Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Operation Of Water Pumps At Magathane Bus Depot. (Period 36 Months)
|
| Description |
Operation Of Water Pumps At Magathane Bus Depot. (Period 36 Months)
|
| Organisation | Brihanmumbai Electric Supply and Transport Undertaking | State Govt. and UT |
| Tender Id | 2024_BEST_1086099_1 |
|
Reference Number |
CEC/C4/80/2024-25 |
| Tender Fee | 1090 |
| EMD | 10000 |
| Tender Value | - |
| Place | Colaba |
| Link |
View Original Tender Notice
https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1895268 |
| Start Date | September 19, 2024 14:30 |
| End Date |
Expired
03/10/2024
Expired 722 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Hiring of 12nos of diesel operated generator sets 7.5kva,230v with mobile lighting towers for a period of 36 months for use at kocp,yellandu area.
Hiring of 12nos of diesel operated generator sets 7.5kva,230v with mobile lighting towers for a period of 36 months for use at kocp,yellandu area.
Read moreDevelopment, operation and maintenance of ropeway and glass bridge skywalk at bhadrakali lake on dbfot mode for a period of 30 years
Development, operation and maintenance of ropeway and glass bridge skywalk at bhadrakali lake on dbfot mode for a period of 30 years
Read moreProviding 65 nos. private security guards and 1 no. private security supervisor on outsourcing at s and pc department, rg2 area for a period of 24 months under unit rate system.
Providing 65 nos. private security guards and 1 no. private security supervisor on outsourcing at s and pc department, rg2 area for a period of 24 months under unit rate system.
Read moreHiring of 2 nos. of diesel operated wheel mounted loaders with backhoe bucket (0.26 cu.m) and loading bucket (1.1 cu.m) for 36 months one at each section of pkoc, manuguru for improvement of quality of coal - reg.
Hiring of 2 nos. of diesel operated wheel mounted loaders with backhoe bucket (0.26 cu.m) and loading bucket (1.1 cu.m) for 36 months one at each section of pkoc, manuguru for improvement of quality of coal - reg.
Read moreOperation and maintenance of (33/11kv and 11kv )substations with distribution transformer (at various pumping stations) under narsapur segment, medak division for fy 2026-27, (for the period from 01.10.2026 to 31.03.2027)
Operation and maintenance of (33/11kv and 11kv )substations with distribution transformer (at various pumping stations) under narsapur segment, medak division for fy 2026-27, (for the period from 01.10.2026 to 31.03.2027)
Read moreOperation and maintenance of (33/11kv and 11kv ) substations with distribution transformer (at various pumping stations) under medak segment (08), medak division for fy 2026-27, (for the period from 01.10.2026 to 31.03.2027)
Operation and maintenance of (33/11kv and 11kv ) substations with distribution transformer (at various pumping stations) under medak segment (08), medak division for fy 2026-27, (for the period from 01.10.2026 to 31.03.2027)
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreOperation of water pumps at santacruz bus depot / period 36 months
Operation of water pumps at santacruz bus depot / period 36 months
Read moreOperation of water pumps at malvani bus depot. (period-36 months)
Operation of water pumps at malvani bus depot. (period-36 months)
Read moreOperation of water pumps at multistoreyed building, annex building, grainshop building and docking pit shed at colaba bus depot period 36 months.
Operation of water pumps at multistoreyed building, annex building, grainshop building and docking pit shed at colaba bus depot period 36 months.&#x0d &#x0d
Read moreof your Industry type