining wall etc pmgsyiii batch i pac no pb02 047
Const of hl bridge single span steel truss 36.00 each eff over sirhind canal xing bhucho kalan
 to nathana via seema poohli at rd 8.70 km inc appr. road diversion dismantling and 2.5 m high rcc retaining wall etc pmgsyiii batch-i pac no pb-02 047 
Read moreConstruction of high level bridge skew 3 span 13.6m each eff. over lisara drain x-ing balianwali to lehra mohabat road at rd 1300 including its approaches,road di,dismantling and 2.5m high rcc retaining wall under pmgsy-iii(batch-1)
Construction of high level bridge skew 3 span 13.6m each eff. over lisara drain x-ing balianwali to lehra mohabat road at rd 1300 including its approaches,road di,dismantling and 2.5m high rcc retaining wall under pmgsy-iii(batch-1)
Read moreConstruction of high level bridge skew 3 span 13.0m each eff. over lisara drain x-ing bbm road to rampura pitho chowke at rd 6700 including its approaches,road di,dismantling and 2.5m high rcc retaining wall under pmgsy-iii(batch-1)
Construction of high level bridge skew 3 span 13.0m each eff. over lisara drain x-ing bbm road to rampura pitho chowke at rd 6700 including its approaches,road di,dismantling and 2.5m high rcc retaining wall under pmgsy-iii(batch-1)
Read moreConstruction of rcc retaining wall on left bank from rd19212m to rd19062m and on right bank from rd 18750 to 18800m of supplementary drain.
Construction of rcc retaining wall on left bank from rd19212m to rd19062m and on right bank from rd 18750 to 18800m of supplementary drain.
Read moreConstruction of rcc foot bridge over garai river to connect village of naramohan para and panchayat office under hezamara rd block, sh- construction of approach road with 80mm thick paver block.
Construction of rcc foot bridge over garai river to connect village of naramohan para and panchayat office under hezamara rd block, sh- construction of approach road with 80mm thick paver block.
Read moreConstruction and metalling tarring mata chintpurni to amlehar road from km 000 to 9350 sh construction of 14 40 mtr span cc rcc solid slab bridge over dhalwari khad at rd 4 155
Construction and metalling tarring mata chintpurni to amlehar road from km 000 to 9350 sh construction of 14 40 mtr span cc rcc solid slab bridge over dhalwari khad at rd 4 155
Read moreImprovement and widening of approach road to hapjan ocs from rcc bridge over tingrai river to tingrai reserve near forest tiniali indirect heater with earth filling for side berm, laying culvert with head wall, gsb, wbm and sdbc work including supply of all plant and materials except cement
Improvement and widening of approach road to hapjan ocs from rcc bridge over tingrai river to tingrai reserve near forest tiniali indirect heater with earth filling for side berm, laying culvert with head wall, gsb, wbm and sdbc work including supply of all plant and materials except cement
Read moreConstruction of 58 20 mtr span steel truss bridge over sundru khad to connect village janglikh at rd 0 980 sh c o steel truss super structure including abutment and bed block with approach on both sides
Construction of 58 20 mtr span steel truss bridge over sundru khad to connect village janglikh at rd 0 980 sh c o steel truss super structure including abutment and bed block with approach on both sides
Read moreConstruction or repairing of gravel approach road 1900 mtrs, construction of plinth, road over plinth, effluent pits with suitable bundhs or embankment etc,cleaning of plinth, construction cc or rcc foundations with pillow foundation, construction of drwaf wall to suit e 1400 rig out fit at jorajan, nagajan, kathalguri, langakshi, bazaloni and for any other location in cf east area including supply of all materials except cement.
Construction or repairing of gravel approach road 1900 mtrs, construction of plinth, road over plinth, effluent pits with suitable bundhs or embankment etc,cleaning of plinth, construction cc or rcc foundations with pillow foundation, construction of drwaf wall to suit e 1400 rig out fit at jorajan, nagajan, kathalguri, langakshi, bazaloni and for any other location in cf east area including supply of all materials except cement.
Read moreof your Industry type